McFarland A Solar and Storage
67201 E. Palomas Rd., Dateland, AZ 85333Plant Summary Information
McFarland A Solar and Storage is ranked #36 out of 155 power plants in Arizona in terms of total annual net electricity generation.
McFarland A Solar and Storage generated 163.0 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | McFarland A Solar and Storage |
---|---|
Utility Name | AES Clean Energy |
Location | Yuma County, AZ |
Initial Operation Date | December 2023 |
Last Update | Aug 2024 |
Annual Generation | 324.3 GWh |
Annual Consumption | 1.1 M MMBtu |
Ranked #1,745 out of 11,835 Power Plants Nationwide | |
Ranked #132 out of 5,643 Solar Power Plants Nationwide | |
Ranked #36 out of 155 Arizona Power Plants | |
Ranked #8 out of 102 Arizona Solar Power Plants | |
Fuel Types | Solar |
Map of McFarland A Solar and Storage
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for McFarland A Solar and Storage.
Monthly Net Generation for McFarland A Solar and Storage
McFarland A Solar and Storage Details
Summary Information | |
---|---|
Plant Name | McFarland A Solar and Storage (66636) |
Plant Address | 67201 E. Palomas Rd., Dateland, AZ 85333 |
Utility | AES Clean Energy (64904) |
Latitude, Longitude | 32.95129, -113.49052 |
Generation Dates on File | Dec 2023 to Aug 2024 |
Initial Operation Date | December 2023 |
Annual Generation | 324.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG23-84 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
Grid Voltage | 500.00 kV |
Energy Storage | Yes |
Generator BESS Details Operating December 2023
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 100 MW |
Summer Capacity | 100 MW |
Winter Capacity | 100 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 400 |
---|---|
Maximum Charge Rate | 100 MW |
Maximum Discharge Rate | 100 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 45 |
Storage Enclosure Type | CS |
Frequency Regulation | Yes |
Ramping Spinning Reserve | Yes |
System Peak Shaving | P |
Voltage Or Reactive Power Support | Yes |
Excess Wind And Solar Generation | Yes |
Ac Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 66636 |
Direct Support Gen Id | MCFRA |
Support T D Asset | Yes |
Generator MCFRA Details Operating December 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 200 MW |
Summer Capacity | 200 MW |
Winter Capacity | 200 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Bifacial | Yes |
Azimuth Angle | 180 |
Tilt Angle | 52 |
DC Net Capacity | 250 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
McFarland A Solar and Storage Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#122 | Copper Mountain Solar 2 | Boulder City, NV | 348.7 GWh |
#123 | Arlington Valley Solar Energy II | Arlington, AZ | 348.5 GWh |
#124 | Calhoun Solar | Battle Creek, MI | 346.8 GWh |
#125 | Imperial Valley Solar, LLC | Calexico, CA | 346.4 GWh |
#126 | Lund Hill Solar | Bickleton, WA | 342.2 GWh |
#127 | Fifth Standard Solar PV, LLC (Hybrid) | Huron, CA | 318.4 GWh |
#128 | Quitman Solar | Quitman, GA | 340.1 GWh |
#129 | Edwards Sanborn E1A | Mojave, CA | 323.2 GWh |
#130 | Blythe Solar II, LLC | Blythe, CA | 329.3 GWh |
#131 | Big River Solar | Norris City, IL | 335.2 GWh |
#133 | Newport Solar Project | Newport, AR | 330.0 GWh |
#134 | Texas Solar Nova 2 | Spur, TX | 328.9 GWh |
#135 | Campo Verde Solar | El Centro, CA | 328.6 GWh |
#136 | CA Flats Solar 150, LLC | Shandon, CA | 327.9 GWh |
#137 | American Kings Solar, LLC | Lemoore, CA | 323.7 GWh |
#138 | Quitman II Solar | Quitman, GA | 322.4 GWh |
#139 | Fort Powhatan Solar | Disputanta, VA | 320.2 GWh |
#140 | ANSON Solar Center, LLC | Anson, TX | 318.9 GWh |
#141 | Horizon Solar | Pearsall, TX | 317.8 GWh |
#142 | Lily Solar Hybrid | Scurry, TX | 315.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding McFarland A Solar and Storage.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Agua Caliente Solar Project | Dateland, AZ | 674.0 GWh | 1.8 mi |
Arlington Valley Energy Facility | Arlington, AZ | 3.6 TWh | 44 mi |
Arlington Valley Solar Energy II | Arlington, AZ | 348.5 GWh | 45.2 mi |
Gila Bend Hybrid | Gila Bend, AZ | 80.0 GWh | 35.3 mi |
Gila River Power Block 1 | Gila Bend, AZ | 2.8 TWh | 46.2 mi |
Gila River Power Block 2 | Gila Bend, AZ | 3.4 TWh | 46.2 mi |
Gila River Power Block 4 | Gila Bend, AZ | 2.1 TWh | 46.2 mi |
Harquahala Generating Project | Tonopah, AZ | 2.7 TWh | 42.3 mi |
Hyder II Hybrid | Hyder, AZ | 30.3 GWh | 9.7 mi |
Hyder Solar Hybrid | Hyder, AZ | 40.2 GWh | 9.9 mi |
Mesquite Generating Station Block 1 | Arlington, AZ | 3.6 TWh | 45.3 mi |
Mesquite Generating Station Block 2 | Arlington, AZ | 3.5 TWh | 45.3 mi |
Mesquite Solar 1 | Tonopah, AZ | 403.9 GWh | 43.4 mi |
Mesquite Solar 2, LLC | Tonopah, AZ | 281.1 GWh | 42.6 mi |
Mesquite Solar 3, LLC | Tonopah, AZ | 462.5 GWh | 42.1 mi |
Mesquite Solar 4, LLC | Tonopah, AZ | 103.6 GWh | 42 mi |
Mesquite Solar 5, LLC | Tonopah, AZ | 110.1 GWh | 42 mi |
Red Hawk | Arlington, AZ | 3.8 TWh | 46 mi |
Saddle Mountain Solar I | Tonopah, AZ | 30.9 GWh | 34.5 mi |
Solana Generating Station | Gila Bend, AZ | 805.4 GWh | 31.1 mi |