Misae Solar
Co Road AA, Childress, TX 79201Plant Summary Information
Misae Solar is ranked #25 out of 170 solar farms in Texas in terms of total annual net electricity generation.
Misae Solar generated 149.2 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Misae Solar |
---|---|
Utility Name | Misae Lessee LLC |
Location | Childress County, TX |
Initial Operation Date | January 2020 |
Last Update | Oct 2024 |
Annual Generation | 470.1 GWh |
Annual Consumption | 1.7 M MMBtu |
Ranked #1,351 out of 11,866 Power Plants Nationwide | |
Ranked #72 out of 5,672 Solar Power Plants Nationwide | |
Ranked #251 out of 758 Texas Power Plants | |
Ranked #25 out of 170 Texas Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Childress Solar Park LLC (2018 to 2018) Misae Lessee LLC (2019 to 2023) |
Map of Misae Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Misae Solar.
Monthly Net Generation for Misae Solar
Misae Solar Details
Summary Information | |
---|---|
Plant Name | Misae Solar (62249) |
Plant Address | Co Road AA, Childress, TX 79201 |
Utility | Misae Lessee LLC (63048) |
Latitude, Longitude | 34.38053, -100.09963 |
Generation Dates on File | Jan 2020 to Oct 2024 |
Initial Operation Date | January 2020 |
Annual Generation | 470.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Electric Transmission Texas LLC (50174) |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator 77777 Details Operating January 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 240 MW |
Summer Capacity | 240 MW |
Winter Capacity | 240 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Time From Cold Shutdown To Full Load | 10M |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 326.8 MW |
Crystalline Silicon | Yes |
Thin Film CDTE | No |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Misae Solar Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Childress Solar Park LLC | 200 Bellevue Parkway, Suite 210, Wilmington, DE 19089 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#62 | Techren Solar II LLC | Boulder, NV | 502.5 GWh |
#63 | Galloway 1 Solar Farm | Paint Rock, TX | 500.9 GWh |
#64 | Daggett 2 | Daggett, CA | 491.4 GWh |
#65 | Pisgah Ridge Solar, LLC | Richland, TX | 496.1 GWh |
#66 | RE Maplewood | McCamey, TX | 496.1 GWh |
#67 | Taygete II Energy Project | Coyanosa, TX | 495.7 GWh |
#68 | Cool Springs Solar (Hybrid) | Bainbridge, GA | 492.2 GWh |
#69 | Centinela Solar Energy | Calexico, CA | 491.6 GWh |
#70 | SE Athos II, LLC | Desert Center, CA | 478.3 GWh |
#71 | Arica Solar | Desert Center, CA | 470.0 GWh |
#73 | Sun Mountain Solar 1 | Unincorporated Pueblo, CO | 467.8 GWh |
#74 | Townsite Solar Project Hybrid | Boulder City, NV | 445.2 GWh |
#75 | Noble Solar | Krum, TX | 458.3 GWh |
#76 | RE Tranquillity | Cantua Creek, CA | 450.4 GWh |
#77 | Taygete Energy Project LLC | Coyanosa, TX | 458.7 GWh |
#78 | Mesquite Solar 3, LLC | Tonopah, AZ | 454.4 GWh |
#79 | Fort Bend Solar LLC | East Bernard, TX | 453.2 GWh |
#80 | Pleinmont Solar 2 | Spotsylvania, VA | 447.1 GWh |
#81 | Blue Jay Solar I, LLC | Iola, TX | 439.4 GWh |
#82 | Chaparral Springs | Rosamond, CA | 442.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Misae Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Blue Summit II Wind, LLC | Vernon, TX | 375.1 GWh | 37.1 mi |
Blue Summit III Wind | Chilicothe, TX | 723.3 GWh | 33.9 mi |
Blue Summit Wind LLC | Vernon, TX | 492.6 GWh | 42.2 mi |
Briscoe Wind Farm | Silverton, TX | 414.6 GWh | 64.9 mi |
Cotton Plains Wind Farm | Floydada, TX | 195.7 GWh | 66 mi |
El Campo Wind | Truscott, TX | 753.4 GWh | 49.6 mi |
Electra Wind Farm | Oklaunion, TX | 855.3 GWh | 59.2 mi |
Foard City Wind | Crowell, TX | 1.2 TWh | 38.1 mi |
Green Pastures Wind I | Seymour, TX | 89.4 GWh | 65.2 mi |
Green Pastures Wind II | Seymour, TX | 178.7 GWh | 60.2 mi |
Griffin Trail Wind | E Seymour, TX | 730.6 GWh | 61 mi |
Lockett Windfarm | Vernon, TX | 734.5 GWh | 52.2 mi |
Longhorn Wind | Silverton, TX | 777.4 GWh | 65.9 mi |
McAdoo Wind Energy LLC | McAdoo, TX | 395.1 GWh | 66 mi |
North Fork Solar Project | Snyder, OK | 187.2 GWh | 65.7 mi |
Old Settler Wind | Floydada, TX | 552.2 GWh | 66 mi |
TG East | Truscott, TX | 1.1 TWh | 50.4 mi |
Wake Wind Energy Center | Floydada, TX | 954.0 GWh | 68.9 mi |
Western Trail Wind, LLC | Electra, TX | 1.0 TWh | 69.5 mi |
Whirlwind Energy Center | Floydada, TX | 83.9 GWh | 60.2 mi |