Martin
21900 SW Warfield Blvd, Indiantown, FL 34956Plant Summary Information
Martin is ranked #42 out of 2,253 natural gas power plants nationwide in terms of total annual net electricity generation.
Martin is comprised of 11 generators and generated 2.8 TWh during the 3-month period between May 2024 to August 2024.
Plant Name | Martin |
---|---|
Utility Name | Florida Power & Light Co |
Location | Martin County, FL |
Initial Operation Date | December 1980 |
Last Update | Aug 2024 |
Annual Generation | 7.2 TWh |
Annual Consumption | 59.2 M MMBtu |
Ranked #123 out of 11,835 Power Plants Nationwide | |
Ranked #42 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #12 out of 279 Florida Power Plants | |
Ranked #10 out of 85 Florida Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Martin
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Martin.
Monthly Net Generation for Martin
Martin Details
Summary Information | |
---|---|
Plant Name | Martin (6043) |
Plant Address | 21900 SW Warfield Blvd, Indiantown, FL 34956 |
Utility | Florida Power & Light Co (6452) |
Latitude, Longitude | 27.0536, -80.5628 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | December 1980 |
Annual Generation | 7.2 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Florida Power & Light Company (FPL) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | St. Lucie Canal |
Ash Impoundment | |
Transmission / Distribution Owner | Florida Power & Light Co (6452) FL |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | FLORIDA GAS TRANSMISSION COMPANY |
Natural Gas Storage | No |
Generator 3GT1 Details Operating February 1994
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | C796 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 204 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 165 MW |
Winter Capacity | 185 MW |
Minimum Load | 143 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 1994 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 3GT2 Details Operating February 1994
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | C796 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 204 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 165 MW |
Winter Capacity | 185 MW |
Minimum Load | 143 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 1994 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 3ST Details Operating February 1994
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | C796 |
Ownership | Single Owner |
Duct Burners | No |
Nameplate Capacity | 204 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 157 MW |
Winter Capacity | 163 MW |
Minimum Load | 143 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 1994 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 4GT1 Details Operating April 1994
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | C797 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 204 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 165 MW |
Winter Capacity | 185 MW |
Minimum Load | 143 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 1994 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 4GT2 Details Operating April 1994
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | C797 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 204 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 165 MW |
Winter Capacity | 185 MW |
Minimum Load | 143 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 1994 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 4ST Details Operating April 1994
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | C797 |
Ownership | Single Owner |
Duct Burners | No |
Nameplate Capacity | 204 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 157 MW |
Winter Capacity | 163 MW |
Minimum Load | 143 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 1994 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 8A Details Operating June 2001
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | G342 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 188.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 196.8 MW |
Winter Capacity | 207 MW |
Minimum Load | 95 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2001 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 160 MW |
Net Winter Capacity With Natural Gas | 173 MW |
Net Summer Capacity With Oil | 165 MW |
Net Winter Capacity With Oil | 178 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 8B Details Operating June 2001
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | G342 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 188.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 196.8 MW |
