Milo Wind Project LLC
1169 NM HWY 114, Portales, NM 88130Plant Summary Information
Milo Wind Project LLC is ranked #34 out of 137 power plants in New Mexico in terms of total annual net electricity generation.
Milo Wind Project LLC generated 47.2 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Milo Wind Project LLC |
---|---|
Utility Name | Boralex US Operations LLC |
Location | Roosevelt County, NM |
Initial Operation Date | January 2016 |
Last Update | Dec 2023 |
Annual Generation | 200.6 GWh |
Annual Consumption | 756.7 k MMBtu |
Ranked #2,306 out of 11,852 Power Plants Nationwide | |
Ranked #705 out of 1,345 Wind Power Plants Nationwide | |
Ranked #34 out of 137 New Mexico Power Plants | |
Ranked #19 out of 30 New Mexico Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
EDF Renewable Asset Holdings, Inc. (2014 to 2022) Boralex US Operations LLC (2023 to 2023) |
Map of Milo Wind Project LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Milo Wind Project LLC.
Monthly Net Generation for Milo Wind Project LLC
Milo Wind Project LLC Details
Summary Information | |
---|---|
Plant Name | Milo Wind Project LLC (59838) |
Plant Address | 1169 NM HWY 114, Portales, NM 88130 |
Utility | Boralex US Operations LLC (66100) |
Latitude, Longitude | 33.90178, -103.34675 |
Generation Dates on File | Jan 2016 to Dec 2023 |
Initial Operation Date | January 2016 |
Annual Generation | 200.6 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southwestern Public Service Co (17718) NM |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating January 2016
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 50 MW |
Summer Capacity | 50 MW |
Winter Capacity | 50 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 25 |
Turbine Details | |
Number Of Turbines | 25 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V100-2.0 |
Design Wind Speed | 20.4 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 300 |
Milo Wind Project LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#695 | Crescent Ridge | Tiskilwa, IL | 203.8 GWh |
#696 | Corriedale Wind Energy | Cheyenne, WY | 202.5 GWh |
#697 | Chevelon Butte Phase 2 | Winslow, AZ | 201.6 GWh |
#698 | Sky River Wind Energy Center | Tehachapi, CA | 201.6 GWh |
#699 | Hog Creek Wind Project | Ada, OH | 201.3 GWh |
#700 | Delta Wind Farm (MS) | Dundee, MS | 201.2 GWh |
#701 | Scurry County Wind II | Snyder, TX | 201.1 GWh |
#702 | Red Mesa Wind LLC | Seboyeta, NM | 201.1 GWh |
#703 | Windthorst-2 | Archer, TX | 201.0 GWh |
#704 | Flat Water Wind Farm LLC | Du Bois, NE | 200.7 GWh |
#706 | Osceola Windpower II | Harris, IA | 200.3 GWh |
#707 | Buffalo Gap Wind Farm | Merkel, TX | 198.5 GWh |
#708 | Spearville 3 LLC | Spearville, KS | 198.2 GWh |
#709 | NWP Indian Mesa Wind Farm | Iraan, TX | 197.8 GWh |
#710 | Montezuma Wind II | Birds Landing, CA | 196.6 GWh |
#711 | Jericho Rise Wind Farm LLC | Chateaugay, NY | 196.1 GWh |
#712 | Weaver Wind | Township 16, ME | 195.2 GWh |
#713 | Strauss Wind Farm | Lompoc, CA | 195.1 GWh |
#714 | Nine Canyon | Kennewick, WA | 194.7 GWh |
#715 | Star Point Wind Project LLC | Wasco, OR | 194.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Milo Wind Project LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Blue Cloud Wind Energy LLC | Sudan, TX | 571.6 GWh | 40.2 mi |
Broadview Energy JN, LLC | Texico, NM | 693.6 GWh | 59.1 mi |
Broadview Energy KW, LLC | Texico, NM | 545.9 GWh | 57.9 mi |
Broadview Energy Prime 2 LLC | Grady, NM | 33.4 GWh | 57.1 mi |
Broadview Energy Prime LLC | Grady, NM | 33.4 GWh | 58.4 mi |
Casa Mesa Wind Energy Center Hybrid | House, NM | 171.1 GWh | 60.1 mi |
Grady Wind Energy Center, LLC | Clovis, NM | 870.4 GWh | 59.3 mi |
LCEC Generation LLVC | Lovington, NM | 44.1 GWh | 63.8 mi |
Middle Daisy | Lovington, NM | 7.3 GWh | 63.8 mi |
New Mexico Wind Energy Center | House, NM | 532.8 GWh | 64.6 mi |
Plant X | Earth, TX | 660.3 GWh | 56.6 mi |
Roosevelt County | Portales, NM | 1.0 TWh | 9.6 mi |
Sagamore Wind | Rogers, NM | 2.2 TWh | 9.6 mi |
San Juan Mesa Wind Project LLC | Elida, NM | 178.9 GWh | 29.8 mi |
SoCore Clovis 1 | Clovis, NM | 5.2 GWh | 36.4 mi |
Sterling I Wind Farm | Tatum, NM | 116.3 GWh | 37.9 mi |
Texico Wind Ranch LP | Texico, NM | 34.0 MWh | 35.5 mi |
Tolk | Muleshoe, TX | 1.9 TWh | 48.6 mi |
Wildcat Ranch Wind Project | Morton, TX | 669.1 GWh | 33.9 mi |
Wildcat Wind | Lovington, NM | 56.5 GWh | 65.7 mi |