Mission
1765 Mission Dam Road, Murphy, NC 28906Plant Summary Information
Mission is ranked #28 out of 38 hydroelectric power plants in North Carolina in terms of total annual net electricity generation.
Mission is comprised of 3 generators and generated 2.7 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Mission |
---|---|
Utility Name | Northbrook Carolina Hydro II, LLC |
Location | Clay County, NC |
Initial Operation Date | December 1924 |
Last Update | Dec 2022 |
Annual Generation | 9.2 GWh |
Annual Consumption | 34.8 k MMBtu |
Ranked #6,176 out of 11,249 Power Plants Nationwide | |
Ranked #964 out of 1,354 Water Power Plants Nationwide | |
Ranked #463 out of 858 North Carolina Power Plants | |
Ranked #28 out of 38 North Carolina Water Power Plants | |
Fuel Types | Water |
Previous Operator |
Duke Energy Carolinas, LLC (2013 to 2018) Northbrook Carolina Hydro II, LLC (2019 to 2022) |
Map of Mission
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mission.
Monthly Net Generation for Mission
Mission Details
Summary Information | |
---|---|
Plant Name | Mission (2746) |
Plant Address | 1765 Mission Dam Road Murphy, NC 28906 |
Utility | Northbrook Carolina Hydro II, LLC (63010) |
Latitude, Longitude | 35.0647, -83.9258 |
Generation Dates on File | Jan 2001 to Dec 2022 |
Initial Operation Date | December 1924 |
Annual Generation | 9.2 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Carolinas (DUK) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Hiwassee River |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Carolinas, LLC (5416) NC |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Generator 1 Details Operating December 1924
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 1924 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 2 Details Operating December 1924
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 1924 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 3 Details Operating January 1943
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1943 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Mission Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#954 | Four Mile Hydropower Project | Alpena, MI | 9.4 GWh |
#955 | Bowman | Nevada City, CA | 9.4 GWh |
#956 | Eltopia Branch Canal 4.6 | Pasco, WA | 9.4 GWh |
#957 | Superior Falls | Ironwood, MI | 9.4 GWh |
#958 | Pembroke Hydro | Suncook, NH | 9.4 GWh |
#959 | Cobble Mountain | Granville, MA | 9.3 GWh |
#960 | North Gorham | Gorham, ME | 9.3 GWh |
#961 | Hatchet Creek Project | Montgomery Creek, CA | 9.3 GWh |
#962 | Eel Weir | Oswegatchie, NY | 9.3 GWh |
#963 | Auglaize Hydro | Bryan, OH | 9.2 GWh |
#965 | Carter Hydro | Berthoud, CO | 9.1 GWh |
#966 | Sibley Mill | Augusta, GA | 9.1 GWh |
#967 | Weber | South Weber, UT | 9.1 GWh |
#968 | Merrill | Merrill, WI | 9.0 GWh |
#969 | Clement Dam Hydro LLC | Tilton, NH | 9.0 GWh |
#970 | Sandstone Rapids | Town of Stephenson, WI | 8.9 GWh |
#971 | Upper Beaver Falls Project | Beaver Falls, NY | 8.9 GWh |
#972 | Way Dam | Crystal Falls, MI | 8.9 GWh |
#973 | Halsey | Auburn, CA | 8.8 GWh |
#974 | Niagara | Vinton, VA | 8.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mission.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Apalachia | Reliance, TN | 486.7 GWh | 22.1 mi |
Blue Ridge | Blue Ridge, GA | 39.5 GWh | 23.7 mi |
Burton Dam | Clayton, GA | 25.4 GWh | 28.8 mi |
Calderwood | Tallassee, TN | 689.7 GWh | 29.7 mi |
Chatuge | Hayesville, NC | 31.3 GWh | 8.2 mi |
Cheoah | Tapoco, NC | 563.6 GWh | 26.5 mi |
CS Murphy Point, LLC | Murphy, NC | 1.4 GWh | 14.6 mi |
Fontana Dam | Fontana Dam, NC | 1.1 TWh | 27.5 mi |
Franklin (NC) | Franklin, NC | 5.8 GWh | 33.1 mi |
Hiwassee Dam | Murphy, NC | 248.4 GWh | 15.4 mi |
Martins Creek Solar NC, LLC | Murphy, NC | 1.3 GWh | 5.9 mi |
Multitrade Rabun Gap, LLC | Rabun Gap, GA | 122.5 GWh | 31.9 mi |
Murphy Farm Power, LLC | Culberson, NC | 1.4 GWh | 13.9 mi |
Nacoochee | Lakemont, GA | 17.8 GWh | 32.2 mi |
Nantahala | Topton, NC | 204.6 GWh | 20.1 mi |
Nottely | Blairsville, GA | 36.3 GWh | 11.7 mi |
Ocoee 2 | Benton, TN | 90.9 GWh | 32 mi |
Ocoee 3 | Benton, TN | 187.2 GWh | 31.5 mi |
Queens Creek | Topton, NC | 3.3 GWh | 20.1 mi |
Santeetlah | Robbinsville, NC | 173.0 GWh | 26.7 mi |