Milford Wind Corridor Stage II LLC
2390 East First Wind Road, Milford, UT 84751Plant Summary Information
Milford Wind Corridor Stage II LLC is ranked #30 out of 121 power plants in Utah in terms of total annual net electricity generation.
Milford Wind Corridor Stage II LLC generated 47.1 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Milford Wind Corridor Stage II LLC |
---|---|
Utility Name | Milford Wind Corridor Stage II LLC |
Location | Beaver County, UT |
Initial Operation Date | May 2011 |
Last Update | Aug 2024 |
Annual Generation | 162.6 GWh |
Annual Consumption | 590.1 k MMBtu |
Ranked #2,563 out of 11,835 Power Plants Nationwide | |
Ranked #771 out of 1,343 Wind Power Plants Nationwide | |
Ranked #30 out of 121 Utah Power Plants | |
Ranked #2 out of 5 Utah Wind Power Plants | |
Fuel Types | Wind |
Map of Milford Wind Corridor Stage II LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Milford Wind Corridor Stage II LLC.
Monthly Net Generation for Milford Wind Corridor Stage II LLC
Milford Wind Corridor Stage II LLC Details
Summary Information | |
---|---|
Plant Name | Milford Wind Corridor Stage II LLC (57107) |
Plant Address | 2390 East First Wind Road, Milford, UT 84751 |
Utility | Milford Wind Corridor Stage II LLC (56409) |
Latitude, Longitude | 38.58523, -112.931 |
Generation Dates on File | May 2011 to Aug 2024 |
Initial Operation Date | May 2011 |
Annual Generation | 162.6 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG11-43 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Intermountain Power Agency (40576) |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator 1 Details Operating May 2011
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 102 MW |
Summer Capacity | 102 MW |
Winter Capacity | 102 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2011 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 68 |
Multiple Fuels | No |
Cofire Fuels | No |
Turbine Details | |
Number Of Turbines | 68 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.5 SLE |
Design Wind Speed | 19 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262 |
Milford Wind Corridor Stage II LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#761 | Woodward Mountain II | Girvin, TX | 168.8 GWh |
#762 | Allegheny Ridge Wind Farm | Portage, PA | 167.6 GWh |
#763 | Highland North Wind Farm | Sidman, PA | 167.3 GWh |
#764 | Whitetail | Oilton, TX | 166.7 GWh |
#765 | Summit Winds | Livermore, CA | 166.5 GWh |
#766 | Hawkeye Power Partners LLC | Garner, IA | 166.1 GWh |
#767 | Sweetwater Wind 5 | Roscoe, TX | 165.2 GWh |
#768 | Centennial Wind Farm | Fort Supply, OK | 164.2 GWh |
#769 | Ashtabula Wind III LLC | Luverne, ND | 163.9 GWh |
#770 | Heartland Farms | Middleton, MI | 162.6 GWh |
#772 | Whitney Hill Wind Power LLC | Mt.Pulaski, IL | 162.0 GWh |
#773 | Cedar Ridge | Eden, WI | 161.3 GWh |
#774 | Bliss | Bliss, NY | 160.8 GWh |
#775 | Langdon Wind II LLC | Osnabrock, ND | 159.9 GWh |
#776 | Luverne Wind Energy Center | Luverne, ND | 159.5 GWh |
#777 | Elkhorn Ridge Wind LLC | Bloomfield, NE | 157.2 GWh |
#778 | Kit Carson Windpower | Burlington, CO | 156.9 GWh |
#779 | Lakeswind Power Partners | Pelican Rapids, MN | 154.7 GWh |
#780 | Hardscrabble Wind Power LLC | Little Falls, NY | 154.7 GWh |
#781 | Oklahoma Wind Energy Center | Woodward, OK | 153.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Milford Wind Corridor Stage II LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Blue Mountain Biogas | Milford, UT | 12.0 MWh | 34.7 mi |
Blundell | Milford, UT | 248.2 GWh | 7.9 mi |
Buckhorn Solar Plant | Paragonah, UT | 5.8 GWh | 40.3 mi |
Enel Cove Fort | Cove Fort, UT | 155.0 GWh | 19 mi |
Escalante Solar I, LLC | Milford, UT | 212.6 GWh | 7 mi |
Escalante Solar II, LLC | Milford, UT | 212.9 GWh | 7.9 mi |
Escalante Solar III, LLC | Milford, UT | 209.7 GWh | 6.8 mi |
Granite Peak Solar Plant | Milford, UT | 6.1 GWh | 13 mi |
Greenville Solar Plant | Milford, UT | 4.3 GWh | 25.1 mi |
Laho Solar Plant | Milford, UT | 6.1 GWh | 21.1 mi |
Milford 2 | Milford, UT | 6.5 GWh | 14 mi |
Milford Flat Solar Plant | Milford, UT | 6.1 GWh | 20.7 mi |
Milford Solar 1 | Milford, UT | 260.4 GWh | 8.1 mi |
Milford Wind Corridor I LLC | Milford, UT | 346.0 GWh | 3.4 mi |
Pavant Solar, LLC | Fillmore, UT | 110.1 GWh | 40.1 mi |
Smithfield 3 | Milford, UT | 2.0 GWh | 26.7 mi |
South Milford Solar Plant | Milford, UT | 7.1 GWh | 20.1 mi |
Thermo No 1 | Milford, UT | 54.8 GWh | 32.6 mi |
Upper Beaver | Beaver, UT | 10.2 GWh | 32.8 mi |
Utah Red Hills Renewable Energy Park | Parowan, UT | 189.8 GWh | 48.6 mi |