Mark One Power Station
24420 CR 48, Angleton, TX 77515Plant Summary Information
Mark One Power Station is ranked #113 out of 304 natural gas power plants in Texas in terms of total annual net electricity generation.
Mark One Power Station is comprised of 6 generators and generated 35.4 GWh during the 3-month period between November 2024 to February 2025.
Plant Name | Mark One Power Station |
---|---|
Utility Name | ProEnergy Services |
Location | Brazoria County, TX |
Initial Operation Date | November 2022 |
Last Update | Feb 2025 |
Annual Generation | 335.1 GWh |
Annual Consumption | 3.5 M MMBtu |
Ranked #1,749 out of 11,993 Power Plants Nationwide | |
Ranked #623 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #332 out of 777 Texas Power Plants | |
Ranked #113 out of 304 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Mark One Power Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mark One Power Station.
Monthly Net Generation for Mark One Power Station
Mark One Power Station Details
Summary Information | |
---|---|
Plant Name | Mark One Power Station (65372) |
Plant Address | 24420 CR 48, Angleton, TX 77515 |
Utility | ProEnergy Services (63082) |
Latitude, Longitude | 29.22711, -95.43076 |
Generation Dates on File | Oct 2022 to Feb 2025 |
Initial Operation Date | November 2022 |
Annual Generation | 335.1 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG21-235-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | KINDER MORGAN TEJAS PIPELINE LLC |
Natural Gas Storage | No |
Generator CTG-1 Details Operating November 2022
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | AE_BCH01 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.6 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CTG-2 Details Operating November 2022
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | AE_BCH01 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.6 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CTG-3 Details Operating November 2022
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | AE_BCH01 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.6 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CTG-4 Details Operating November 2022
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | AE BCH01 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.6 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CTG-5 Details Operating November 2022
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | AE BCH01 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.6 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CTG-6 Details Operating November 2022
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | AE BCH01 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.6 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Mark One Power Station Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Mark One Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-1 | 100.00% |
Mark One Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-2 | 100.00% |
Mark One Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-3 | 100.00% |
Mark One Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-4 | 100.00% |
Mark One Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-5 | 100.00% |
Mark One Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-6 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#613 | Remington | Remington, VA | 365.5 GWh |
#614 | Humboldt Bay | Eureka, CA | 356.5 GWh |
#615 | Hal C Weaver Power Plant | Austin, TX | 354.4 GWh |
#616 | West Campus Cogeneration Facility | Madison, WI | 353.0 GWh |
#617 | Aurora | Aurora, IL | 348.1 GWh |
#618 | Permian Basin | Monahans, TX | 344.7 GWh |
#619 | Gadsby | Salt Lake City, UT | 341.1 GWh |
#620 | Selkirk Cogen | Selkirk, NY | 339.2 GWh |
#621 | Medical Area Total Energy Plant | Boston, MA | 338.6 GWh |
#622 | Tolk | Muleshoe, TX | 2.1 TWh |
#624 | Astoria Station | Astoria, SD | 333.9 GWh |
#625 | Gordon Evans Energy Center | Colwich, KS | 333.9 GWh |
#626 | Trinidad (TX) | Trinidad, TX | 330.6 GWh |
#627 | Buchanan Generation LLC | Keen Mountain, VA | 329.2 GWh |
#628 | Sentinel Energy Center, LLC | Desert Hot Springs, CA | 327.5 GWh |
#629 | THUMS | Long Beach, CA | 325.2 GWh |
#630 | Big Sandy Peaker Plant | Kenona, WV | 325.0 GWh |
#631 | RED-Rochester, LLC | Rochester, NY | 322.1 GWh |
#632 | Georgia-Pacific Muskogee | Muskogee, OK | 378.2 GWh |
#633 | Fredonia | Mt Vernon, WA | 319.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mark One Power Station.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ascend Performance Materials Texas Inc. | Alvin, TX | 192.9 GWh | 13.4 mi |
BASF Freeport Works | Feeeport, TX | 588.6 GWh | 15.7 mi |
Braes Bayou Plant | Richmond, TX | 364.5 GWh | 20.9 mi |
Brazoria County Solar Project (Danciger) | Damon, TX | 387.3 GWh | 20.2 mi |
Brazoria West | Damon, TX | 401.6 GWh | 14.2 mi |
Brotman Power Station | Rosharon, TX | 439.1 GWh | 9.5 mi |
Fighting Jays Solar Project | Needville, TX | 275.2 GWh | 21.1 mi |
Freeport Energy | Freeport, TX | 1.8 TWh | 16.4 mi |
Freeport Energy Center | Freeport, TX | 1.0 TWh | 16.6 mi |
Freeport LP Pretreatment Facility | Freeport, TX | 598.3 GWh | 18.7 mi |
Jack Fusco Energy Center | Thompsons, TX | 3.4 TWh | 20.6 mi |
Longbow Solar, LLC | Liverpool, TX | 131.7 GWh | 9.1 mi |
Mckeever | Fresno, TX | 578.0 MWh | 19.7 mi |
Oyster Creek Unit VIII | Freeport, TX | 2.2 TWh | 17.9 mi |
Petra Nova Carbon Capture Cogen | Thompsons, TX | 109.0 GWh | 21.1 mi |
Power Island | Alvin, TX | 879.4 GWh | 14.2 mi |
Praxair | Clute, TX | 364.0 MWh | 15.6 mi |
Second Division Solar | West Columbia, TX | 30.9 GWh | 19.1 mi |
Wagyu | Damon, TX | 201.4 GWh | 13.7 mi |
WAL462 | Alvin, TX | 324.0 MWh | 18.1 mi |