McCoy Solar Energy Project Hybrid
1990 Dracker Drive, Blythe, CA 92225Plant Summary Information
McCoy Solar Energy Project Hybrid is ranked #32 out of 5,643 solar farms nationwide in terms of total annual net electricity generation.
McCoy Solar Energy Project Hybrid generated 105.8 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | McCoy Solar Energy Project Hybrid |
---|---|
Utility Name | McCoy Solar, LLC |
Location | Riverside County, CA |
Initial Operation Date | August 2015 |
Last Update | Dec 2023 |
Annual Generation | 524.7 GWh |
Annual Consumption | 2.2 M MMBtu |
Ranked #1,247 out of 11,835 Power Plants Nationwide | |
Ranked #32 out of 5,643 Solar Power Plants Nationwide | |
Ranked #77 out of 1,569 California Power Plants | |
Ranked #12 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of McCoy Solar Energy Project Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for McCoy Solar Energy Project Hybrid.
Monthly Net Generation for McCoy Solar Energy Project Hybrid
McCoy Solar Energy Project Hybrid Details
Summary Information | |
---|---|
Plant Name | McCoy Solar Energy Project Hybrid (58462) |
Plant Address | 1990 Dracker Drive, Blythe, CA 92225 |
Utility | McCoy Solar, LLC (58451) |
Latitude, Longitude | 33.69472, -114.73972 |
Generation Dates on File | Aug 2015 to Dec 2023 |
Initial Operation Date | August 2015 |
Annual Generation | 524.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 230.00 kV |
Energy Storage | Yes |
Generator BLK5 Details Operating November 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 31.4 MW |
Summer Capacity | 31.4 MW |
Winter Capacity | 31.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2015 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 40.1 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator BLK6 Details Operating December 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 26.9 MW |
Summer Capacity | 26.9 MW |
Winter Capacity | 26.9 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2015 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Dual Axis Tracking | No |
DC Net Capacity | 32.6 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator BLK8 Details Operating August 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 36.5 MW |
Summer Capacity | 36.5 MW |
Winter Capacity | 36.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2015 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 45.6 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator BLK4 Details Operating September 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 31.4 MW |
Summer Capacity | 31.4 MW |
Winter Capacity | 31.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2015 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 40.3 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator BLK7 Details Operating January 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 41.9 MW |
Summer Capacity | 41.9 MW |
Winter Capacity | 41.9 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2016 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 50.6 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator 1 Details Operating March 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 41.9 MW |
Summer Capacity | 41.9 MW |
Winter Capacity | 41.9 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2016 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 52.9 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator BLK2 Details Operating April 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 21 MW |
Summer Capacity | 21 MW |
Winter Capacity | 21 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2016 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 26 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator BLK3 Details Operating June 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 39.6 MW |
Summer Capacity | 39.6 MW |
Winter Capacity | 39.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2016 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 51.2 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator MCST1 Details Operating July 2021
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 230 MW |
Summer Capacity | 230 MW |
Winter Capacity | 230 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 920 |
---|---|
Maximum Charge Rate | 230 MW |
Maximum Discharge Rate | 230 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 250.4 |
Storage Enclosure Type | CS |
Arbitrage | Yes |
Frequency Regulation | P |
Ramping Spinning Reserve | Yes |
Load Management | Yes |
Voltage Or Reactive Power Support | Yes |
Excess Wind And Solar Generation | Yes |
Ac Coupled | Yes |
Direct Support Of Another Unit | No |
Direct Support Plant Id | 58462 / 58462 / 58462 |
Direct Support Gen Id | 1 / BLK2 / BLK3 |
Support T D Asset | No |
McCoy Solar Energy Project Hybrid Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#22 | Silver State Solar Power South | Primm Valley, NV | 647.5 GWh |
#23 | Texas Solar Nova 1 | Spur, TX | 640.0 GWh |
#24 | Arroyo Solar Energy Storage Hybrid | Pueblo Pintado, NM | 612.2 GWh |
#25 | Arlington Energy Center II | Blythe, CA | 596.9 GWh |
#26 | Mojave Solar Project | Hinkley, CA | 624.3 GWh |
#27 | California Valley Solar Ranch | California Valley, CA | 623.8 GWh |
#28 | Arrow Canyon Solar Hybrid | Moapa, NV | 612.4 GWh |
#29 | Stateline Solar | Nipton, CA | 618.5 GWh |
#30 | Copper Mountain Solar 3 | Boulder City, NV | 610.5 GWh |
#31 | Genesis Solar Energy Project | Blythe, CA | 609.1 GWh |
#33 | Mount Signal Solar Farm V | Calexico, CA | 608.6 GWh |
#34 | Moapa Southern Paiute | Moapa, NV | 604.0 GWh |
#35 | Bighorn Solar 1 | Pueblo, CO | 600.1 GWh |
#36 | Titan Solar Project | Van Horn, TX | 597.8 GWh |
#37 | Blythe Solar 110, LLC | Blythe, CA | 584.2 GWh |
#38 | Athos Solar Project | Desert Center, CA | 593.4 GWh |
#39 | Thunder Wolf Energy Center Hybrid | Avondale, CO | 567.6 GWh |
#40 | Noble Solar | Krum, TX | 575.6 GWh |
#41 | AV Solar Ranch One | Lancaster, CA | 576.3 GWh |
#42 | Oberon II Solar Project | Desert Center, CA | 549.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding McCoy Solar Energy Project Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arica Solar | Desert Center, CA | 387.7 GWh | 33.1 mi |
Arlington Energy Center II | Blythe, CA | 596.9 GWh | 2 mi |
Arlington Energy Center III | Blythe, CA | 263.6 GWh | 2 mi |
Blythe Energy Inc | Blythe, CA | 1.1 TWh | 6.3 mi |
Blythe Mesa Solar II | Blythe, CA | 541.3 GWh | 5.1 mi |
Blythe Solar 110, LLC | Blythe, CA | 584.2 GWh | 1 mi |
Blythe Solar II, LLC | Blythe, CA | 329.3 GWh | 1.2 mi |
Blythe Solar III, LLC Hybrid | Blythe, CA | 340.1 GWh | 2.7 mi |
Blythe Solar IV, LLC | Blythe, CA | 284.6 GWh | 1.8 mi |
Chuckawalla Solar | Blythe, CA | 6.8 GWh | 13.5 mi |
Chuckawalla Valley State Prison | Blythe, CA | 1.2 GWh | 13 mi |
Genesis Solar Energy Project | Blythe, CA | 609.1 GWh | 15 mi |
Ironwood Solar LLC | Blythe, CA | 8.2 GWh | 13.6 mi |
Palo Verde College | Blythe, CA | 2.0 GWh | 5.6 mi |
Solar Blythe 2 | Blythe, CA | 40.5 GWh | 5.8 mi |
Solar Blythe LLC | Blythe, CA | 40.5 GWh | 7.1 mi |
SunEdison Ironwood State Prison | Blythe, CA | 1.3 GWh | 13.5 mi |
Venable Solar 1 | Blythe, CA | 3.4 GWh | 11.7 mi |
Venable Solar 2 | Blythe, CA | 3.4 GWh | 11.8 mi |
Victory Pass | Desert Center, CA | 296.2 GWh | 33.1 mi |