Mesteno
200 FM 490, Rio Grande City, TX 78582Plant Summary Information
Mesteno is ranked #128 out of 218 wind farms in Texas in terms of total annual net electricity generation.
Mesteno generated 106.5 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Mesteno |
---|---|
Utility Name | Duke Energy Renewables Services |
Location | Starr County, TX |
Initial Operation Date | December 2019 |
Last Update | Sep 2024 |
Annual Generation | 411.4 GWh |
Annual Consumption | 1.5 M MMBtu |
Ranked #1,473 out of 11,852 Power Plants Nationwide | |
Ranked #422 out of 1,345 Wind Power Plants Nationwide | |
Ranked #275 out of 754 Texas Power Plants | |
Ranked #128 out of 218 Texas Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Mesteno Wind (2018 to 2021) Duke Energy Renewables Services (2022 to 2023) |
Map of Mesteno
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mesteno.
Monthly Net Generation for Mesteno
Mesteno Details
Summary Information | |
---|---|
Plant Name | Mesteno (62258) |
Plant Address | 200 FM 490, Rio Grande City, TX 78582 |
Utility | Duke Energy Renewables Services (65411) |
Latitude, Longitude | 26.52369, -98.74552 |
Generation Dates on File | Dec 2019 to Sep 2024 |
Initial Operation Date | December 2019 |
Annual Generation | 411.4 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Electric Transmission Texas LLC (50174) |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator MES Details Operating December 2019
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 201.6 MW |
Summer Capacity | 200 MW |
Winter Capacity | 200 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 56 |
Other Combustion Technology | No |
Turbine Details | |
Number Of Turbines | 56 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V136-3.45 |
Design Wind Speed | 15 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 367 |
Mesteno Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Mesteno Wind | 550 S. Caldwell Street, NAS09, Suite 925, Charlotte, NC 28202 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#412 | Post Oak Wind LLC | Abilene, TX | 420.7 GWh |
#413 | Minco Wind IV, LLC | Hinton, OK | 419.5 GWh |
#414 | Shiloh I Wind Project | Rio Vista, CA | 418.3 GWh |
#415 | Crossing Trails Wind Power Project LLC. | Seibert, CO | 416.3 GWh |
#416 | Briscoe Wind Farm | Silverton, TX | 414.6 GWh |
#417 | Polaris Wind Park | North Star Township, MI | 414.2 GWh |
#418 | Prairie Rose Wind Farm | Hardwick, MN | 413.4 GWh |
#419 | Chickasaw Wind Farm | New Hampton, IA | 412.9 GWh |
#420 | Cottonwood Wind Energy Center | Blue Hill, NE | 412.2 GWh |
#421 | Keechi Wind | Jacksboro, TX | 411.9 GWh |
#423 | Skookumchuck Wind Facility | Rainier, WA | 410.3 GWh |
#424 | Buffalo Gap 2 Wind Farm | Merkel, TX | 410.0 GWh |
#425 | Pioneer Hutt Wind Energy | Midland, TX | 409.1 GWh |
#426 | Osceola Windpower LLC | Harris, IA | 405.8 GWh |
#427 | Midway Wind, LLC | Taft, TX | 404.7 GWh |
#428 | Vienna Wind Farm | Marshalltown, IA | 403.3 GWh |
#429 | Fowler Ridge IV Wind Farm LLC | Fowler, IN | 402.8 GWh |
#430 | Mesquite Wind Power LLC | Abilene, TX | 401.3 GWh |
#431 | Ranchland Wind Project I | Cisco, TX | 400.8 GWh |
#432 | Lost Creek Wind Energy Facility | King City, MO | 400.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mesteno.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alexis Solar, LLC | Encino, TX | 17.4 GWh | 40.5 mi |
Citrus City | Mission, TX | 645.0 MWh | 28.1 mi |
Falcon Dam & Power | Falcon Heights, TX | 30.6 GWh | 26 mi |
Frontera Energy Center | Mission, TX | 2.0 TWh | 30.6 mi |
HEB00038 | San Juan, TX | 241.0 MWh | 42.3 mi |
Hidalgo Energy Center | Edinburg, TX | 2.0 TWh | 37.4 mi |
Hidalgo Wind Farm II | Edinburg, TX | 132.9 GWh | 18.5 mi |
Hidalgo Wind Farm LLC | McCook, TX | 687.8 GWh | 21.1 mi |
Las Lomas Wind Project | Falcon, TX | 516.0 GWh | 22.7 mi |
Los Vientos V Wind Power | Rio Grande City, TX | 334.6 GWh | 13.3 mi |
Los Vientos Windpower III | Rio Grande City, TX | 451.3 GWh | 10.1 mi |
Los Vientos Windpower IV | Rio Grande City, TX | 475.5 GWh | 10.9 mi |
Magic Valley Generating Station | Edinburg, TX | 2.5 TWh | 36.6 mi |
Red Gate Power Plant | Edinburg, TX | 247.7 GWh | 35.5 mi |
Rio Bravo Windpower, LLC | Roma, TX | 305.4 GWh | 20.1 mi |
Sendero | Hebbronville, TX | 272.5 GWh | 46.6 mi |
WAL3320 | Palmhurst, TX | 368.0 MWh | 32.2 mi |
WAL3886 | Edinburg, TX | 372.0 MWh | 37.9 mi |
WAL452 | Mcallen, TX | 368.0 MWh | 36.5 mi |
WAL5165 | Alamo, TX | 391.0 MWh | 44.6 mi |