Midulla Generating Station
6697 County Road 663, Bowling Green, FL 33834Plant Summary Information
Midulla Generating Station is ranked #29 out of 279 power plants in Florida in terms of total annual net electricity generation.
Midulla Generating Station is comprised of 8 generators and generated 834.0 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Midulla Generating Station |
---|---|
Utility Name | Seminole Electric Cooperative Inc |
Location | Hardee County, FL |
Initial Operation Date | January 2002 |
Last Update | Sep 2024 |
Annual Generation | 2.1 TWh |
Annual Consumption | 16.8 M MMBtu |
Ranked #509 out of 11,852 Power Plants Nationwide | |
Ranked #314 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #29 out of 279 Florida Power Plants | |
Ranked #27 out of 85 Florida Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Midulla Generating Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Midulla Generating Station.
Monthly Net Generation for Midulla Generating Station
Midulla Generating Station Details
Summary Information | |
---|---|
Plant Name | Midulla Generating Station (7380) |
Plant Address | 6697 County Road 663, Bowling Green, FL 33834 |
Utility | Seminole Electric Cooperative Inc (21554) |
Latitude, Longitude | 27.64167, -81.9625 |
Generation Dates on File | Jan 2002 to Sep 2024 |
Initial Operation Date | January 2002 |
Annual Generation | 2.1 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Seminole Electric Cooperative (SEC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Wells |
Ash Impoundment | No |
Transmission / Distribution Owner | Seminole Electric Cooperative Inc (21554) |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name |
FLORIDA GAS TRANSMISSION COMPANY GULFSTREAM NATURAL GAS SYSTEM LLC |
Natural Gas Storage | No |
Generator CT1 Details Operating January 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CCU1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 181.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 179 MW |
Winter Capacity | 198 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 179 MW |
Net Winter Capacity With Natural Gas | 180 MW |
Net Summer Capacity With Oil | 170 MW |
Net Winter Capacity With Oil | 170 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator CT2 Details Operating January 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CCU1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 181.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 179 MW |
Winter Capacity | 198 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 179 MW |
Net Winter Capacity With Natural Gas | 180 MW |
Net Summer Capacity With Oil | 170 MW |
Net Winter Capacity With Oil | 170 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator ST3 Details Operating January 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CCU1 |
Ownership | Single Owner |
Duct Burners | No |
Nameplate Capacity | 181.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 185 MW |
Winter Capacity | 187 MW |
Minimum Load | 62 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 179 MW |
Net Winter Capacity With Natural Gas | 179 MW |
Net Summer Capacity With Oil | 162 MW |
Net Winter Capacity With Oil | 162 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Generator GT4 Details Operating December 2006
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 62 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 54 MW |
Winter Capacity | 62 MW |
Minimum Load | 14 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2006 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 54 MW |
Net Winter Capacity With Natural Gas | 62 MW |
Net Summer Capacity With Oil | 53 MW |
Net Winter Capacity With Oil | 56 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT5 Details Operating December 2006
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 62 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 54 MW |
Winter Capacity | 62 MW |
Minimum Load | 14 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2006 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 54 MW |
Net Winter Capacity With Natural Gas | 62 MW |
Net Summer Capacity With Oil | 52 MW |
Net Winter Capacity With Oil | 60 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT6 Details Operating December 2006
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 62 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 54 MW |
Winter Capacity | 62 MW |
Minimum Load | 14 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2006 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 54 MW |
Net Winter Capacity With Natural Gas | 62 MW |
Net Summer Capacity With Oil | 53 MW |
Net Winter Capacity With Oil | 60 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT7 Details Operating December 2006
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 62 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 54 MW |
Winter Capacity | 62 MW |
Minimum Load | 14 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2006 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 54 MW |
Net Winter Capacity With Natural Gas | 62 MW |
Net Summer Capacity With Oil | 53 MW |
Net Winter Capacity With Oil | 60 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT8 Details Operating December 2006
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 62 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 27 MW |
Winter Capacity | 31 MW |
Minimum Load | 14 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2006 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 27 MW |
Net Winter Capacity With Natural Gas | 31 MW |
Net Summer Capacity With Oil | 26 MW |
Net Winter Capacity With Oil | 30 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Midulla Generating Station Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#304 | Front Range Power Plant | Fountain, CO | 2.2 TWh |
#305 | Lewis Creek | Willis, TX | 2.2 TWh |
#306 | Goldendale Generating Station | Goldendale, WA | 2.2 TWh |
#307 | Mustang Station | Denver City, TX | 2.2 TWh |
#308 | Greater Des Moines | Pleasant Hill, IA | 2.1 TWh |
#309 | W A Parish | Thompsons, TX | 11.5 TWh |
#310 | Northside Generating Station | Jacksonville, FL | 3.0 TWh |
#311 | Brooklyn Navy Yard Cogeneration | Brooklyn, NY | 2.1 TWh |
#312 | Louisiana 1 | Baton Rouge, LA | 2.8 TWh |
#313 | Freeport Energy | Freeport, TX | 2.1 TWh |
#315 | Texas City Power Plant | Texas City, TX | 2.1 TWh |
#316 | Jim Bridger | Point of Rocks, WY | 8.3 TWh |
#317 | Coyote Springs | Boardman, OR | 2.0 TWh |
#318 | Apache Station | Cochise, AZ | 2.2 TWh |
#319 | Bayou Cogen Plant | Pasadena, TX | 2.3 TWh |
#320 | Sand Hill | Austin, TX | 2.0 TWh |
#321 | Hidalgo Energy Center | Edinburg, TX | 2.0 TWh |
#322 | Frontera Energy Center | Mission, TX | 2.0 TWh |
#323 | ANP Blackstone Energy Project | Blackstone, MA | 2.0 TWh |
#324 | Watson Cogeneration | Carson, CA | 2.4 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Midulla Generating Station.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alafia Solar | Mulberry, FL | 105.4 GWh | 6.8 mi |
Duette Solar Power Plant | Parrish, FL | 152.8 GWh | 7.2 mi |
Durrance | Mulberry, FL | 108.3 GWh | 9.6 mi |
Fort Green Solar Power Plant | Bowling Green, FL | 158.8 GWh | 1.3 mi |
Grange Hall Solar | Wimauma, FL | 103.3 GWh | 12.7 mi |
Hardee Power Station | Bowling Green, FL | 929.5 GWh | 0.4 mi |
Hines Energy Complex | Bartow, FL | 11.6 TWh | 11.6 mi |
Jamison Solar (FL) | Mulberry, FL | 140.9 GWh | 11.4 mi |
Lake Hancock Solar | Bartow, FL | 90.8 GWh | 6.9 mi |
Lithia Solar | Lithia, FL | 125.7 GWh | 14.6 mi |
Mosaic New Wales Operations | Mulberry, FL | 420.4 GWh | 14.3 mi |
Mosaic South Pierce Operations | Mulberry, FL | 140.2 GWh | 8.7 mi |
Mulberry Cogeneration Facility | Bartow, FL | 399.7 GWh | 15.2 mi |
Payne Creek Solar | Bowling Green, FL | 121.5 GWh | 1.6 mi |
Polk | Mulberry, FL | 5.8 TWh | 6.2 mi |
Sambucus | Myakka City, FL | 115.1 GWh | 14.7 mi |
Southfork Solar | Parrish, FL | 172.5 GWh | 14.8 mi |
Tiger Bay | Ft. Meade, FL | 1.1 TWh | 10 mi |
Vandolah Power Station | Wauchula, FL | 624.7 GWh | 8.5 mi |
Willow Solar Energy Center | Myakka City, FL | 156.9 GWh | 15.2 mi |