Matilda Hamilton Fee Hydroelectric Station

1624 Kirkland Avenue, Ravenna, KY 40472

Plant Summary Information

Matilda Hamilton Fee Hydroelectric Station is ranked #40 out of 54 power plants in Kentucky in terms of total annual net electricity generation.

Matilda Hamilton Fee Hydroelectric Station is comprised of 5 generators and generated 896.0 MWh during the 3-month period between September 2023 to December 2023.

Plant NameMatilda Hamilton Fee Hydroelectric Station
Utility NameLock 12 Hydro Partners, LLC
LocationEstill County, KY
Initial Operation DateSeptember 2021
Last Update Dec 2023
Annual Generation 5.3 GWh
Annual Consumption 19.9 k MMBtu
Ranked #7,557 out of 11,835 Power Plants Nationwide
Ranked #1,146 out of 1,371 Water Power Plants Nationwide
Ranked #40 out of 54 Kentucky Power Plants
Ranked #11 out of 11 Kentucky Water Power Plants
Fuel Types Water

Map of Matilda Hamilton Fee Hydroelectric Station

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Matilda Hamilton Fee Hydroelectric Station.

Create Your Account Today

Monthly Net Generation for Matilda Hamilton Fee Hydroelectric Station

Matilda Hamilton Fee Hydroelectric Station Details

Summary Information
Plant NameMatilda Hamilton Fee Hydroelectric Station (62747)
Plant Address1624 Kirkland Avenue, Ravenna, KY 40472
UtilityLock 12 Hydro Partners, LLC (62661)
Latitude, Longitude37.67748, -83.94855
Generation Dates on FileSep 2021 to Dec 2023
Initial Operation DateSeptember 2021
Annual Generation 5.3 GWh
Fuel Types Water
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionSERC
Balancing AuthorityPJM Interconnection, LLC (PJM)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water SourceKentucky River
Ash Impoundment
Transmission / Distribution OwnerJackson Energy Coop Corp - (KY) (9575) KY
Grid Voltage 12.47 kV
Energy StorageNo

Generator 1 Details Operating September 2021

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity0.5 MW
Nameplate Power Factor1
Summer Capacity0.5 MW
Winter Capacity0.5 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateSeptember 2021
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceWater
Time From Cold Shutdown To Full Load10M

Generator 2 Details Operating September 2021

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity0.5 MW
Nameplate Power Factor1
Summer Capacity0.5 MW
Winter Capacity0.5 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateSeptember 2021
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceWater
Time From Cold Shutdown To Full Load10M

Generator 3 Details Operating September 2021

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity0.5 MW
Nameplate Power Factor1
Summer Capacity0.5 MW
Winter Capacity0.5 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateSeptember 2021
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceWater
Time From Cold Shutdown To Full Load10M

Generator 4 Details Operating September 2021

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity0.5 MW
Nameplate Power Factor1
Summer Capacity0.5 MW
Winter Capacity0.5 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateSeptember 2021
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceWater
Time From Cold Shutdown To Full Load10M

Generator 5 Details Operating September 2021

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity0.5 MW
Nameplate Power Factor1
Summer Capacity0.5 MW
Winter Capacity0.5 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateSeptember 2021
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceWater
Time From Cold Shutdown To Full Load10M

Matilda Hamilton Fee Hydroelectric Station Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Water.

RankPlant NamePlant LocationAnnual Generation
#1136CauseySouth Fork, UT5.5 GWh
#1137South ForkKlawock, AK5.4 GWh
#1138Scott FlatNevada City, CA5.4 GWh
#1139Tannery Island PowerCarthage, NY5.4 GWh
#1140Drop 1Holtville, CA5.4 GWh
#1141McPheeCortez, CO5.4 GWh
#1142Crystal FallsCrystal Falls, MI5.4 GWh
#1143StilesOconto Falls, WI5.4 GWh
#1144Newport HydroNewport, NY5.3 GWh
#1145Cosgrove Intake and Power StationClinton, MA5.3 GWh
#1147Ottumwa City ofOttumwa, IA5.3 GWh
#1148Big ThompsonLoveland, CO5.3 GWh
#1149Jordan Hydroelectric ProjectMoncure, NC5.2 GWh
#1150Mt Ida HydroelectricTroy, NY5.2 GWh
#1151Port Leyden Hydroelectric ProjectPort Leyden, NY5.2 GWh
#1152PerrisPerris, CA5.2 GWh
#1153Lower Beaver Falls ProjectBeaver Falls, NY5.2 GWh
#1154Messalonskee 5Waterville, ME5.1 GWh
#1155Tallassee Hydro ProjectClarke, GA5.1 GWh
#1156Thundermist HydroProvidence, RI5.1 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Matilda Hamilton Fee Hydroelectric Station.

Plant NamePlant LocationAnnual GenerationDistance
Big SandyLouisa, KY1.2 TWh80.1 mi
Blue Ridge GeneratingIrvine, KY3.7 GWh4.9 mi
CooperSomerset, KY451.4 GWh58.8 mi
Cooperative Solar OneWinchester, KY13.1 GWh29.4 mi
Cox Waste to EnergyCampbellsville, KY924.0 MWh81.3 mi
Dix DamHarrodsburg, KY44.0 GWh41.9 mi
E W BrownHarrodsburg, KY1.4 TWh42.4 mi
Green City Recovery, LLCGeorgetown, KY1.7 GWh56.5 mi
Green Valley LFGTEAshland, KY16.9 GWh79.5 mi
H L SpurlockMaysville, KY8.0 TWh71 mi
J K SmithWinchester, KY629.8 GWh16.5 mi
Laurel DamLondon, KY39.6 GWh52.5 mi
Laurel Ridge LFGTELily, KY3.4 GWh45.1 mi
Meldahl Hydroelectric ProjectFoster, KY539.3 GWh77.9 mi
Morehead Generating FacilityMorehead, KY3.9 GWh41.8 mi
Mother Ann LeeHarrodsburg, KY6.2 GWh43.7 mi
Paris (KY)Paris, KY337.1 MWh39.7 mi
Pendleton County LFGTEButler, KY23.1 GWh77.1 mi
Riverside Generating LLCCatlettsburg, KY595.1 GWh81.4 mi
SR Turkey Creek, LLCLancaster, KY113.0 GWh34.4 mi