Mesquite Star
1125 F M 608, Roscoe, TX 79545Plant Summary Information
Mesquite Star is ranked #32 out of 1,343 wind farms nationwide in terms of total annual net electricity generation.
Mesquite Star generated 263.4 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Mesquite Star |
---|---|
Utility Name | Mesquite Star LLC |
Location | Nolan County, TX |
Initial Operation Date | March 2020 |
Last Update | Aug 2024 |
Annual Generation | 1.2 TWh |
Annual Consumption | 4.2 M MMBtu |
Ranked #658 out of 11,835 Power Plants Nationwide | |
Ranked #32 out of 1,343 Wind Power Plants Nationwide | |
Ranked #102 out of 749 Texas Power Plants | |
Ranked #14 out of 218 Texas Wind Power Plants | |
Fuel Types | Wind |
Map of Mesquite Star
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mesquite Star.
Monthly Net Generation for Mesquite Star
Mesquite Star Details
Summary Information | |
---|---|
Plant Name | Mesquite Star (62587) |
Plant Address | 1125 F M 608, Roscoe, TX 79545 |
Utility | Mesquite Star LLC (62085) |
Latitude, Longitude | 32.25598, -100.32031 |
Generation Dates on File | Mar 2020 to Aug 2024 |
Initial Operation Date | March 2020 |
Annual Generation | 1.2 TWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Big Country Electric Coop, Inc (1591) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator MESQ Details Operating March 2020
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 418.9 MW |
Summer Capacity | 418.9 MW |
Winter Capacity | 418.9 MW |
Minimum Load | 23 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 120 |
Turbine Details | |
Number Of Turbines | 120 |
---|---|
Predominant Turbine Manufacturer | Siemens Gamesa |
Predominant Turbine Model Number | G132-3.465 |
Design Wind Speed | 16.2 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 101 |
Mesquite Star Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#22 | Clearwater Wind I | Miles City, MT | 1.3 TWh |
#23 | Lacy Creek Wind Energy Center | Sterling City, TX | 1.3 TWh |
#24 | High Lonesome Wind Power, LLC Hybrid | Rankin, TX | 1.3 TWh |
#25 | Inertia Wind Project | Haskell, TX | 1.2 TWh |
#26 | Neosho Ridge Wind Energy Center | Galesburg, KS | 1.2 TWh |
#27 | Santa Rita Wind Energy | Big Lake, TX | 1.2 TWh |
#28 | Jordan Creek Wind Farm, LLC | Judyville, IN | 1.2 TWh |
#29 | Iron Star Wind Project | Dodge City, KS | 1.2 TWh |
#30 | Foard City Wind | Crowell, TX | 1.2 TWh |
#31 | Red Cloud Wind LLC | Corona, NM | 1.2 TWh |
#33 | Ranchero Wind Farm LLC | Iraan, TX | 1.2 TWh |
#34 | Thunderhead Wind Energy LLC | Boone, NE | 1.2 TWh |
#35 | Azure Sky Wind Project, LLC Hybrid | Throckmorton, TX | 1.2 TWh |
#36 | Santa Rita East | Barnhart, TX | 1.1 TWh |
#37 | Flat Ridge 2 Wind Energy LLC | Zenda, KS | 1.1 TWh |
#38 | Western Plains Wind Farm | Spearville, KS | 1.1 TWh |
#39 | 25 Mile Creek | Gage, OK | 1.1 TWh |
#40 | Soldier Creek Wind | Corning, KS | 1.1 TWh |
#41 | Sage Draw Wind | Wilson, TX | 1.1 TWh |
#42 | Stephens Ranch Wind Energy LLC | O'Donnell, TX | 1.1 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mesquite Star.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Buffalo Gap 2 Wind Farm | Merkel, TX | 427.9 GWh | 9.4 mi |
Buffalo Gap 3 Wind Farm | Nolan, TX | 292.1 GWh | 13.1 mi |
Buffalo Gap Wind Farm | Merkel, TX | 198.5 GWh | 15.6 mi |
Callahan Divide Wind Energy Center | Tusocola, TX | 394.7 GWh | 17.8 mi |
Champion Wind Farm LLC | Roscoe, TX | 306.8 GWh | 21.5 mi |
Holstein 1 Solar Farm | Wingate, TX | 389.6 GWh | 14 mi |
Horse Hollow Wind Energy Center | Wingate, TX | 2.5 TWh | 15.7 mi |
Inadale Wind Farm LLC Hybrid | Roscoe, TX | 427.2 GWh | 22.5 mi |
Jameson Gas Processing Plant | Silver, TX | 12.9 GWh | 26 mi |
Loraine Windpark Project LLC | Loraine, TX | 329.5 GWh | 27.8 mi |
Maryneal Windpower | Maryneal, TX | 556.5 GWh | 10.8 mi |
Roscoe Wind Farm LLC | Roscoe, TX | 404.7 GWh | 25 mi |
South Trent Wind Farm | Sweetwater, TX | 264.8 GWh | 15.4 mi |
Sweetwater Wind 1 LLC | Sweetwater, TX | 137.6 GWh | 7.3 mi |
Sweetwater Wind 2 LLC | Sweetwater, TX | 429.5 GWh | 6.9 mi |
Sweetwater Wind 3 LLC | Sweetwater, TX | 425.5 GWh | 6.4 mi |
Sweetwater Wind 4 LLC | Roscoe, TX | 609.9 GWh | 12.9 mi |
Sweetwater Wind 5 | Roscoe, TX | 165.2 GWh | 9.6 mi |
Trent Wind Farm | Trent, TX | 535.5 GWh | 13 mi |
Turkey Track Wind Energy LLC | Blackwell, TX | 345.7 GWh | 5 mi |