Marshall Energy Facility
6264 Industrial Parkway, Calvert City, KY 42029Plant Summary Information
Marshall Energy Facility is ranked #25 out of 49 power plants in Kentucky in terms of total annual net electricity generation.
Marshall Energy Facility is comprised of 8 generators and generated 462.0 MWh during the 3-month period between December 2023 to March 2024.
Plant Name | Marshall Energy Facility |
---|---|
Utility Name | Tennessee Valley Authority |
Location | Marshall County, KY |
Initial Operation Date | June 2002 |
Last Update | Mar 2024 |
Annual Generation | 134.5 GWh |
Annual Consumption | 1.7 M MMBtu |
Ranked #2,808 out of 11,249 Power Plants Nationwide | |
Ranked #831 out of 2,188 Natural Gas Power Plants Nationwide | |
Ranked #25 out of 49 Kentucky Power Plants | |
Ranked #9 out of 14 Kentucky Natural Gas Power Plants | |
Fuel Types | Natural Gas : 99.8% |
Map of Marshall Energy Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Marshall Energy Facility.
Monthly Net Generation for Marshall Energy Facility
Marshall Energy Facility Details
Summary Information | |
---|---|
Plant Name | Marshall Energy Facility (55232) |
Plant Address | 6264 Industrial Parkway Calvert City, KY 42029 |
Utility | Tennessee Valley Authority (18642) |
Latitude, Longitude | 37.0286, -88.3958 |
Generation Dates on File | Jun 2002 to Mar 2024 |
Initial Operation Date | June 2002 |
Annual Generation | 134.5 GWh |
Fuel Types | Natural Gas : 99.8% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 02-48-000 |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Tennessee Valley Authority (TVA) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Tennessee Valley Authority (18642) KY |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | TEXAS GAS SERVICE |
Pipeline Name | TEXAS GAS TRANSMISSION LLC |
Natural Gas Storage | No |
Generator CT1 Details Operating June 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 86 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 72.7 MW |
Winter Capacity | 92.8 MW |
Minimum Load | 45 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2002 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 72.7 MW |
Net Winter Capacity With Natural Gas | 92.8 MW |
Net Summer Capacity With Oil | 74.5 MW |
Net Winter Capacity With Oil | 94.8 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator CT2 Details Operating June 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 86 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 72.7 MW |
Winter Capacity | 92.8 MW |
Minimum Load | 45 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2002 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 72.7 MW |
Net Winter Capacity With Natural Gas | 92.8 MW |
Net Summer Capacity With Oil | 74.5 MW |
Net Winter Capacity With Oil | 94.8 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator CT3 Details Operating June 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 86 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 72.7 MW |
Winter Capacity | 92.8 MW |
Minimum Load | 45 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2002 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 72.7 MW |
Net Winter Capacity With Natural Gas | 92.8 MW |
Net Summer Capacity With Oil | 74.5 MW |
Net Winter Capacity With Oil | 94.8 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator CT4 Details Standby June 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 86 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 72.7 MW |
Winter Capacity | 92.8 MW |
Minimum Load | 45 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | June 2002 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 72.7 MW |
Net Winter Capacity With Natural Gas | 92.8 MW |
Net Summer Capacity With Oil | 74.5 MW |
Net Winter Capacity With Oil | 94.8 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator CT5 Details Standby June 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 86 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 72.7 MW |
Winter Capacity | 92.8 MW |
Minimum Load | 45 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | June 2002 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 72.7 MW |
