Matilda Hamilton Fee Hydroelectric Station
1624 Kirkland Avenue, Ravenna, KY 40472Plant Summary Information
Matilda Hamilton Fee Hydroelectric Station is ranked #40 out of 54 power plants in Kentucky in terms of total annual net electricity generation.
Matilda Hamilton Fee Hydroelectric Station is comprised of 5 generators and generated 896.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Matilda Hamilton Fee Hydroelectric Station |
---|---|
Utility Name | Lock 12 Hydro Partners, LLC |
Location | Estill County, KY |
Initial Operation Date | September 2021 |
Last Update | Dec 2023 |
Annual Generation | 5.3 GWh |
Annual Consumption | 19.9 k MMBtu |
Ranked #7,571 out of 11,852 Power Plants Nationwide | |
Ranked #1,147 out of 1,371 Water Power Plants Nationwide | |
Ranked #40 out of 54 Kentucky Power Plants | |
Ranked #11 out of 11 Kentucky Water Power Plants | |
Fuel Types | Water |
Map of Matilda Hamilton Fee Hydroelectric Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Matilda Hamilton Fee Hydroelectric Station.
Monthly Net Generation for Matilda Hamilton Fee Hydroelectric Station
Matilda Hamilton Fee Hydroelectric Station Details
Summary Information | |
---|---|
Plant Name | Matilda Hamilton Fee Hydroelectric Station (62747) |
Plant Address | 1624 Kirkland Avenue, Ravenna, KY 40472 |
Utility | Lock 12 Hydro Partners, LLC (62661) |
Latitude, Longitude | 37.67748, -83.94855 |
Generation Dates on File | Sep 2021 to Dec 2023 |
Initial Operation Date | September 2021 |
Annual Generation | 5.3 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Kentucky River |
Ash Impoundment | |
Transmission / Distribution Owner | Jackson Energy Coop Corp - (KY) (9575) KY |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator 1 Details Operating September 2021
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.5 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 2 Details Operating September 2021
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.5 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 3 Details Operating September 2021
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.5 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 4 Details Operating September 2021
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.5 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 5 Details Operating September 2021
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.5 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Matilda Hamilton Fee Hydroelectric Station Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1137 | Causey | South Fork, UT | 5.5 GWh |
#1138 | South Fork | Klawock, AK | 5.4 GWh |
#1139 | Scott Flat | Nevada City, CA | 5.4 GWh |
#1140 | Tannery Island Power | Carthage, NY | 5.4 GWh |
#1141 | Drop 1 | Holtville, CA | 5.4 GWh |
#1142 | McPhee | Cortez, CO | 5.4 GWh |
#1143 | Crystal Falls | Crystal Falls, MI | 5.4 GWh |
#1144 | Stiles | Oconto Falls, WI | 5.4 GWh |
#1145 | Newport Hydro | Newport, NY | 5.3 GWh |
#1146 | Cosgrove Intake and Power Station | Clinton, MA | 5.3 GWh |
#1148 | Ottumwa City of | Ottumwa, IA | 5.3 GWh |
#1149 | Big Thompson | Loveland, CO | 5.3 GWh |
#1150 | Jordan Hydroelectric Project | Moncure, NC | 5.2 GWh |
#1151 | Mt Ida Hydroelectric | Troy, NY | 5.2 GWh |
#1152 | Port Leyden Hydroelectric Project | Port Leyden, NY | 5.2 GWh |
#1153 | Perris | Perris, CA | 5.2 GWh |
#1154 | Lower Beaver Falls Project | Beaver Falls, NY | 5.2 GWh |
#1155 | Messalonskee 5 | Waterville, ME | 5.1 GWh |
#1156 | Thundermist Hydro | Providence, RI | 5.1 GWh |
#1157 | Lake Mathews | Riverside, CA | 5.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Matilda Hamilton Fee Hydroelectric Station.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Big Sandy | Louisa, KY | 1.2 TWh | 80.1 mi |
Blue Ridge Generating | Irvine, KY | 3.9 GWh | 4.9 mi |
Cooper | Somerset, KY | 435.7 GWh | 58.8 mi |
Cooperative Solar One | Winchester, KY | 13.1 GWh | 29.4 mi |
Cox Waste to Energy | Campbellsville, KY | 924.0 MWh | 81.3 mi |
Dix Dam | Harrodsburg, KY | 44.0 GWh | 41.9 mi |
E W Brown | Harrodsburg, KY | 1.4 TWh | 42.4 mi |
Green City Recovery, LLC | Georgetown, KY | 1.7 GWh | 56.5 mi |
Green Valley LFGTE | Ashland, KY | 16.9 GWh | 79.5 mi |
H L Spurlock | Maysville, KY | 7.8 TWh | 71 mi |
J K Smith | Winchester, KY | 641.4 GWh | 16.5 mi |
Laurel Dam | London, KY | 39.6 GWh | 52.5 mi |
Laurel Ridge LFGTE | Lily, KY | 3.4 GWh | 45.1 mi |
Meldahl Hydroelectric Project | Foster, KY | 539.3 GWh | 77.9 mi |
Morehead Generating Facility | Morehead, KY | 3.9 GWh | 41.8 mi |
Mother Ann Lee | Harrodsburg, KY | 6.2 GWh | 43.7 mi |
Paris (KY) | Paris, KY | 337.1 MWh | 39.7 mi |
Pendleton County LFGTE | Butler, KY | 23.1 GWh | 77.1 mi |
Riverside Generating LLC | Catlettsburg, KY | 612.1 GWh | 81.4 mi |
SR Turkey Creek, LLC | Lancaster, KY | 106.7 GWh | 34.4 mi |