McKee City Solar Phase 2
215 Cates Road, Egg Harbor Township, NJ 8234Plant Summary Information
McKee City Solar Phase 2 is ranked #192 out of 314 solar farms in New Jersey in terms of total annual net electricity generation.
McKee City Solar Phase 2 generated 220.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | McKee City Solar Phase 2 |
---|---|
Utility Name | MN8 Energy LLC |
Location | Atlantic County, NJ |
Initial Operation Date | December 2011 |
Last Update | Dec 2023 |
Annual Generation | 2.3 GWh |
Annual Consumption | 8.3 k MMBtu |
Ranked #9,575 out of 11,852 Power Plants Nationwide | |
Ranked #4,335 out of 5,655 Solar Power Plants Nationwide | |
Ranked #254 out of 378 New Jersey Power Plants | |
Ranked #192 out of 314 New Jersey Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Marina Energy LLC (2013 to 2017) GSRP (2018 to 2019) Goldman Sachs Renewable Power Group (2020 to 2020) Goldman Sachs Renewable Power LLC (2021 to 2021) MN8 Energy LLC (2022 to 2023) |
Map of McKee City Solar Phase 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for McKee City Solar Phase 2.
Monthly Net Generation for McKee City Solar Phase 2
McKee City Solar Phase 2 Details
Summary Information | |
---|---|
Plant Name | McKee City Solar Phase 2 (57863) |
Plant Address | 215 Cates Road, Egg Harbor Township, NJ 8234 |
Utility | MN8 Energy LLC (61944) |
Latitude, Longitude | 39.42194, -74.63917 |
Generation Dates on File | Dec 2011 to Dec 2023 |
Initial Operation Date | December 2011 |
Annual Generation | 2.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 17-1229 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Atlantic City Electric Co (963) NJ |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Generator UNIT1 Details Operating December 2011
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
RTO ISO LMP Node Designation | SEARSTOW69 KV |
Nameplate Capacity | 2.4 MW |
Summer Capacity | 2.4 MW |
Winter Capacity | 2.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2011 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 2.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
McKee City Solar Phase 2 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4325 | Hollins Ferry CSG | Halethorpe, MD | 2.3 GWh |
#4326 | Syncarpha Eagle Nest | Eagle Nest, NM | 2.3 GWh |
#4327 | USS Wildcat Solar LLC | Goodhue, MN | 2.3 GWh |
#4328 | Skidmore College | Saratoga Springs, NY | 2.3 GWh |
#4329 | Smith & Wesson at Springfield MA PV | Springfield, MA | 2.3 GWh |
#4330 | Ludlow Site 72 - Conti | Ludlow, MA | 2.3 GWh |
#4331 | Dodge Renewables 1 | Dodge Center, MN | 2.3 GWh |
#4332 | Donaghy-Stockton | Stockton, CA | 2.3 GWh |
#4333 | Westborough Solar LLC | Westborough, MA | 2.3 GWh |
#4334 | Sierra Nevada Brewing Co Hybrid | Chico, CA | 9.3 GWh |
#4336 | Hubble Solar, LLC | Whiteville, NC | 2.3 GWh |
#4337 | General Electric Aircraft Engines | Lynn, MA | 2.3 GWh |
#4338 | Geranium Solar, LLC | Raymond, MN | 2.3 GWh |
#4339 | Gilead Oceanside Solar Project | Oceanside, CA | 2.3 GWh |
#4340 | Chatham Landfill | Chatham, MA | 2.3 GWh |
#4341 | Paynesville CSG1, LLC | Paynesville, MN | 2.3 GWh |
#4342 | Clay County Electrical Cooperative | Corning, AR | 2.3 GWh |
#4343 | USS Pheasant Solar LLC CSG | Clara City, MN | 2.3 GWh |
#4344 | Cedar Falls Solar Farm | Cedar Falls, IA | 2.3 GWh |
#4345 | Colton Solar One, LLC | San Bernardino, CA | 2.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding McKee City Solar Phase 2.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Absegami | Galloway, NJ | 3.5 GWh | 7.7 mi |
AC Criminal Courts Complex SPE2, LLC | Mays Landing, NJ | 1.4 GWh | 2.9 mi |
ACCC Mays Landing | Pleasantville, NJ | 1.6 GWh | 3.5 mi |
ACM - Midtown Thermal | Atlantic City, NJ | 47.1 GWh | 11.8 mi |
Adams Ave MS and HS | Egg Harbor Township, NJ | 3.4 GWh | 5.8 mi |
Atlantic City Convention Center | Atlantic City, NJ | 2.8 GWh | 11.3 mi |
Barrette Outdoor Living, Inc. | Egg Harbor City, NJ | 2.7 GWh | 5 mi |
Cedar Branch | Buena Vista Township, NJ | 9.7 GWh | 18.2 mi |
Cedar Creek | Egg Harbor City, NJ | 2.5 GWh | 8.9 mi |
Clayville | Vineland, NJ | 87.4 GWh | 20.3 mi |
Cumberland (NJ) | Millville, NJ | 65.6 GWh | 17.7 mi |
Delilah Road Landfill | Egg Harbor, NJ | 12.4 GWh | 5.1 mi |
DTE Atlantic, LLC | Atlantic City, NJ | 55.3 GWh | 11.3 mi |
Hammonton-High School Solar | Atlantic, NJ | 1.6 GWh | 18.6 mi |
Jersey-Atlantic Wind Farm | Atlantic City, NJ | 18.4 GWh | 10.6 mi |
Maple Solar | Vineland, NJ | 3.3 GWh | 18.8 mi |
Stockton Athletic Center | Pomona, NJ | 1.3 GWh | 7.2 mi |
The City of Vineland at North Vineland | Vineland, NJ | 5.3 GWh | 20 mi |
Vineland Mays Landing Solar | Millville, NJ | 6.7 GWh | 17.9 mi |
Woodbine Landfill Plant | Woodbine, NJ | 809.0 MWh | 15.2 mi |