Miami Fort
11021 Brower Rd., North Bend, OH 45052Plant Summary Information
Miami Fort is ranked #16 out of 129 coal plants nationwide in terms of total annual net electricity generation.
Miami Fort is comprised of 6 generators and generated 1.7 TWh during the 3-month period between May 2024 to August 2024.
Plant Name | Miami Fort |
---|---|
Utility Name | Luminant Miami Fort |
Location | Hamilton County, OH |
Initial Operation Date | November 1960 |
Last Update | Aug 2024 |
Annual Generation | 4.8 TWh |
Annual Consumption | 53.0 M MMBtu |
Ranked #224 out of 11,835 Power Plants Nationwide | |
Ranked #16 out of 129 Bituminous Coal Power Plants Nationwide | |
Ranked #13 out of 182 Ohio Power Plants | |
Ranked #3 out of 8 Ohio Bituminous Coal Power Plants | |
Fuel Types | Bituminous Coal : 99.6% |
Previous Operators |
Duke Energy Ohio Inc (2013 to 2014) Dynegy Miami Fort (2015 to 2017) Vistra Energy Miami Fort (2018 to 2020) Luminant Miami Fort (2021 to 2023) |
Map of Miami Fort
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Miami Fort.
Monthly Net Generation for Miami Fort
Miami Fort Details
Summary Information | |
---|---|
Plant Name | Miami Fort (2832) |
Plant Address | 11021 Brower Rd., North Bend, OH 45052 |
Utility | Luminant Miami Fort (59919) |
Latitude, Longitude | 39.1128, -84.8036 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | November 1960 |
Annual Generation | 4.8 TWh |
Fuel Types | Bituminous Coal : 99.6% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Ohio River |
Ash Impoundment | Yes Not Lined Operating |
Transmission / Distribution Owner | Duke Energy Ohio Inc (3542) OH |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator GT6 Details Operating October 1971
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 16.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 14 MW |
Winter Capacity | 20 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 1971 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GT3 Details Operating July 1971
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 16.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 14 MW |
Winter Capacity | 20 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1971 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GT4 Details Operating August 1971
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 16.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 14 MW |
Winter Capacity | 20 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1971 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GT5 Details Operating September 1971
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 16.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 14 MW |
Winter Capacity | 20 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1971 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 7 Details Operating May 1975
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 557.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 510 MW |
Winter Capacity | 510 MW |
Minimum Load | 200 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1975 |
Planned Retirement | December 2027 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
---|---|
Energy Source | Bituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 8 Details Operating February 1978
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 557.7 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 510 MW |
Winter Capacity | 510 MW |
Minimum Load | 200 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 1978 |
Planned Retirement | December 2027 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
---|---|
Energy Source | Bituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Miami Fort Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Duke Energy Ohio Inc | P O Box 960 139 East Fourth Street, Cincinnati, OH 45202 | Generator 6 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Bituminous Coal.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#6 | Gibson | Owensville, IN | 9.7 TWh |
#7 | Cumberland (TN) | Cumberland City, TN | 9.6 TWh |
#8 | John E Amos | St Albans, WV | 8.8 TWh |
#9 | Cross | Cross, SC | 8.6 TWh |
#10 | H L Spurlock | Maysville, KY | 8.0 TWh |
#11 | Four Corners | Fruitland, NM | 8.0 TWh |
#12 | Mill Creek (KY) | Louisville, KY | 7.3 TWh |
#13 | Trimble County | Bedford, KY | 9.0 TWh |
#14 | Mountaineer | New Haven, WV | 6.1 TWh |
#15 | Roxboro | Semora, NC | 6.1 TWh |
#17 | Clifty Creek | Madison, IN | 5.0 TWh |
#18 | Cayuga | Cayuga, IN | 4.5 TWh |
#19 | Kyger Creek | Cheshire, OH | 4.6 TWh |
#20 | Longview Power Plant | Maidsville, WV | 4.3 TWh |
#21 | FirstEnergy Fort Martin Power Station | Maidsville, WV | 4.3 TWh |
#22 | Crystal River | Crystal River, FL | 16.5 TWh |
#23 | James E. Rogers Energy Complex | Cliffside, NC | 6.4 TWh |
#24 | Marshall (NC) | Terrell, NC | 7.2 TWh |
#25 | Warrick | Newburgh, IN | 3.7 TWh |
#26 | Intermountain Power Project | Delta, UT | 4.1 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Miami Fort.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aero Solar Facility | Burlington, KY | 2.6 GWh | 9.6 mi |
Bavarian LFGTE | Walton, KY | 27.9 GWh | 19.1 mi |
Central Utility Plant Cincinnati | Cincinnati, OH | 241.0 GWh | 15.8 mi |
Crittenden Solar Facility | Dry Ridge, KY | 4.5 GWh | 27 mi |
East Bend | Union, KY | 2.5 TWh | 14.7 mi |
East Campus Utility Plant | Cincinnati, OH | 212.7 MWh | 16.1 mi |
Ghent | Ghent, KY | 9.8 TWh | 28 mi |
Hamilton (OH) | Hamilton, OH | 776.0 MWh | 24.5 mi |
Hamilton Hydro | HAMILTON, OH | 5.7 GWh | 24.6 mi |
Hamilton Peaking | Hamilton, OH | 1.5 GWh | 22.5 mi |
L'Oreal Solar - Florence | Florence, KY | 1.4 GWh | 13.6 mi |
Lawrenceburg Power, LLC | Lawrenceburg, IN | 8.9 TWh | 3.7 mi |
Madison | Trenton, OH | 928.1 GWh | 29.6 mi |
Markland | Florence, IN | 394.7 GWh | 24.6 mi |
Middletown Coke Company, LLC | Middletown, OH | 333.0 GWh | 32.9 mi |
Parking Lot Array | Cincinnati, OH | 1.4 GWh | 15.8 mi |
Procter & Gamble Cincinnati Plant | Cincinnati, OH | 9.4 GWh | 16.6 mi |
Walton 1 Solar Facility | Walton, KY | 2.9 GWh | 21.4 mi |
Walton 2 Solar Facility | Walton, KY | 3.1 GWh | 21.4 mi |
Woodsdale | Trenton, OH | 302.0 GWh | 29.6 mi |