Martin
21900 SW Warfield Blvd, Indiantown, FL 34956Plant Summary Information
Martin is ranked #32 out of 2,255 natural gas power plants nationwide in terms of total annual net electricity generation.
Martin is comprised of 11 generators and generated 1.1 TWh during the 3-month period between October 2024 to January 2025.
Plant Name | Martin |
---|---|
Utility Name | Florida Power & Light Co |
Location | Martin County, FL |
Initial Operation Date | December 1980 |
Last Update | Jan 2025 |
Annual Generation | 7.7 TWh |
Annual Consumption | 55.9 M MMBtu |
Ranked #106 out of 11,979 Power Plants Nationwide | |
Ranked #32 out of 2,255 Natural Gas Power Plants Nationwide | |
Ranked #10 out of 307 Florida Power Plants | |
Ranked #8 out of 85 Florida Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Martin
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Martin.
Monthly Net Generation for Martin
Martin Details
Summary Information | |
---|---|
Plant Name | Martin (6043) |
Plant Address | 21900 SW Warfield Blvd, Indiantown, FL 34956 |
Utility | Florida Power & Light Co (6452) |
Latitude, Longitude | 27.0536, -80.5628 |
Generation Dates on File | Jan 2001 to Jan 2025 |
Initial Operation Date | December 1980 |
Annual Generation | 7.7 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Florida Power & Light Company (FPL) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | St. Lucie Canal |
Ash Impoundment | |
Transmission / Distribution Owner | Florida Power & Light Co (6452) FL |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | FLORIDA GAS TRANSMISSION COMPANY |
Natural Gas Storage | No |
Generator 3GT1 Details Operating February 1994
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | C796 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 204 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 165 MW |
Winter Capacity | 185 MW |
Minimum Load | 143 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 1994 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 3GT2 Details Operating February 1994
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | C796 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 204 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 165 MW |
Winter Capacity | 185 MW |
Minimum Load | 143 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 1994 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 3ST Details Operating February 1994
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | C796 |
Ownership | Single Owner |
Duct Burners | No |
Nameplate Capacity | 204 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 157 MW |
Winter Capacity | 163 MW |
Minimum Load | 143 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 1994 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 4GT1 Details Operating April 1994
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | C797 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 204 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 165 MW |
Winter Capacity | 185 MW |
Minimum Load | 143 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 1994 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 4GT2 Details Operating April 1994
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | C797 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 204 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 165 MW |
Winter Capacity | 185 MW |
Minimum Load | 143 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 1994 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 4ST Details Operating April 1994
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | C797 |
Ownership | Single Owner |
Duct Burners | No |
Nameplate Capacity | 204 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 157 MW |
Winter Capacity | 163 MW |
Minimum Load | 143 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 1994 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 8A Details Operating June 2001
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | G342 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 188.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 196.8 MW |
Winter Capacity | 207 MW |
Minimum Load | 95 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2001 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 160 MW |
Net Winter Capacity With Natural Gas | 173 MW |
Net Summer Capacity With Oil | 165 MW |
Net Winter Capacity With Oil | 178 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 8B Details Operating June 2001
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | G342 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 188.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 196.8 MW |
