Milford Solar 1
6140 North 2200 West, Milford, UT 84751Plant Summary Information
Milford Solar 1 is ranked #15 out of 121 power plants in Utah in terms of total annual net electricity generation.
Milford Solar 1 generated 37.7 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | Milford Solar 1 |
---|---|
Utility Name | Milford Solar 1, LLC |
Location | Beaver County, UT |
Initial Operation Date | November 2020 |
Last Update | Jan 2025 |
Annual Generation | 255.2 GWh |
Annual Consumption | 908.3 k MMBtu |
Ranked #2,063 out of 11,979 Power Plants Nationwide | |
Ranked #227 out of 5,765 Solar Power Plants Nationwide | |
Ranked #15 out of 121 Utah Power Plants | |
Ranked #3 out of 51 Utah Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Longroad Energy Services LLC (2018 to 2018) Milford Solar I (NES) (2019 to 2022) Milford Solar 1, LLC (2023 to 2023) |
Map of Milford Solar 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Milford Solar 1.
Monthly Net Generation for Milford Solar 1
Milford Solar 1 Details
Summary Information | |
---|---|
Plant Name | Milford Solar 1 (62812) |
Plant Address | 6140 North 2200 West, Milford, UT 84751 |
Utility | Milford Solar 1, LLC (66040) |
Latitude, Longitude | 38.49067, -113.01828 |
Generation Dates on File | Nov 2020 to Jan 2025 |
Initial Operation Date | November 2020 |
Annual Generation | 255.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | PacifiCorp - East (PACE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | PacifiCorp (14354) UT |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator MS1 Details Operating November 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 99 MW |
Summer Capacity | 99 MW |
Winter Capacity | 99 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 127.8 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Milford Solar 1 Plant Owners
Owner Name | Address | Ownership |
---|---|---|
New Energy Solar | 276 5th Avenue, Suite 805, New York, NY 10001 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#217 | Ivanpah 2 | Nipton, CA | 275.1 GWh |
#218 | Ivanpah 3 | Nipton, CA | 274.7 GWh |
#219 | Sunshine Valley Solar | Armagosa, NV | 262.8 GWh |
#220 | Catalina Solar LLC | Rosamond, CA | 262.7 GWh |
#221 | South Cheyenne Solar | South Greeley, WY | 259.9 GWh |
#222 | Jackpot Solar, LLC | Twin Falls, ID | 259.2 GWh |
#223 | Rabbitbrush Solar, LLC | Rosamond, CA | 256.1 GWh |
#224 | Red Tailed Hawk Solar LLC | Pierce, TX | 257.9 GWh |
#225 | Maverick Solar 6, LLC | Desert Center, CA | 251.8 GWh |
#226 | San Pablo Raceway | Lancaster, CA | 257.1 GWh |
#228 | Nebula Solar | La Feria, TX | 253.0 GWh |
#229 | Resurgence Solar | Boron, CA | 240.5 GWh |
#230 | OCI Alamo 7 LLC | Haskell, TX | 250.2 GWh |
#231 | Antelope Expansion 2 | Lancaster, CA | 249.7 GWh |
#232 | Fish Springs | Reno, NV | 245.3 GWh |
#233 | Springbok 3 Solar Farm Hybrid | Cantil, CA | 247.4 GWh |
#234 | Wilmot Energy Center LLC | Tucson, AZ | 244.8 GWh |
#235 | Playa Solar 2 | North Las Vegas, NV | 246.3 GWh |
#236 | East Line Solar | Coolidge, AZ | 245.1 GWh |
#237 | Old 300 Solar Center, LLC | Needville, TX | 244.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Milford Solar 1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Appaloosa Solar I | Cedar City, UT | 130.1 GWh | 45.4 mi |
Blue Mountain Biogas | Milford, UT | 12.0 MWh | 26.6 mi |
Blundell | Milford, UT | 248.2 GWh | 8.9 mi |
Buckhorn Solar Plant | Paragonah, UT | 5.8 GWh | 35.8 mi |
Enel Cove Fort | Cove Fort, UT | 155.0 GWh | 24.1 mi |
Escalante Solar I, LLC | Milford, UT | 212.6 GWh | 2.5 mi |
Escalante Solar II, LLC | Milford, UT | 213.9 GWh | 0.9 mi |
Escalante Solar III, LLC | Milford, UT | 210.9 GWh | 1.8 mi |
Granite Peak Solar Plant | Milford, UT | 6.1 GWh | 6.3 mi |
Greenville Solar Plant | Milford, UT | 4.3 GWh | 22.3 mi |
Laho Solar Plant | Milford, UT | 6.1 GWh | 13.8 mi |
Milford 2 | Milford, UT | 6.5 GWh | 7.2 mi |
Milford Flat Solar Plant | Milford, UT | 6.1 GWh | 13.8 mi |
Milford Wind Corridor I LLC | Milford, UT | 376.3 GWh | 5.5 mi |
Milford Wind Corridor Stage II LLC | Milford, UT | 171.5 GWh | 8.1 mi |
Smithfield 3 | Milford, UT | 2.0 GWh | 19 mi |
South Milford Solar Plant | Milford, UT | 7.1 GWh | 12.6 mi |
Thermo No 1 | Milford, UT | 54.8 GWh | 24.7 mi |
Upper Beaver | Beaver, UT | 10.2 GWh | 32.9 mi |
Utah Red Hills Renewable Energy Park | Parowan, UT | 189.8 GWh | 42.5 mi |