Mechanicsville Solar
3259 Mechancsville Turnpike, Mechanicsville, VA 23111Plant Summary Information
Mechanicsville Solar is ranked #33 out of 100 solar farms in Virginia in terms of total annual net electricity generation.
Mechanicsville Solar generated 10.5 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Mechanicsville Solar |
---|---|
Utility Name | Mechanicsville Solar, LLC |
Location | Hanover County, VA |
Initial Operation Date | September 2020 |
Last Update | Dec 2024 |
Annual Generation | 52.3 GWh |
Annual Consumption | 187.4 k MMBtu |
Ranked #3,854 out of 11,949 Power Plants Nationwide | |
Ranked #796 out of 5,739 Solar Power Plants Nationwide | |
Ranked #77 out of 216 Virginia Power Plants | |
Ranked #33 out of 100 Virginia Solar Power Plants | |
Fuel Types | Solar |
Map of Mechanicsville Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mechanicsville Solar.
Monthly Net Generation for Mechanicsville Solar
Mechanicsville Solar Details
Summary Information | |
---|---|
Plant Name | Mechanicsville Solar (64158) |
Plant Address | 3259 Mechancsville Turnpike, Mechanicsville, VA 23111 |
Utility | Mechanicsville Solar, LLC (63777) |
Latitude, Longitude | 37.66598, -77.20773 |
Generation Dates on File | Sep 2020 to Dec 2024 |
Initial Operation Date | September 2020 |
Annual Generation | 52.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 15-934-004 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator MECH Details Operating September 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
RTO ISO LMP Node Designation | OLDCHRCH 20 KV MECHVLSP |
RTO ISO Location Designation For Reporting Wholesale Sales Data | OLDCHRCH 20 KV MECHVLSP |
Nameplate Capacity | 25 MW |
Summer Capacity | 25 MW |
Winter Capacity | 25 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 35 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Mechanicsville Solar Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#786 | Vikings Energy Farm | Holtville, CA | 49.4 GWh |
#787 | Oberon IB | Odessa, TX | 54.0 GWh |
#788 | Mountain View Solar | North Las Vegas, NV | 53.8 GWh |
#789 | Axium Modesto Solar | Modesto, CA | 53.7 GWh |
#790 | Marine Corps Logistics Base Solar | Albany, GA | 53.7 GWh |
#791 | DWW Solar ll | Simsbury, CT | 53.6 GWh |
#792 | Pinal Central Energy Center Hybrid | Casa Grande, AZ | 51.2 GWh |
#793 | TA-Acacia, LLC | Lancaster, CA | 53.4 GWh |
#794 | Sulphur Springs | Cochise, AZ | 53.3 GWh |
#795 | Cascade Solar | Joshua Tree, CA | 53.0 GWh |
#797 | Edwards Sanborn E3 | Mojave, CA | 50.4 GWh |
#798 | Ripley | La Plata, MD | 51.9 GWh |
#799 | Fort Benning Solar Facility | Fort Benning, GA | 51.5 GWh |
#800 | Poseidon Solar, LLC | Globe, AZ | 51.4 GWh |
#801 | Solar Oasis LLC | Palmdale, CA | 51.3 GWh |
#802 | Fort Stewart Solar Facility | Fort Stewart, GA | 51.1 GWh |
#803 | SEPV Mojave West | Mojave, CA | 51.1 GWh |
#804 | RE Kansas South LLC | Lemoore, CA | 51.1 GWh |
#805 | Citizens Imperial Solar | Calipatria, CA | 50.3 GWh |
#806 | Seville 1 | Ocotillo Wells, CA | 50.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mechanicsville Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Briel Solar Farm | Standston, VA | 41.8 GWh | 10.3 mi |
Charles City | Providence Forge, VA | 54.0 GWh | 16.3 mi |
Chesterfield | Chester, VA | 2.0 TWh | 21.8 mi |
Correctional Solar LLC | Barhamsville, VA | 30.1 GWh | 24 mi |
Darbytown | Richmond, VA | 143.5 GWh | 14.6 mi |
Doswell Energy Center | Ashland, VA | 5.7 TWh | 16.9 mi |
Energix Hollyfield, LLC | Manquin, VA | 25.5 GWh | 2.1 mi |
Essex Solar Center | Dunnsville, VA | 35.6 GWh | 25.1 mi |
Henrico | Glen Allen, VA | 7.3 GWh | 19.7 mi |
Hollyfield | Manquin, VA | 29.8 GWh | 2.1 mi |
Hopewell Cogeneration | Hopewell, VA | 2.0 TWh | 26.2 mi |
Hopewell Power Station | Hopewell, VA | 345.0 GWh | 25.8 mi |
King & Queen | Little Plymouth, VA | 53.8 GWh | 24.5 mi |
Park 500 Philip Morris USA | Chester, VA | 13.8 GWh | 22.9 mi |
Philip Morris | Chester, VA | 2.2 GWh | 22.8 mi |
Richmond Energy | Henrico, VA | 27.3 GWh | 14.3 mi |
Rockville 1 & 2 | Rockville, VA | 4.0 MWh | 25.1 mi |
Skipjack Solar Center | Wayside, VA | 343.4 GWh | 16 mi |
Spruance Operating Services LLC | Richmond, VA | 57.4 GWh | 19 mi |
WestRock-West Point Mill | West Point, VA | 508.9 GWh | 23.7 mi |