MDU / NVSS-II
2371 East Simkins Rd., Pahrump, NV 89060Plant Summary Information
MDU / NVSS-II is ranked #49 out of 60 solar farms in Nevada in terms of total annual net electricity generation.
MDU / NVSS-II generated 7.0 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | MDU / NVSS-II |
---|---|
Utility Name | Greenbacker Renewable Energy Corporation |
Location | Nye County, NV |
Initial Operation Date | February 2017 |
Last Update | Dec 2023 |
Annual Generation | 18.7 GWh |
Annual Consumption | 63.7 k MMBtu |
Ranked #5,138 out of 11,835 Power Plants Nationwide | |
Ranked #1,209 out of 5,643 Solar Power Plants Nationwide | |
Ranked #95 out of 109 Nevada Power Plants | |
Ranked #49 out of 60 Nevada Solar Power Plants | |
Fuel Types | Solar |
Map of MDU / NVSS-II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for MDU / NVSS-II.
Monthly Net Generation for MDU / NVSS-II
MDU / NVSS-II Details
Summary Information | |
---|---|
Plant Name | MDU / NVSS-II (66983) |
Plant Address | 2371 East Simkins Rd., Pahrump, NV 89060 |
Utility | Greenbacker Renewable Energy Corporation (60025) |
Latitude, Longitude | 36.27483, -115.97237 |
Generation Dates on File | Jun 2023 to Dec 2023 |
Initial Operation Date | February 2017 |
Annual Generation | 18.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF16-1148 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Nevada Power Company (NEVP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Valley Electric Assn, Inc (19840) NV |
Grid Voltage | 18.00 kV |
Energy Storage | No |
Generator 822 Details Operating February 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 13.5 MW |
Summer Capacity | 13.5 MW |
Winter Capacity | 13.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | February 2017 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 30 |
DC Net Capacity | 17.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
MDU / NVSS-II Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1199 | Rankin Solar Center, LLC | Florence, SC | 19.1 GWh |
#1200 | KRS I Anahola Solar Hybrid | Anahola, HI | 19.0 GWh |
#1201 | Northern Cardinal Solar SCS IL 1, LLC | Champaign, IL | 19.0 GWh |
#1202 | SPS2 Jal | Jal, NM | 18.9 GWh |
#1203 | Wye Mills VNEM CSG | Queen Anne, MD | 18.9 GWh |
#1204 | Wildberry | Moscow, TN | 18.9 GWh |
#1205 | Five Points Solar Station | Five Points, CA | 18.9 GWh |
#1206 | TPE Whitney Solar, LLC | Kopperl, TX | 18.8 GWh |
#1207 | Tumbleweed Solar, LLC | Redmond, OR | 18.8 GWh |
#1208 | NorWest Energy 2, LLC | Bend, OR | 18.8 GWh |
#1210 | Westside Solar Station | Five Points, CA | 18.5 GWh |
#1211 | HWY 158 PV | Murfreesboro, NC | 18.4 GWh |
#1212 | Covington Solar Farm | Covington, OK | 18.3 GWh |
#1213 | Hyline Solar Center, LLC | Ontario, OR | 18.3 GWh |
#1214 | Orion Solar II | Arvin, CA | 18.3 GWh |
#1215 | South 49th 013445 SCS Norfolk, LLC | Norfolk, NE | 18.2 GWh |
#1216 | Meadows PV 1 | Williamston, NC | 18.2 GWh |
#1217 | Bly Solar Center | Bly, OR | 18.2 GWh |
#1218 | Centinela State Prison | Sacramento, CA | 18.1 GWh |
#1219 | AP Sunray LLC | Knippa, TX | 18.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding MDU / NVSS-II.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
CityCenter Central Plant Cogen Units | Las Vegas, NV | 63.8 GWh | 45.8 mi |
Clark (NVE) | Las Vegas, NV | 693.0 GWh | 53 mi |
Dignity - San Martin | Las Vegas, NV | 3.7 GWh | 41.9 mi |
Dignity - Siena Campus | Henderson, NV | 2.9 GWh | 51.3 mi |
Goodsprings Waste Heat Recovery | Jean, NV | 22.2 GWh | 44.9 mi |
IGS LAS1 | Henderson, NV | 1.0 GWh | 50.7 mi |
IGS VGT | North Las Vegas, NV | 86.0 MWh | 51.6 mi |
IKEA Las Vegas 462 | Las Vegas, NV | 1.4 GWh | 41.1 mi |
Las Vegas Generating Station | North Las Vegas, NV | 410.0 GWh | 47.5 mi |
Las Vegas WPCF Solar Plant | Las Vegas, NV | 5.8 GWh | 53.1 mi |
Nellis Air Force Base Solar Array | Las Vegas, NV | 21.7 GWh | 51.1 mi |
Nellis Solar PV II | North Las Vegas, NV | 38.0 GWh | 51.7 mi |
NVSS-II | Pahrump, NV | 32.7 GWh | 0 mi |
Silver State Solar Power North | Primm, NV | 112.8 GWh | 48.1 mi |
Solar Las Vegas MB 2, LLC | Las Vegas, NV | 3.7 GWh | 46.3 mi |
Solar Las Vegas MB-1 | Las Vegas, NV | 8.7 GWh | 46.1 mi |
Sun Peak Generating Station | Las Vegas, NV | 31.6 GWh | 53.2 mi |
Sunshine Valley Solar | Armagosa, NV | 253.6 GWh | 33.7 mi |
Yellow Pine II | Enterprise, NV | 109.8 GWh | 17.1 mi |
Yellow Pine Solar | Enterprise, NV | 377.8 GWh | 18.1 mi |