Meridian Vineyards is ranked #717 out of 799 solar farms in California in terms of total annual net electricity generation.
Meridian Vineyards generated 204.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Meridian Vineyards |
---|---|
Utility Name | CVI CleanCapital Solar 1 LLC |
Location | San Luis Obispo County, CA |
Initial Operation Date | December 2010 |
Last Update | Dec 2023 |
Annual Generation | 1.4 GWh |
Annual Consumption | 5.1 k MMBtu |
Ranked #10,553 out of 11,835 Power Plants Nationwide | |
Ranked #5,203 out of 5,643 Solar Power Plants Nationwide | |
Ranked #1,458 out of 1,569 California Power Plants | |
Ranked #717 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Gestamp Asetym Solar North America (2013 to 2014) X-Elio North America Inc (2015 to 2017) CleanCapital (2018 to 2021) CVI CleanCapital Solar 1 LLC (2022 to 2023) |
Map of Meridian Vineyards
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Meridian Vineyards.
Monthly Net Generation for Meridian Vineyards
Meridian Vineyards Details
Summary Information | |
---|---|
Plant Name | Meridian Vineyards (57982) |
Plant Address | 7000 E Highway 46, Paso Robles, CA 93446 |
Utility | CVI CleanCapital Solar 1 LLC (65432) |
Latitude, Longitude | 35.67028, -120.56694 |
Generation Dates on File | Jan 2011 to Dec 2023 |
Initial Operation Date | December 2010 |
Annual Generation | 1.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 11-45-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Generator PV-1 Details Operating December 2010
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 0.5 MW |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2010 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 30 |
DC Net Capacity | 0.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 0.6 MW |
Virtual Net Metering Agreement | No |
Generator PV-2 Details Operating December 2010
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 0.6 MW |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2010 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 30 |
DC Net Capacity | 0.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 0.7 MW |
Virtual Net Metering Agreement | No |
Meridian Vineyards Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Bank of America Leasing & Capital LLC | 555 California Street, San Francisco, CA 94104 | Generator PV-1 | 100.00% |
Bank of America Leasing & Capital LLC | 555 California Street, San Francisco, CA 94104 | Generator PV-2 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5193 | Solar Photovoltaic Project #05 | Redlands, CA | 1.4 GWh |
#5194 | Clovis North High School | Fresno, CA | 1.4 GWh |
#5195 | Colon PV | Wilmington, CA | 1.4 GWh |
#5196 | ME Novel Lighthouse - Front St. Solar CSG | Skowhegan, ME | 1.4 GWh |
#5197 | Erving CSG | Erving, MA | 1.4 GWh |
#5198 | Seminole | Donalsonville, GA | 1.4 GWh |
#5199 | Solar Photovoltaic Project #32 | Ontario, CA | 1.4 GWh |
#5200 | Clovis East High School | Clovis, CA | 1.4 GWh |
#5201 | Plainfield Solar 1 | Plainfield, CT | 1.4 GWh |
#5202 | Owens Corning Headquarters | Toledo, OH | 1.4 GWh |
#5204 | Intel Folsom | Folsom, CA | 1.4 GWh |
#5205 | Tompkins Cortland Community College | Dryden, NY | 1.4 GWh |
#5206 | IKEA Oak Creek Rooftop PV System | Oak Creek, WI | 1.4 GWh |
#5207 | Solar Photovoltaic Project #15 | Fontana, CA | 1.4 GWh |
#5208 | Shirley Landfill | Shirley, MA | 1.4 GWh |
#5209 | Toms River CSG | Toms River, NJ | 1.4 GWh |
#5210 | Parking Lot Array | Cincinnati, OH | 1.4 GWh |
#5211 | Tioga Solar Morris County 1 LLC | Morristown, NJ | 1.4 GWh |
#5212 | Malone Solar Site | Malone, NY | 1.4 GWh |
#5213 | IKEA Las Vegas 462 | Las Vegas, NV | 1.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Meridian Vineyards.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aera San Ardo Cogen Facility | San Ardo, CA | 23.6 GWh | 25.5 mi |
Atascadero State Hospital | Atascadero, CA | 2.8 GWh | 14.8 mi |
Avenal Park | Avenal, CA | 10.6 GWh | 33.8 mi |
CA Flats Solar 130, LLC | Shandon, CA | 230.4 GWh | 9.9 mi |
CA Flats Solar 150, LLC | Shandon, CA | 327.9 GWh | 9.9 mi |
CA-DGS-California Men's Colony | San Luis Obispo, CA | 3.7 GWh | 24.9 mi |
CED Avenal | Avenal, CA | 8.6 GWh | 32.4 mi |
Coalinga 25D Cogen | Coalinga, CA | 67.0 GWh | 34.9 mi |
Coalinga Cogeneration Facility | Coalinga, CA | 44.4 GWh | 36.4 mi |
Cold Canyon 1 | San Luis Obispo, CA | 10.0 GWh | 33.5 mi |
Coronal Lost Hills | Lost Hills, CA | 28.6 GWh | 37.3 mi |
Diablo Canyon | Avila Beach, CA | 16.7 TWh | 35.6 mi |
Firestone Walker Brewery - Phase 1 | Paso Robles, CA | 3.9 GWh | 8.8 mi |
Nacimiento Hydro Project | Bradley, CA | 18.6 GWh | 19.8 mi |
Salinas River Cogeneration | San Ardo, CA | 226.0 GWh | 25.7 mi |
Sand Drag LLC | Avenal, CA | 33.4 GWh | 33.5 mi |
Stenner Creek Solar | San Luis Obispo, CA | 700.0 MWh | 25.2 mi |
Sun City Project LLC | Avenal, CA | 34.3 GWh | 33.5 mi |
Topaz Solar Farm | Santa Margarita, CA | 1.1 TWh | 33.5 mi |
Vintner Solar | Templeton, CA | 3.9 GWh | 10.1 mi |