Mesquite Generating Station Block 2
37625 W. Elliot Rd, Arlington, AZ 85322Plant Summary Information
Mesquite Generating Station Block 2 is ranked #8 out of 155 power plants in Arizona in terms of total annual net electricity generation.
Mesquite Generating Station Block 2 is comprised of 3 generators and generated 1.2 TWh during the 3-month period between May 2024 to August 2024.
Plant Name | Mesquite Generating Station Block 2 |
---|---|
Utility Name | Mesquite Power LLC |
Location | Maricopa County, AZ |
Initial Operation Date | December 2003 |
Last Update | Aug 2024 |
Annual Generation | 3.5 TWh |
Annual Consumption | 28.7 M MMBtu |
Ranked #329 out of 11,835 Power Plants Nationwide | |
Ranked #192 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #8 out of 155 Arizona Power Plants | |
Ranked #6 out of 34 Arizona Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Previous Operator |
Mesquite Power LLC (2013 to 2023) CAMS (2014 to 2017) |
Map of Mesquite Generating Station Block 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mesquite Generating Station Block 2.
Monthly Net Generation for Mesquite Generating Station Block 2
Mesquite Generating Station Block 2 Details
Summary Information | |
---|---|
Plant Name | Mesquite Generating Station Block 2 (55481) |
Plant Address | 37625 W. Elliot Rd, Arlington, AZ 85322 |
Utility | Mesquite Power LLC (12363) |
Latitude, Longitude | 33.34505, -112.86423 |
Generation Dates on File | Jan 2003 to Aug 2024 |
Initial Operation Date | December 2003 |
Annual Generation | 3.5 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 03-105 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Salt River Project (SRP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Wells |
Ash Impoundment | No |
Transmission / Distribution Owner | Salt River Project (16572) AZ |
Grid Voltage | 500.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name |
KINDER MORGAN BORDER PIPELINE LLC TRANSWESTERN PIPELINE COMPANY |
Natural Gas Storage | No |
Generator GT3 Details Operating December 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | BLK2 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 185.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 162 MW |
Winter Capacity | 162 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2003 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GT4 Details Operating December 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | BLK2 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 185.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 162 MW |
Winter Capacity | 162 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2003 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ST2 Details Operating December 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | BLK2 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 321 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 300 MW |
Winter Capacity | 300 MW |
Minimum Load | 110 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2003 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
---|---|
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Fluidized Bed Technology | No |
Pulverized Coal Technology | No |
Subcritical Technology | No |
Supercritical Technology | No |
Ultrasupercritical Technology | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Mesquite Generating Station Block 2 Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#182 | Milford Power Project | Milford, CT | 3.6 TWh |
#183 | Odyssey Energy Altura Cogen, LLC | Channelview, TX | 3.5 TWh |
#184 | Newark Energy Center | Newark, NJ | 3.5 TWh |
#185 | Ironwood LLC | Lebanon, PA | 3.5 TWh |
#186 | Luna Energy Facility | Deming, NM | 3.5 TWh |
#187 | Riverside Energy Center | Beloit, WI | 3.5 TWh |
#188 | Harding Street | Indianapolis, IN | 3.5 TWh |
#189 | Marshall (NC) | Terrell, NC | 7.2 TWh |
#190 | Hobbs Generating Station | Hobbs, NM | 3.5 TWh |
#191 | Middletown Energy Center | Middletown, OH | 3.5 TWh |
#193 | Bear Garden | New Canton, VA | 3.4 TWh |
#194 | Gila River Power Block 2 | Gila Bend, AZ | 3.4 TWh |
#195 | J Lamar Stall Unit | Shreveport, LA | 3.4 TWh |
#196 | Northport | Northport, NY | 3.4 TWh |
#197 | Lagoon Creek | Brownsville, TN | 3.4 TWh |
#198 | Brunner Island | York Haven, PA | 3.6 TWh |
#199 | Sabine | Orange, TX | 3.4 TWh |
#200 | Cherokee | Denver, CO | 3.4 TWh |
#201 | West Phoenix | Phoenix, AZ | 3.4 TWh |
#202 | Kings Mountain Energy Center | Kings Mountain, NC | 3.3 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mesquite Generating Station Block 2.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arlington Valley Energy Facility | Arlington, AZ | 3.6 TWh | 1.5 mi |
Arlington Valley Solar Energy II | Arlington, AZ | 348.5 GWh | 3.3 mi |
Badger 1 | Tonopah, AZ | 33.2 GWh | 11 mi |
Buckeye Union HS District 201 | Buckeye, AZ | 6.3 GWh | 17.4 mi |
Cotton Center Solar Hybrid | Gila Bend, AZ | 41.2 GWh | 24.4 mi |
Desert Star Hybrid | Buckeye, AZ | 30.0 GWh | 18.2 mi |
Harquahala Generating Project | Tonopah, AZ | 2.7 TWh | 17 mi |
Mesquite Generating Station Block 1 | Arlington, AZ | 3.6 TWh | 0 mi |
Mesquite Solar 1 | Tonopah, AZ | 403.9 GWh | 2.3 mi |
Mesquite Solar 2, LLC | Tonopah, AZ | 281.1 GWh | 2.9 mi |
Mesquite Solar 3, LLC | Tonopah, AZ | 462.5 GWh | 4.2 mi |
Mesquite Solar 4, LLC | Tonopah, AZ | 103.6 GWh | 3.4 mi |
Mesquite Solar 5, LLC | Tonopah, AZ | 110.1 GWh | 3.4 mi |
Palo Verde | Wintersburg, AZ | 32.4 TWh | 3 mi |
Red Hawk | Arlington, AZ | 3.8 TWh | 1.5 mi |
Saddle Mountain Solar I | Tonopah, AZ | 30.9 GWh | 18.4 mi |
Sonoran Solar Energy | Buckeye, AZ | 881.3 GWh | 19.7 mi |
Sun Streams 2 | Hassayampa, AZ | 309.0 GWh | 3.2 mi |
Sun Streams 3 | Arlington, AZ | 251.1 GWh | 3.2 mi |
Sun Streams, LLC | Arlington, AZ | 413.4 GWh | 1.7 mi |