MM Prince William Energy
14811 Dumfries Road, Manassas, VA 20112Plant Summary Information
MM Prince William Energy is ranked #39 out of 297 landfill gas power plants nationwide in terms of total annual net electricity generation.
MM Prince William Energy is comprised of 5 generators and generated 15.9 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | MM Prince William Energy |
---|---|
Utility Name | MM Prince William Energy LLC |
Location | Prince William County, VA |
Initial Operation Date | November 1998 |
Last Update | Dec 2022 |
Annual Generation | 51.9 GWh |
Annual Consumption | 627.1 k MMBtu |
Ranked #3,765 out of 11,249 Power Plants Nationwide | |
Ranked #39 out of 297 Landfill Gas Power Plants Nationwide | |
Ranked #75 out of 192 Virginia Power Plants | |
Ranked #6 out of 17 Virginia Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Map of MM Prince William Energy
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for MM Prince William Energy.
Monthly Net Generation for MM Prince William Energy
MM Prince William Energy Details
Summary Information | |
---|---|
Plant Name | MM Prince William Energy (55156) |
Plant Address | 14811 Dumfries Road Manassas, VA 20112 |
Utility | MM Prince William Energy LLC (57230) |
Latitude, Longitude | 38.63833, -77.41472 |
Generation Dates on File | Jan 2002 to Dec 2022 |
Initial Operation Date | November 1998 |
Annual Generation | 51.9 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 97-118-00; '99-19-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Northern Virginia Elec Coop (13640) VA |
Grid Voltage | 12.40 kV |
Energy Storage | No |
Generator UNT1 Details Operating November 1998
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.9 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 0.9 MW |
Winter Capacity | 0.9 MW |
Minimum Load | 0.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 1998 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator UNT2 Details Operating November 1998
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.9 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 0.9 MW |
Winter Capacity | 0.9 MW |
Minimum Load | 0.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 1998 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator UNT3 Details Operating October 2013
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator UNT4 Details Operating October 2013
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator UNT5 Details Operating October 2013
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
MM Prince William Energy Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#29 | Georgia LFG Richland Creek Plant | Buford, GA | 57.6 GWh |
#30 | GRS Arbor Hills | Northville, MI | 57.5 GWh |
#31 | Grand Blanc Generating Station | Grand Blanc, MI | 57.0 GWh |
#32 | Dart Container Corp | Leola, PA | 56.5 GWh |
#33 | Concord Energy | Concord, NC | 54.2 GWh |
#34 | Chesterfield Landfill Gas | Chester, VA | 57.2 GWh |
#35 | Coventry Clean Energy Corporation | Coventry, VT | 53.7 GWh |
#36 | Mill Seat Renewable Energy Facility | Bergen, NY | 53.6 GWh |
#37 | Elk City Station | Bennington, NE | 53.0 GWh |
#38 | Waste Management Middle Peninsula LFGTE | Glenns, VA | 52.7 GWh |
#40 | Cumberland County PA LFG Recovery | Shippensburg, PA | 51.5 GWh |
#41 | Waste Management Rolling Meadows LFGTE | Topeka, KS | 49.7 GWh |
#42 | Blue Ridge Landfill | Chambersburg, PA | 49.4 GWh |
#43 | Brent Run Generating Station | Montrose, MI | 49.3 GWh |
#44 | Superior Landfill Gas Recovery | Savannah, GA | 49.1 GWh |
#45 | Broad Mountain | Schuylkill, PA | 48.0 GWh |
#46 | Chaffee Gas Recovery | Chaffee, NY | 47.9 GWh |
#47 | Uwharrie Mountain Renewable | Mt. Gilead, NC | 47.1 GWh |
#48 | Turnkey Landfill Gas Recovery | Rochester, NH | 46.9 GWh |
#49 | CSL Gas Recovery | Pompano Beach, FL | 46.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding MM Prince William Energy.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ameresco Stafford | Stafford, VA | 4.1 GWh | 17.6 mi |
Church Street Plant | Manassas, VA | 358.9 MWh | 8.3 mi |
Covanta Alexandria/Arlington Energy | Alexandria, VA | 158.4 GWh | 19.1 mi |
Covanta Fairfax Energy | Lorton, VA | 758.0 GWh | 10.2 mi |
DC Water Solar | Washington, DC | 5.7 GWh | 24.7 mi |
Dominion/Lo Mar | Manassas, VA | 1.0 GWh | 8.6 mi |
Energix Nokesville, LLC | Nokesville, VA | 1.6 GWh | 9.9 mi |
Gateway Gen | Manassas, VA | 367.7 MWh | 7.9 mi |
Godwin Drive Plant | Manassas, VA | 627.5 MWh | 8.7 mi |
I 95 Landfill Phase II | Lorton, VA | 24.8 GWh | 10.2 mi |
Marsh Run Generation Facility | Remington, VA | 345.7 GWh | 20.5 mi |
Possum Point | Dumfries, VA | 2.4 TWh | 10.1 mi |
Remington | Remington, VA | 717.3 GWh | 20.3 mi |
Remington Solar Facility | Remington, VA | 36.9 GWh | 20.5 mi |
Ripley | La Plata, MD | 45.3 GWh | 18.6 mi |
Synergen Panorama, LLC CSG | Fort Washington, MD | 9.2 GWh | 25.5 mi |
VMEA 1 Credit Gen | Manassas, VA | 973.5 MWh | 8.7 mi |
VMEA Peaking Gen | Manassas, VA | 179.3 MWh | 8.7 mi |
Walt Bailey Bioenergy Facility | Washington, DC | 63.6 GWh | 24.8 mi |
Water Treatment Plant Generators | Gainesville, VA | 5.0 MWh | 14 mi |