Winter Capacity | 207 MW |
Minimum Load | 95 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2001 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 160 MW |
Net Winter Capacity With Natural Gas | 173 MW |
Net Summer Capacity With Oil | 165 MW |
Net Winter Capacity With Oil | 178 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 8 Details Operating June 2005
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | G342 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 471.7 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 447.8 MW |
Winter Capacity | 443 MW |
Minimum Load | 133 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2005 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Solar / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 439 MW |
Net Winter Capacity With Natural Gas | 443 MW |
Net Summer Capacity With Oil | 333 MW |
Net Winter Capacity With Oil | 359 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 8C Details Operating June 2005
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | G342 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 188.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 196.8 MW |
Winter Capacity | 207 MW |
Minimum Load | 95 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2005 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 160 MW |
Net Winter Capacity With Natural Gas | 173 MW |
Net Summer Capacity With Oil | 165 MW |
Net Winter Capacity With Oil | 178 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 8D Details Operating June 2005
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | G342 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 188.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 196.8 MW |
Winter Capacity | 207 MW |
Minimum Load | 95 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2005 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 160 MW |
Net Winter Capacity With Natural Gas | 173 MW |
Net Summer Capacity With Oil | 165 MW |
Net Winter Capacity With Oil | 178 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Martin Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#22 | Lawrenceburg Power, LLC | Lawrenceburg, IN | 8.5 TWh |
#23 | Thomas A Smith Energy Facility | Dalton, GA | 8.4 TWh |
#24 | Seminole (FL) | Palatka, FL | 10.5 TWh |
#25 | Blue Water Energy Center | East China, MI | 8.3 TWh |
#26 | Hanging Rock Energy Facility | Ironton, OH | 8.2 TWh |
#27 | McIntosh Combined Cycle Facility | Rincon, GA | 8.0 TWh |
#28 | Paradise | Drakesboro, KY | 8.0 TWh |
#29 | Deer Park Energy Center | Deer Park, TX | 7.9 TWh |
#30 | Wansley Combined Cycle | Franklin, GA | 7.8 TWh |
#31 | Moxie Freedom Generation Plant | Salem Township, PA | 7.8 TWh |
#33 | Fairless Energy Center | Fairless Hills, PA | 7.7 TWh |
#34 | CPV Fairview Energy Center | Johnstown, PA | 7.6 TWh |
#35 | Hummel Station LLC | Shamokin Dam, PA | 7.6 TWh |
#36 | Odessa-Ector Power Plant | Odessa, TX | 7.5 TWh |
#37 | Panda Temple Power Station | Temple, TX | 7.4 TWh |
#38 | Port Washington Generating Station | Port Washington, WI | 7.4 TWh |
#39 | Belews Creek | Belews Creek, NC | 9.6 TWh |
#40 | Jackson Generation, LLC | Elwood, IL | 7.2 TWh |
#41 | New Covert Generating Facility | Covert, MI | 7.2 TWh |
#42 | Riviera | Riviera Beach, FL | 7.2 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Martin.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Big Water | TBD, FL | 6.2 GWh | 30.6 mi |
Bluefield Preserve Solar | Okeechobee, FL | 150.1 GWh | 14.7 mi |
Fawn | TBD, FL | 9.4 GWh | 11.3 mi |
Hibiscus Solar Energy Center | Westlake, FL | 147.7 GWh | 25.7 mi |
Holopaw | TBD, FL | 5.3 GWh | 21.3 mi |
Interstate Solar Energy Center | Ft. Pierce, FL | 137.3 GWh | 31.8 mi |
Lakeside Solar Center | Okeechobee, FL | 138.0 GWh | 15.8 mi |
Loggerhead Solar Energy Center | Port St. Lucie, FL | 134.2 GWh | 12.8 mi |
Monarch | TBD, FL | 147.5 GWh | 2.8 mi |
Pineapple | Port St Lucie, FL | 165.2 GWh | 13.9 mi |
Pink Trial Solar Energy Center | Port St. Lucie, FL | 151.6 GWh | 16.9 mi |
Sabal Palm Solar Center | Loxahatchee, FL | 154.1 GWh | 22.8 mi |
Silver Palm | TBD, FL | 160.9 GWh | 22.5 mi |
Speckled Perch | TBD, FL | 6.7 GWh | 21.4 mi |
St Lucie | Jensen Beach, FL | 14.8 TWh | 28.2 mi |
Sundew | Port St Lucie, FL | 149.0 GWh | 14.6 mi |
Sweetbay Solar Center | North of Indiantown, FL | 120.5 GWh | 5.5 mi |
Treasure Coast Energy Center | Ft. Pierce, FL | 1.8 TWh | 25.5 mi |
West County Energy Center | Loxahatchee, FL | 19.5 TWh | 27.1 mi |
White Tail | TBD, FL | 176.1 GWh | 11.4 mi |