Mesquite Solar 1
39903 W. Elliot Road, Tonopah, AZ 85354Plant Summary Information
Mesquite Solar 1 is ranked #34 out of 155 power plants in Arizona in terms of total annual net electricity generation.
Mesquite Solar 1 generated 86.6 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Mesquite Solar 1 |
---|---|
Utility Name | Consolidated Edison Development Inc. |
Location | Maricopa County, AZ |
Initial Operation Date | November 2011 |
Last Update | Dec 2023 |
Annual Generation | 403.9 GWh |
Annual Consumption | 1.4 M MMBtu |
Ranked #1,497 out of 11,835 Power Plants Nationwide | |
Ranked #91 out of 5,643 Solar Power Plants Nationwide | |
Ranked #34 out of 155 Arizona Power Plants | |
Ranked #6 out of 102 Arizona Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Mesquite Solar 1, LLC (2013 to 2017) Consolidated Edison Development Inc. (2018 to 2023) |
Map of Mesquite Solar 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mesquite Solar 1.
Monthly Net Generation for Mesquite Solar 1
Mesquite Solar 1 Details
Summary Information | |
---|---|
Plant Name | Mesquite Solar 1 (57707) |
Plant Address | 39903 W. Elliot Road, Tonopah, AZ 85354 |
Utility | Consolidated Edison Development Inc. (56769) |
Latitude, Longitude | 33.34183, -112.90403 |
Generation Dates on File | Nov 2011 to Dec 2023 |
Initial Operation Date | November 2011 |
Annual Generation | 403.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 11-116 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Salt River Project (16572) AZ |
Grid Voltage | 500.00 kV |
Energy Storage | No |
Generator 1 Details Operating November 2011
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 16 MW |
Summer Capacity | 16 MW |
Winter Capacity | 16 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2011 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 22.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator 3 Details Operating December 2011
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 10 MW |
Summer Capacity | 10 MW |
Winter Capacity | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2011 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 14.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator 2 Details Operating January 2012
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 16 MW |
Summer Capacity | 16 MW |
Winter Capacity | 16 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2012 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 22.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator 10 Details Operating October 2012
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 12 MW |
Summer Capacity | 12 MW |
Winter Capacity | 12 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 2012 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 15.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator 11 Details Operating October 2012
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 16 MW |
Summer Capacity | 16 MW |
Winter Capacity | 16 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 2012 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 22.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator 8 Details Operating October 2012
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 12 MW |
Summer Capacity | 12 MW |
Winter Capacity | 12 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 2012 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 15.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator 9 Details Operating October 2012
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 16 MW |
Summer Capacity | 16 MW |
Winter Capacity | 16 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 2012 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 22 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator 12 Details Operating December 2012
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 16 MW |
Summer Capacity | 16 MW |
Winter Capacity | 16 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2012 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 22.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator 4 Details Operating May 2012
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 16 MW |
Summer Capacity | 16 MW |
Winter Capacity | 16 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2012 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 22.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator 5 Details Operating June 2012
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 16 MW |
Summer Capacity | 16 MW |
Winter Capacity | 16 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2012 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 22.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator 6 Details Operating August 2012
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 8 MW |
Summer Capacity | 8 MW |
Winter Capacity | 8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2012 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 11.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator 7 Details Operating September 2012
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 16 MW |
Summer Capacity | 16 MW |
Winter Capacity | 16 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2012 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 21.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Mesquite Solar 1 Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#81 | Hecate Energy Frye Solar LLC | Kress, TX | 426.9 GWh |
#82 | Twiggs Solar | Dry Branch, GA | 424.8 GWh |
#83 | Sun Streams, LLC | Arlington, AZ | 413.4 GWh |
#84 | Shakes Solar | Carrizo Springs, TX | 411.5 GWh |
#85 | Fort Bend Solar LLC | East Bernard, TX | 410.5 GWh |
#86 | Brazoria West | Damon, TX | 408.5 GWh |
#87 | Aquamarine | Lemoore, CA | 406.2 GWh |
#88 | Mount Signal Solar Farm II | Calexico, CA | 405.6 GWh |
#89 | CED Crane Solar | Crane, TX | 405.5 GWh |
#90 | Springbok Solar Farm 2 | Cantil, CA | 404.2 GWh |
#92 | Daggett 2 | Daggett, CA | 397.4 GWh |
#93 | Big Plain Solar, LLC | London, OH | 403.0 GWh |
#94 | RE Garland | Rosamond, CA | 383.7 GWh |
#95 | Yellow Pine Solar | Enterprise, NV | 377.8 GWh |
#96 | Buena Vista Energy Center | Chaparral, NM | 386.6 GWh |
#97 | Holstein 1 Solar Farm | Wingate, TX | 389.6 GWh |
#98 | Arica Solar | Desert Center, CA | 387.7 GWh |
#99 | Imperial Solar Energy Center West | Seeley, CA | 388.3 GWh |
#100 | Samson Solar Energy | Cunningham, TX | 388.3 GWh |
#101 | North Rosamond Solar LLC | Rosamond, CA | 387.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mesquite Solar 1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arlington Valley Energy Facility | Arlington, AZ | 3.6 TWh | 0.8 mi |
Arlington Valley Solar Energy II | Arlington, AZ | 348.5 GWh | 4.8 mi |
Badger 1 | Tonopah, AZ | 33.2 GWh | 12 mi |
Buckeye Union HS District 201 | Buckeye, AZ | 6.3 GWh | 19.7 mi |
Cotton Center Solar Hybrid | Gila Bend, AZ | 41.2 GWh | 25.4 mi |
Desert Star Hybrid | Buckeye, AZ | 30.0 GWh | 19.6 mi |
Harquahala Generating Project | Tonopah, AZ | 2.7 TWh | 15.2 mi |
Mesquite Generating Station Block 1 | Arlington, AZ | 3.6 TWh | 2.3 mi |
Mesquite Generating Station Block 2 | Arlington, AZ | 3.5 TWh | 2.3 mi |
Mesquite Solar 2, LLC | Tonopah, AZ | 281.1 GWh | 0.8 mi |
Mesquite Solar 3, LLC | Tonopah, AZ | 462.5 GWh | 1.9 mi |
Mesquite Solar 4, LLC | Tonopah, AZ | 103.6 GWh | 1.4 mi |
Mesquite Solar 5, LLC | Tonopah, AZ | 110.1 GWh | 1.4 mi |
Palo Verde | Wintersburg, AZ | 32.4 TWh | 4 mi |
Red Hawk | Arlington, AZ | 3.8 TWh | 3.7 mi |
Saddle Mountain Solar I | Tonopah, AZ | 30.9 GWh | 16.2 mi |
Sonoran Solar Energy | Buckeye, AZ | 881.3 GWh | 21.9 mi |
Sun Streams 2 | Hassayampa, AZ | 309.0 GWh | 5.3 mi |
Sun Streams 3 | Arlington, AZ | 251.1 GWh | 5.4 mi |
Sun Streams, LLC | Arlington, AZ | 413.4 GWh | 4 mi |