Net Winter Capacity With Natural Gas | 92.8 MW |
Net Summer Capacity With Oil | 74.5 MW |
Net Winter Capacity With Oil | 94.8 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator CT6 Details Standby August 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 86 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 72.7 MW |
Winter Capacity | 92.8 MW |
Minimum Load | 45 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | August 2002 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 72.7 MW |
Net Winter Capacity With Natural Gas | 92.8 MW |
Net Summer Capacity With Oil | 74.5 MW |
Net Winter Capacity With Oil | 94.8 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator CT7 Details Standby August 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 86 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 72.7 MW |
Winter Capacity | 92.8 MW |
Minimum Load | 45 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | August 2002 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 72.7 MW |
Net Winter Capacity With Natural Gas | 92.8 MW |
Net Summer Capacity With Oil | 74.5 MW |
Net Winter Capacity With Oil | 94.8 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator CT8 Details Standby August 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 86 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 72.7 MW |
Winter Capacity | 92.8 MW |
Minimum Load | 45 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | August 2002 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 72.7 MW |
Net Winter Capacity With Natural Gas | 92.8 MW |
Net Summer Capacity With Oil | 74.5 MW |
Net Winter Capacity With Oil | 94.8 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Marshall Energy Facility Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#821 | Elgin Energy Center LLC | Elgin, IL | 138.0 GWh |
#822 | Harbor | Wilmington, CA | 137.9 GWh |
#823 | Wasson CO2 Removal Plant | Denver City, TX | 137.6 GWh |
#824 | Doyle Energy Facility | Monroe, GA | 137.4 GWh |
#825 | Montpelier Electric Generating Station | Poneto, IN | 141.8 GWh |
#826 | Graham | Graham, TX | 167.2 GWh |
#827 | Gans | Gans, PA | 135.3 GWh |
#828 | Rubart | Ulysses, KS | 135.2 GWh |
#829 | Peno Creek | Bowling Green, MO | 135.2 GWh |
#830 | Lieberman | Mooringsport, LA | 134.7 GWh |
#832 | New Orleans Power | New Orleans, LA | 133.9 GWh |
#833 | West Marinette | Peshtigo, WI | 133.0 GWh |
#834 | UCONN Cogen Facility | Storrs, CT | 132.6 GWh |
#835 | Energy Shelby County | Neoga, IL | 132.1 GWh |
#836 | Comanche (CO) | Pueblo, CO | 7.2 TWh |
#837 | Mark One Power Station | Angleton, TX | 131.5 GWh |
#838 | South Plant | Colorado Springs, CO | 135.8 GWh |
#839 | Basin Creek Plant | Butte, MT | 130.7 GWh |
#840 | Enterprise Products Operating | Mont Belvieu, TX | 130.4 GWh |
#841 | Vernon Boulevard | Long Island City, NY | 129.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Marshall Energy Facility.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Barkley | Kuttawa, KY | 691.2 GWh | 9.6 mi |
Bi-County Gas Producers | Woodlawn, TN | 14.0 GWh | 57.9 mi |
Calvert City | Calvert City, KY | 227.9 GWh | 2.7 mi |
Cape Girardeau Renewable Energy Center | Cape Girardeau, MO | 898.0 MWh | 65.4 mi |
Clendenin A Community Solar, LLC CSG | Herrin, IL | 4.5 GWh | 64.8 mi |
Cumberland (TN) | Cumberland City, TN | 9.6 TWh | 60.3 mi |
Gleason Generating Facility | Gleason, TN | 164.2 GWh | 55.4 mi |
Hurricane Creek CSG | Carterville, IL | 1.5 GWh | 63.9 mi |
John A Logan College Solar | Carterville, IL | 2.7 GWh | 62.6 mi |
Kentucky Dam | Grand Rivers, KY | 1.3 TWh | 7.1 mi |
Lukuc B Community Solar LLC CSG | Herrin, IL | 4.3 GWh | 66.1 mi |
Marion | Marion, IL | 779.6 GWh | 51 mi |
OETN1 | Obion, TN | 216.6 GWh | 55.3 mi |
PPS Power Plant No 1 | Paducah, KY | 74.1 GWh | 12.1 mi |
R D Green | Robards, KY | 217.9 GWh | 65.1 mi |
SABIC Innovative Plastics Mt. Vernon | Mount Vernon, IN | 560.0 GWh | 66.1 mi |
Shawnee | West Paducah, KY | 5.4 TWh | 22.6 mi |
SIUC | Carbondale, IL | 6.9 GWh | 65.2 mi |
Smithland Hydroelectric Plant | Smithland, KY | 467.3 GWh | 9.8 mi |
SR Paris | Paris, TN | 7.0 MWh | 40.4 mi |