Route 116, Medway, ME 4460Plant Summary Information
Medway Hydro is ranked #24 out of 49 hydroelectric power plants in Maine in terms of total annual net electricity generation.
Medway Hydro is comprised of 5 generators and generated 8.5 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Medway Hydro |
---|---|
Utility Name | Brookfield Black Bear Hydro, LLC |
Location | Penobscot County, ME |
Initial Operation Date | January 1923 |
Last Update | Dec 2022 |
Annual Generation | 30.9 GWh |
Annual Consumption | 118.8 k MMBtu |
Ranked #4,410 out of 11,249 Power Plants Nationwide | |
Ranked #625 out of 1,354 Water Power Plants Nationwide | |
Ranked #58 out of 123 Maine Power Plants | |
Ranked #24 out of 49 Maine Water Power Plants | |
Fuel Types | Water |
Map of Medway Hydro
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Medway Hydro.
Monthly Net Generation for Medway Hydro
Medway Hydro Details
Summary Information | |
---|---|
Plant Name | Medway Hydro (55288) |
Plant Address | Route 116 Medway, ME 4460 |
Utility | Brookfield Black Bear Hydro, LLC (59178) |
Latitude, Longitude | 45.6072, -68.5453 |
Generation Dates on File | Jan 2001 to Dec 2022 |
Initial Operation Date | January 1923 |
Annual Generation | 30.9 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 99-776-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | W Branch Penobscot River |
Ash Impoundment | No |
Transmission / Distribution Owner | Versant Power (1179) ME |
Grid Voltage | 46.00 kV |
Energy Storage | No |
Generator MW01 Details Operating January 1923
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 0.7 MW |
Winter Capacity | 0.7 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1923 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Generator MW02 Details Operating January 1923
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 0.7 MW |
Winter Capacity | 0.7 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1923 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Generator MW03 Details Operating January 1923
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 0.7 MW |
Winter Capacity | 0.7 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1923 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Generator MW04 Details Operating January 1925
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 0.9 MW |
Winter Capacity | 0.9 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1925 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Generator MW05 Details Operating January 1925
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 0.9 MW |
Winter Capacity | 0.9 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1925 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Medway Hydro Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#615 | Sugar Island | Potsdam, NY | 31.7 GWh |
#616 | Wausau | Wausau, WI | 31.7 GWh |
#617 | Deerfield 2 | Conway, MA | 31.6 GWh |
#618 | Dutch Flat 2 | Dutch Flat, CA | 31.6 GWh |
#619 | White River Lock and Dam 3 | Marcella, AR | 31.5 GWh |
#620 | Croton | Newaygo, MI | 31.3 GWh |
#621 | Chatuge | Hayesville, NC | 31.3 GWh |
#622 | Turnbull Hydro | Fairfield, MT | 31.2 GWh |
#623 | Peru (IL) | City of Peru, IL | 31.2 GWh |
#624 | Ellsworth Hydro Station | Ellsworth, ME | 30.9 GWh |
#626 | Pyrites Plant | Pyrites, NY | 30.7 GWh |
#627 | Foote | Oscoda, MI | 30.2 GWh |
#628 | Proctor | Proctor, VT | 30.0 GWh |
#629 | Ashton | Ashton, ID | 29.8 GWh |
#630 | Pilot Knob | Winterhaven, CA | 29.5 GWh |
#631 | Kamargo | Black River, NY | 28.7 GWh |
#632 | Upper Gorge | Bishop, CA | 28.7 GWh |
#633 | Aziscohos Hydroelectric Project | Wilson Mills, ME | 28.5 GWh |
#634 | Alcona | Glennie, MI | 28.5 GWh |
#635 | Cooke | Oscoda, MI | 28.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Medway Hydro.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Dynamic Corinth (CSG) | Corinth, ME | 932.0 MWh | 47.3 mi |
Eastern Maine Medical Center | Bangor, ME | 33.6 GWh | 56.1 mi |
Great Lakes Hydro America - ME | Millinocket, ME | 594.2 GWh | 8.2 mi |
Indeck West Enfield Energy Center | West Enfield, ME | 28.1 GWh | 24.8 mi |
Maine Independence Station | Veazie, ME | 683.4 GWh | 54.7 mi |
Milford Hydro Station | Milford, ME | 46.4 GWh | 46.2 mi |
Milo CSG | Milo, ME | 6.6 GWh | 33.9 mi |
Milo PV - BD Solar 1 LLC | Milo, ME | 29.3 GWh | 31.9 mi |
Oakfield Wind Project | City of Oakfield, ME | 360.3 GWh | 36.6 mi |
Orono B | Orono, ME | 27.6 GWh | 50.3 mi |
Orono Hydro Station | Orono, ME | 11.2 GWh | 50.6 mi |
Passadumkeag Windpark LLC | Greenbush, ME | 145.7 GWh | 40.5 mi |
Pumpkin Hill | Lowell, ME | 4.8 GWh | 29.3 mi |
Red Shield Envir Old Town Facility | Old Town, ME | 75.8 GWh | 47.8 mi |
Rollins Wind Project | Winn Village, ME | 170.4 GWh | 19.7 mi |
Stetson Wind I | Danforth, ME | 153.8 GWh | 28 mi |
Stetson Wind II | Danforth, ME | 65.0 GWh | 27.8 mi |
Stillwater B | Old Town, ME | 15.4 GWh | 48.5 mi |
Stillwater Hydro Station | Stillwater, ME | 10.5 GWh | 48.7 mi |
West Enfield Hydro | West Enfield, ME | 95.3 GWh | 25.2 mi |