Milford Wind Corridor I LLC
2390 East First Wind Rd, Milford, UT 84751Plant Summary Information
Milford Wind Corridor I LLC is ranked #11 out of 121 power plants in Utah in terms of total annual net electricity generation.
Milford Wind Corridor I LLC generated 99.3 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Milford Wind Corridor I LLC |
---|---|
Utility Name | Milford Wind Corridor Phase I, LLC (Longroad) |
Location | Beaver County, UT |
Initial Operation Date | September 2009 |
Last Update | Oct 2024 |
Annual Generation | 350.7 GWh |
Annual Consumption | 1.3 M MMBtu |
Ranked #1,659 out of 11,866 Power Plants Nationwide | |
Ranked #485 out of 1,345 Wind Power Plants Nationwide | |
Ranked #11 out of 121 Utah Power Plants | |
Ranked #1 out of 5 Utah Wind Power Plants | |
Fuel Types | Wind |
Previous Operators |
First Wind O&M, LLC (2013 to 2017) Longroad Energy Services LLC (2018 to 2022) Milford Wind Corridor Phase I, LLC (Longroad) (2023 to 2023) |
Map of Milford Wind Corridor I LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Milford Wind Corridor I LLC.
Monthly Net Generation for Milford Wind Corridor I LLC
Milford Wind Corridor I LLC Details
Summary Information | |
---|---|
Plant Name | Milford Wind Corridor I LLC (57079) |
Plant Address | 2390 East First Wind Rd, Milford, UT 84751 |
Utility | Milford Wind Corridor Phase I, LLC (Longroad) (65908) |
Latitude, Longitude | 38.53569, -112.935 |
Generation Dates on File | Nov 2009 to Oct 2024 |
Initial Operation Date | September 2009 |
Annual Generation | 350.7 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG09-71 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Intermountain Power Agency (40576) |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator 1 Details Operating September 2009
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 203.5 MW |
Summer Capacity | 203.5 MW |
Winter Capacity | 203.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2009 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 97 |
Cofire Fuels | No |
Turbine Details | |
Number Of Turbines | 97 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.5 XLE |
Design Wind Speed | 13.2 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 262.4 |
Milford Wind Corridor I LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#475 | Alta Wind Energy Center I | Mojave, CA | 361.0 GWh |
#476 | Baldwin Wind LLC | Wilton, ND | 360.4 GWh |
#477 | Buckthorn Wind | Mingus, TX | 360.0 GWh |
#478 | Trimont Area Wind Farm | Trimont, MN | 356.4 GWh |
#479 | Lorenzo Wind | Lorenzo, TX | 356.3 GWh |
#480 | Lakefield Wind Project LLC | Lakefield, MN | 356.1 GWh |
#481 | Arbuckle Mountain Wind Farm LLC | Davis, OK | 354.6 GWh |
#482 | Seiling Wind II | Seiling, OK | 353.5 GWh |
#483 | Hackberry Wind Farm | Albany, TX | 352.4 GWh |
#484 | Morning Light Wind Farm | Adair, IA | 351.7 GWh |
#486 | High Lonesome Mesa LLC | Willard, NM | 350.1 GWh |
#487 | Barton Windpower LLC | Kensett, IA | 349.7 GWh |
#488 | Tuscola Bay Wind | Reese, MI | 348.8 GWh |
#489 | Pine River Wind Park | Shepherd, MI | 347.5 GWh |
#490 | Contrail Wind Farm | Bedford, IA | 347.5 GWh |
#491 | White Rock East Wind Project | Anadarko, OK | 346.7 GWh |
#492 | Spinning Spur Wind LLC | Vegas, TX | 346.5 GWh |
#493 | Cameron Wind 1 LLC | Rio Hondo, TX | 346.0 GWh |
#494 | Turkey Track Wind Energy LLC | Blackwell, TX | 345.7 GWh |
#495 | Sac County Wind, LLC | Sac City, IA | 345.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Milford Wind Corridor I LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Blue Mountain Biogas | Milford, UT | 12.0 MWh | 31.8 mi |
Blundell | Milford, UT | 248.2 GWh | 5.5 mi |
Buckhorn Solar Plant | Paragonah, UT | 5.8 GWh | 37.1 mi |
Enel Cove Fort | Cove Fort, UT | 155.0 GWh | 19.2 mi |
Escalante Solar I, LLC | Milford, UT | 211.1 GWh | 5.4 mi |
Escalante Solar II, LLC | Milford, UT | 211.9 GWh | 5.7 mi |
Escalante Solar III, LLC | Milford, UT | 208.5 GWh | 3.8 mi |
Granite Peak Solar Plant | Milford, UT | 6.1 GWh | 9.6 mi |
Greenville Solar Plant | Milford, UT | 4.3 GWh | 22.1 mi |
Laho Solar Plant | Milford, UT | 6.1 GWh | 17.7 mi |
Milford 2 | Milford, UT | 6.5 GWh | 10.6 mi |
Milford Flat Solar Plant | Milford, UT | 6.1 GWh | 17.3 mi |
Milford Solar 1 | Milford, UT | 253.9 GWh | 5.5 mi |
Milford Wind Corridor Stage II LLC | Milford, UT | 160.9 GWh | 3.4 mi |
Pavant Solar, LLC | Fillmore, UT | 110.0 GWh | 42.6 mi |
Smithfield 3 | Milford, UT | 2.0 GWh | 23.4 mi |
South Milford Solar Plant | Milford, UT | 7.1 GWh | 16.8 mi |
Thermo No 1 | Milford, UT | 54.8 GWh | 29.5 mi |
Upper Beaver | Beaver, UT | 10.2 GWh | 30.8 mi |
Utah Red Hills Renewable Energy Park | Parowan, UT | 189.8 GWh | 45.1 mi |