McClellan (AR)
1625 Bradley Ferry Road, Camden, AR 71701Plant Summary Information
McClellan (AR) is ranked #42 out of 77 power plants in Arkansas in terms of total annual net electricity generation.
McClellan (AR) is comprised of 1 generator and generated 12.9 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | McClellan (AR) |
---|---|
Utility Name | Arkansas Electric Coop Corp |
Location | Ouachita County, AR |
Initial Operation Date | May 1972 |
Last Update | Dec 2023 |
Annual Generation | 41.1 GWh |
Annual Consumption | 572.2 k MMBtu |
Ranked #4,128 out of 11,866 Power Plants Nationwide | |
Ranked #1,163 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #42 out of 77 Arkansas Power Plants | |
Ranked #14 out of 22 Arkansas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of McClellan (AR)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for McClellan (AR).
Monthly Net Generation for McClellan (AR)
McClellan (AR) Details
Summary Information | |
---|---|
Plant Name | McClellan (AR) (203) |
Plant Address | 1625 Bradley Ferry Road, Camden, AR 71701 |
Utility | Arkansas Electric Coop Corp (807) |
Latitude, Longitude | 33.5648, -92.7917 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | May 1972 |
Annual Generation | 41.1 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Ouachita River |
Ash Impoundment | No |
Transmission / Distribution Owner | Entergy Arkansas Inc (814) AR |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | ENABLE GAS TRANSMISSION LLC |
Natural Gas Storage | No |
Generator 1 Details Operating May 1972
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | EAI.AECCMCCLLN |
RTO ISO Location Designation For Reporting Wholesale Sales Data | EIA |
Nameplate Capacity | 136 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 134 MW |
Winter Capacity | 134 MW |
Minimum Load | 35 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1972 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / RFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 134 MW |
Net Winter Capacity With Natural Gas | 134 MW |
Net Summer Capacity With Oil | 134 MW |
Net Winter Capacity With Oil | 134 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
McClellan (AR) Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1153 | Pfizer Groton Fuel Cell | Groton, CT | 42.1 GWh |
#1154 | Laredo | Laredo, TX | 42.1 GWh |
#1155 | Franklin Heating Station | Rochester, MN | 57.1 GWh |
#1156 | Elk River | Elk River, MN | 42.1 GWh |
#1157 | Suwannee River | Live Oak, FL | 42.3 GWh |
#1158 | Yuma Cogeneration Associates | Yuma, AZ | 41.8 GWh |
#1159 | Erving Paper Mills | Erving, MA | 42.6 GWh |
#1160 | Packaging of America Tomahawk Mill | Tomahawk, WI | 112.9 GWh |
#1161 | Indiana Harbor E 5 AC Station | East Chicago, IN | 663.0 GWh |
#1162 | MCAGCC Cogen Plant | Twentynine Palms, CA | 41.3 GWh |
#1164 | Columbus MS | Columbus, MS | 457.7 GWh |
#1165 | Glenarm | Pasadena, CA | 40.9 GWh |
#1166 | Florida's Natural Growers | Lake Wales, FL | 40.8 GWh |
#1167 | Alabama River Pulp | Perdue Hill, AL | 302.9 GWh |
#1168 | International Paper Riegelwood Mill | Riegelwood, NC | 313.0 GWh |
#1169 | Merck Rahway Power Plant | Rahway, NJ | 40.7 GWh |
#1170 | Indeck Silver Springs Energy Center | Silver Springs, NY | 40.8 GWh |
#1171 | Clearwater Paper APP CB | Arkansas City, AR | 110.7 GWh |
#1172 | Apple Staten Island - Industrial Loop | Staten Island, NY | 40.1 GWh |
#1173 | Waterbury Generation | Waterbury, CT | 40.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding McClellan (AR).
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ashley-Chicot Solar | Hamburg, AR | 2.2 GWh | 54.6 mi |
C&L | Star City, AR | 2.2 GWh | 65.6 mi |
Carpenter | Hot Springs, AR | 150.6 GWh | 62.1 mi |
Crossett Solar | AR | 27.6 GWh | 58.5 mi |
Degray | Arkadelphia, AR | 152.6 GWh | 48.3 mi |
Fulton (AR) | Fulton, AR | 148.8 GWh | 57.7 mi |
General Dynamics | Hampton, AR | 3.4 GWh | 14.7 mi |
Georgia-Pacific Crossett LLC | Crossett, AR | 4.4 GWh | 55.4 mi |
Hot Spring Generating Facility | Malvern, AR | 1.8 TWh | 50.8 mi |
Hot Springs 2020 | Hot Springs, AR | 1.7 GWh | 63.5 mi |
John W Turk Jr Power Plant | Fulton, AR | 2.8 TWh | 59 mi |
Lake Catherine | Jones Mill, AR | 173.5 GWh | 60.4 mi |
Magnet Cove | Malvern, AR | 4.0 TWh | 59.8 mi |
Narrows (AR) | Murfreesboro, AR | 46.7 GWh | 66.6 mi |
Pine Bluff Energy Center | Pine Bluff, AR | 1.2 TWh | 68.1 mi |
Pine Bluff Mill | Pine Bluff, AR | 289.0 GWh | 68 mi |
Prairie Mist Solar | Montrose, AR | 21.8 GWh | 68.2 mi |
Remmel | Malvern, AR | 39.7 GWh | 59.9 mi |
SR Camden | Camden, AR | 21.0 GWh | 6.9 mi |
Union Power Station | El Dorado, AR | 11.3 TWh | 21.9 mi |