Midland Cogeneration Venture
100 Progress Place, Midland, MI 48640Plant Summary Information
Midland Cogeneration Venture is ranked #11 out of 2,253 natural gas power plants nationwide in terms of total annual net electricity generation.
Midland Cogeneration Venture is comprised of 16 generators and generated 2.9 TWh during the 3-month period between May 2024 to August 2024.
Plant Name | Midland Cogeneration Venture |
---|---|
Utility Name | Midland Cogeneration Venture |
Location | Midland County, MI |
Initial Operation Date | June 1989 |
Last Update | Aug 2024 |
Annual Generation | 10.8 TWh |
Annual Consumption | 106.4 M MMBtu |
Ranked #57 out of 11,835 Power Plants Nationwide | |
Ranked #11 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #3 out of 255 Michigan Power Plants | |
Ranked #1 out of 72 Michigan Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Midland Cogeneration Venture
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Midland Cogeneration Venture.
Monthly Net Generation for Midland Cogeneration Venture
Midland Cogeneration Venture Details
Summary Information | |
---|---|
Plant Name | Midland Cogeneration Venture (10745) |
Plant Address | 100 Progress Place, Midland, MI 48640 |
Utility | Midland Cogeneration Venture (12492) |
Latitude, Longitude | 43.5861, -84.2242 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | June 1989 |
Annual Generation | 10.8 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 87-237-001, 87-237-018 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP CHP (3) |
Water Source | Tittabawasse River |
Ash Impoundment | No |
Transmission / Distribution Owner | Michigan Electric Transmission Company (56163) MI |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | CONSUMERS ENERGY COMPANY |
Pipeline Name | GREAT LAKES GAS TRANSMISSION LP |
Natural Gas Storage | No |
Generator GT6 Details Operating October 1989
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | 1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 87.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 88 MW |
Winter Capacity | 103 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 1989 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator GT8 Details Operating December 1989
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | 1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 87.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 88 MW |
Winter Capacity | 103 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 1989 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator GT3 Details Operating June 1989
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | 1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 87.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 88 MW |
Winter Capacity | 103 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1989 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator GT4 Details Operating August 1989
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | 1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 87.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 88 MW |
Winter Capacity | 103 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1989 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator GT5 Details Operating September 1989
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | 1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 87.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 88 MW |
Winter Capacity | 103 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 1989 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator GT7 Details Operating September 1989
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | 1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 87.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 88 MW |
Winter Capacity | 103 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 1989 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator GT10 Details Operating January 1990
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | 1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 87.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 88 MW |
Winter Capacity | 103 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1990 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator GT9 Details Operating January 1990
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | 1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 87.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 88 MW |
Winter Capacity | 103 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1990 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator 1G12 Details Standby February 1990
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 5.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 5.2 MW |
Winter Capacity | 5.2 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
---|---|
First Operation Date | February 1990 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator GT11 Details Operating February 1990
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | 1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 87.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 88 MW |
Winter Capacity | 103 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 1990 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator ST1 Details Operating February 1990
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | 1 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 410 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 410 MW |
Winter Capacity | 410 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 1990 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Generator GT12 Details Operating March 1990
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | 1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 87.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 88 MW |
Winter Capacity | 103 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 1990 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator GT13 Details Operating April 1990
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | 1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 87.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 88 MW |
Winter Capacity | 103 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 1990 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator GT14 Details Operating May 1990
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | 1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 87.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 88 MW |
Winter Capacity | 103 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 1990 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator ST2 Details Standby September 1990
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | 1 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 380 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 380 MW |
Winter Capacity | 380 MW |
Minimum Load | 40 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | Yes |
First Operation Date | September 1990 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Generator BP15 Details Operating July 1998
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | 1 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 13.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 13.4 MW |
Winter Capacity | 13.4 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1998 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Midland Cogeneration Venture Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | West County Energy Center | Loxahatchee, FL | 21.1 TWh |
#2 | Jack McDonough | Smyrna, GA | 18.3 TWh |
#3 | Crystal River | Crystal River, FL | 16.5 TWh |
#4 | H Allen Franklin Combined Cycle | Smiths, AL | 12.3 TWh |
#5 | Greensville County Power Station | Emporia, VA | 12.0 TWh |
#6 | Barry | Bucks, AL | 12.4 TWh |
#7 | Union Power Station | El Dorado, AR | 11.6 TWh |
#8 | Guernsey Power Station | Byesville, OH | 11.5 TWh |
#9 | Hines Energy Complex | Bartow, FL | 11.3 TWh |
#10 | Okeechobee Clean Energy Center | Okeechobee, FL | 11.1 TWh |
#12 | Lackawanna Energy Center | Jessup, PA | 10.3 TWh |
#13 | Forney Energy Center | Forney, TX | 9.9 TWh |
#14 | Hanging Rock Energy Facility | Ironton, OH | 9.6 TWh |
#15 | Warren County | Front Royal, VA | 9.2 TWh |
#16 | Nine Mile Point | Westwego, LA | 8.9 TWh |
#17 | Fort Myers | Ft. Myers, FL | 8.9 TWh |
#18 | Lawrenceburg Power, LLC | Lawrenceburg, IN | 8.9 TWh |
#19 | York Energy Center | Delta, PA | 8.8 TWh |
#20 | Sherwood H Smith Jr Energy Complex | Hamlet, NC | 8.8 TWh |
#21 | South Field Energy | Wellsville, OH | 8.5 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Midland Cogeneration Venture.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Beebe 1A | Ithaca, MI | 182.9 GWh | 26.6 mi |
Beebe 1B | Ithaca, MI | 119.0 GWh | 26.6 mi |
Central Michigan University | Mt. Pleasant, MI | 24.9 GWh | 27.8 mi |
Dan E Karn | Essexville, MI | 78.8 GWh | 19.6 mi |
Geddes 1 Solar, LLC | Saginaw, MI | 4.0 GWh | 11.8 mi |
Geddes 2 Solar, LLC | Saginaw, MI | 3.9 GWh | 12.1 mi |
Gratiot County Wind LLC | Breckenridge, MI | 228.1 GWh | 17.1 mi |
Gratiot Wind Park | Breckenridge, MI | 202.3 GWh | 17.3 mi |
Henry Station | Bay City, MI | 460.0 MWh | 16.2 mi |
Isabella Wind Park | Rosebush, MI | 848.4 GWh | 29 mi |
Meridian Wind Park | Merrill, MI | 456.9 GWh | 10.3 mi |
Peoples Generating Station | Ann Arbor, MI | 17.1 GWh | 27.8 mi |
Pinconning White Feather | Pinconning, MI | 16.8 GWh | 25.6 mi |
Pine River Wind Park | Shepherd, MI | 344.3 GWh | 24 mi |
Polaris Wind Park | North Star Township, MI | 419.4 GWh | 26.3 mi |
St Louis | St. Louis, MI | 175.0 MWh | 22.8 mi |
Stoneheart Solar, LLC | Saginaw, MI | 4.0 GWh | 12.6 mi |
Tuscola Bay Wind | Reese, MI | 337.8 GWh | 29.1 mi |
Water Street Station | Bay City, MI | 204.0 MWh | 16.4 mi |
Willford Solar, LLC | Gladwin, MI | 1.1 GWh | 31.5 mi |