Mile 28 Water Power Project
28 Milner Gooding Canal, Eden, ID 83325Plant Summary Information
Mile 28 Water Power Project is ranked #66 out of 76 hydroelectric power plants in Idaho in terms of total annual net electricity generation.
Mile 28 Water Power Project is comprised of 2 generators and generated 1.7 GWh during the 3-month period between July 2023 to October 2023.
Plant Name | Mile 28 Water Power Project |
---|---|
Utility Name | Wood Hydro, LLC |
Location | Jerome County, ID |
Initial Operation Date | June 1994 |
Last Update | Oct 2023 |
Annual Generation | 4.3 GWh |
Annual Consumption | 15.7 k MMBtu |
Ranked #7,949 out of 11,852 Power Plants Nationwide | |
Ranked #1,199 out of 1,371 Water Power Plants Nationwide | |
Ranked #129 out of 141 Idaho Power Plants | |
Ranked #66 out of 76 Idaho Water Power Plants | |
Fuel Types | Water |
Previous Operator |
Mi-28 Water Power Project LLC (2013 to 2017) Wood Hydro, LLC (2018 to 2023) |
Map of Mile 28 Water Power Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mile 28 Water Power Project.
Monthly Net Generation for Mile 28 Water Power Project
Mile 28 Water Power Project Details
Summary Information | |
---|---|
Plant Name | Mile 28 Water Power Project (54812) |
Plant Address | 28 Milner Gooding Canal, Eden, ID 83325 |
Utility | Wood Hydro, LLC (62045) |
Latitude, Longitude | 42.74014, -114.16117 |
Generation Dates on File | Jan 2001 to Oct 2023 |
Initial Operation Date | June 1994 |
Annual Generation | 4.3 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 94-59-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Idaho Power Company (IPCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Milner- Cooling Canal |
Ash Impoundment | No |
Transmission / Distribution Owner | Idaho Power Co (9191) ID |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator 1 Details Operating June 1994
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.7 MW |
Nameplate Power Factor | 0.75 |
Summer Capacity | 0.7 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1994 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 2 Details Operating June 1994
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.7 MW |
Nameplate Power Factor | 0.75 |
Summer Capacity | 0.7 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1994 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Mile 28 Water Power Project Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1189 | Gantt | Andalusia, AL | 4.5 GWh |
#1190 | Lower No 2 | Idaho Falls, ID | 4.5 GWh |
#1191 | Salisbury | Salisbury, VT | 4.5 GWh |
#1192 | West Danville 15 | Danville, VT | 4.5 GWh |
#1193 | Little Cottonwood | Sandy, UT | 4.4 GWh |
#1194 | Piedmont Hydro Power Project | Piedmont, SC | 4.4 GWh |
#1195 | Oconto Falls Lower | Oconto Falls, WI | 4.4 GWh |
#1196 | Robert D Willis | Jasper, TX | 4.4 GWh |
#1197 | Pine View Dam | Ogden, UT | 4.4 GWh |
#1198 | Lochmere Hydroelectric Plant | Tilton, NH | 4.3 GWh |
#1200 | Cornell Hydro | Ithaca, NY | 4.3 GWh |
#1201 | Rhinelander Mill | Rhinelander, WI | 4.2 GWh |
#1202 | Dam No. 4 Hydro Station | Shepherdstown, WV | 4.2 GWh |
#1203 | Lacomb Irrigation District | Lebanon, OR | 4.2 GWh |
#1204 | Potato Rapids | Town of Porterfield, WI | 4.2 GWh |
#1205 | Corona | Corona, CA | 4.1 GWh |
#1206 | Lower Middlebury | Middlebury Lower, VT | 4.1 GWh |
#1207 | Smith (VT) | Bradford, VT | 4.0 GWh |
#1208 | Rollinsford | Rollinsford, NH | 4.0 GWh |
#1209 | China Mill Hydro | Allenstown, NH | 4.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mile 28 Water Power Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Amalgamated Sugar Twin Falls | Twin Falls, ID | 36.5 GWh | 19.9 mi |
Burley Butte Windpark | Burley, ID | 49.5 GWh | 21 mi |
Bypass | Hazelton, ID | 29.6 GWh | 13.5 mi |
Clif Bar Bakery of Twin Falls | Twin Falls, ID | 2.8 GWh | 18.8 mi |
Crystal Springs | Filer, ID | 8.9 GWh | 19.1 mi |
Dietrich Drop | Shoshone, ID | 10.5 GWh | 8.6 mi |
GeoBon II | Shoshone, ID | 55.0 MWh | 21.3 mi |
Hazelton B Hydro | Hazelton, ID | 24.8 GWh | 10 mi |
Head of U Canal Hydro Project | Jerome, ID | 4.9 GWh | 12 mi |
Low Line Rapids | Kimberly, ID | 8.9 GWh | 21.3 mi |
Milner Butte LFGE | Burley, ID | 18.4 GWh | 20.5 mi |
Milner Dam Wind Park LLC | Burley, ID | 46.6 GWh | 20.7 mi |
Milner Hydro | Murtaugh, ID | 29.0 GWh | 16 mi |
Rock Creek I | Twin Falls, ID | 9.6 GWh | 20.6 mi |
Rock Creek II | Twin Falls, ID | 5.8 GWh | 20.5 mi |
S E Hazelton A | Hazelton, ID | 25.9 GWh | 11.6 mi |
Shoshone Falls | Twin Falls, ID | 42.3 GWh | 15.8 mi |
South Forks Hydro | Hansen, ID | 29.8 GWh | 18.6 mi |
Twin Falls (ID) | Kimberly, ID | 37.1 GWh | 14.4 mi |
Wilson Lake Hydroelectric Project | Eden, ID | 29.2 GWh | 7.7 mi |