Winter Capacity | 207 MW |
Minimum Load | 95 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2001 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 160 MW |
Net Winter Capacity With Natural Gas | 173 MW |
Net Summer Capacity With Oil | 165 MW |
Net Winter Capacity With Oil | 178 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 8 Details Operating June 2005
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | G342 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 471.7 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 447.8 MW |
Winter Capacity | 443 MW |
Minimum Load | 133 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2005 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Solar / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 439 MW |
Net Winter Capacity With Natural Gas | 443 MW |
Net Summer Capacity With Oil | 333 MW |
Net Winter Capacity With Oil | 359 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 8C Details Operating June 2005
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | G342 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 188.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 196.8 MW |
Winter Capacity | 207 MW |
Minimum Load | 95 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2005 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 160 MW |
Net Winter Capacity With Natural Gas | 173 MW |
Net Summer Capacity With Oil | 165 MW |
Net Winter Capacity With Oil | 178 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 8D Details Operating June 2005
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | G342 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 188.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 196.8 MW |
Winter Capacity | 207 MW |
Minimum Load | 95 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2005 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 160 MW |
Net Winter Capacity With Natural Gas | 173 MW |
Net Summer Capacity With Oil | 165 MW |
Net Winter Capacity With Oil | 178 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Martin Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#32 | Moxie Freedom Generation Plant | Salem Township, PA | 7.7 TWh |
#33 | Deer Park Energy Center | Deer Park, TX | 7.7 TWh |
#34 | Riviera | Riviera Beach, FL | 7.6 TWh |
#35 | Paradise | Drakesboro, KY | 7.5 TWh |
#36 | Blue Water Energy Center | East China, MI | 7.4 TWh |
#37 | New Covert Generating Facility | Covert, MI | 7.4 TWh |
#38 | Odessa-Ector Power Plant | Odessa, TX | 7.3 TWh |
#39 | Big Bend | Apollo Beach, FL | 7.7 TWh |
#40 | Wolf Hollow II | Granbury, TX | 7.2 TWh |
#41 | Colorado Bend II | Wharton, TX | 7.2 TWh |
#43 | Freestone Energy Center | Fairfield, TX | 7.2 TWh |
#44 | Panda Temple Power Station | Temple, TX | 7.1 TWh |
#45 | Guadalupe Generating Station | Marion, TX | 7.1 TWh |
#46 | Jackson Generation, LLC | Elwood, IL | 7.1 TWh |
#47 | Turkey Point | Homestead, FL | 21.3 TWh |
#48 | Victor J Daniel Jr | Escatawpa, MS | 8.6 TWh |
#49 | Manatee | Parrish, FL | 7.0 TWh |
#50 | CPV Fairview Energy Center | Johnstown, PA | 7.0 TWh |
#51 | Chuck Lenzie Generating Station | Apex, NV | 6.9 TWh |
#52 | Chouteau | Pryor, OK | 6.9 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Martin.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bluefield Preserve Solar | Okeechobee, FL | 149.4 GWh | 14.7 mi |
Clewiston Sugar House | Clewiston, FL | 272.6 GWh | 31.9 mi |
Hibiscus Solar Energy Center | Westlake, FL | 146.0 GWh | 25.7 mi |
Interstate Solar Energy Center | Ft. Pierce, FL | 138.9 GWh | 31.8 mi |
Lakeside Solar Center | Okeechobee, FL | 137.2 GWh | 15.8 mi |
Loggerhead Solar Energy Center | Port St. Lucie, FL | 134.8 GWh | 12.8 mi |
Monarch | TBD, FL | 99.3 GWh | 2.8 mi |
Palm Beach Renewable Energy Facility 1 | West Palm Beach, FL | 318.5 GWh | 32.4 mi |
Palm Beach Renewable Energy Facility 2 | West Palm Beach, FL | 528.8 GWh | 32.4 mi |
Pelican Solar Center | Ft. Pierce, FL | 152.8 GWh | 32.4 mi |
Pineapple | Port St Lucie, FL | 111.5 GWh | 13.9 mi |
Pink Trial Solar Energy Center | Port St. Lucie, FL | 151.4 GWh | 16.9 mi |
Sabal Palm Solar Center | Loxahatchee, FL | 153.7 GWh | 22.8 mi |
Silver Palm | TBD, FL | 113.2 GWh | 22.5 mi |
St Lucie | Jensen Beach, FL | 15.7 TWh | 28.2 mi |
Sundew | Port St Lucie, FL | 147.8 GWh | 14.6 mi |
Sweetbay Solar Center | North of Indiantown, FL | 116.6 GWh | 5.5 mi |
Treasure Coast Energy Center | Ft. Pierce, FL | 1.8 TWh | 25.5 mi |
West County Energy Center | Loxahatchee, FL | 21.1 TWh | 27.1 mi |
White Tail | TBD, FL | 121.1 GWh | 11.4 mi |