Marine Corps Logistics Base Solar
1000 Radford Street MCLB, Albany, GA 31704Plant Summary Information
Marine Corps Logistics Base Solar is ranked #40 out of 138 solar farms in Georgia in terms of total annual net electricity generation.
Marine Corps Logistics Base Solar generated 16.2 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Marine Corps Logistics Base Solar |
---|---|
Utility Name | Georgia Power Co |
Location | Dougherty County, GA |
Initial Operation Date | February 2018 |
Last Update | Aug 2024 |
Annual Generation | 55.7 GWh |
Annual Consumption | 208.9 k MMBtu |
Ranked #3,740 out of 11,835 Power Plants Nationwide | |
Ranked #743 out of 5,643 Solar Power Plants Nationwide | |
Ranked #97 out of 238 Georgia Power Plants | |
Ranked #40 out of 138 Georgia Solar Power Plants | |
Fuel Types | Solar |
Map of Marine Corps Logistics Base Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Marine Corps Logistics Base Solar.
Monthly Net Generation for Marine Corps Logistics Base Solar
Marine Corps Logistics Base Solar Details
Summary Information | |
---|---|
Plant Name | Marine Corps Logistics Base Solar (59876) |
Plant Address | 1000 Radford Street MCLB, Albany, GA 31704 |
Utility | Georgia Power Co (7140) |
Latitude, Longitude | 31.56073, -84.09326 |
Generation Dates on File | Feb 2018 to Aug 2024 |
Initial Operation Date | February 2018 |
Annual Generation | 55.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Georgia Power Co (7140) GA |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator 1 Details Operating February 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 31 MW |
Summer Capacity | 31.2 MW |
Winter Capacity | 31.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2018 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 185 |
Tilt Angle | 18 |
DC Net Capacity | 43.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Marine Corps Logistics Base Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#733 | SR Bell Buckle | Shelbyville, TN | 57.3 GWh |
#734 | Citizens Imperial Solar | Calipatria, CA | 57.2 GWh |
#735 | Cimarron Solar Facility | Springer, NM | 57.0 GWh |
#736 | Gulf Coast Solar Center I | Valparaiso, FL | 56.9 GWh |
#737 | Sunray 2 | Daggett, CA | 56.7 GWh |
#738 | Webberville Solar Project | Manor, TX | 56.4 GWh |
#739 | Baxley | Baxley, GA | 56.3 GWh |
#740 | Oberon IB | Odessa, TX | 56.3 GWh |
#741 | Kingbird A Solar LLC | Rosamond, CA | 56.2 GWh |
#742 | Bonnie Mine Solar | Bartow, FL | 56.2 GWh |
#744 | AES Waikoloa Solar Hybrid | Waikoloa Village, HI | 56.1 GWh |
#745 | Castle Solar, LLC | Huntington, UT | 55.6 GWh |
#746 | Kingbird B Solar, LLC | Rosamond, CA | 55.6 GWh |
#747 | Apache Solar 1 | Cochise, AZ | 55.3 GWh |
#748 | Fort Gordon Solar Facility | Fort Gordon, GA | 55.0 GWh |
#749 | Adelanto Solar, LLC | Adelanto, CA | 54.9 GWh |
#750 | Orion I Solar Project | Burlington, TX | 54.6 GWh |
#751 | Ripley | La Plata, MD | 54.0 GWh |
#752 | Mountain View Solar | North Las Vegas, NV | 53.8 GWh |
#753 | Axium Modesto Solar | Modesto, CA | 53.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Marine Corps Logistics Base Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Albany Green Energy | Albany, GA | 248.9 GWh | 1.1 mi |
Baconton Power Plant | Baconton, GA | 36.2 GWh | 12 mi |
Camilla Solar Energy Project | Camilla, GA | 364.4 GWh | 21.6 mi |
Camilla Solar Plant | Pelham, GA | 25.2 GWh | 26.1 mi |
Crisp Plant | Warwick, GA | 882.0 MWh | 21.6 mi |
Denver Braswell PV | Moultrie, GA | 2.6 GWh | 25 mi |
Dougherty County Solar, LLC | Albany, GA | 270.3 GWh | 4.4 mi |
Flint River | Albany, GA | 37.4 GWh | 3.9 mi |
Hickory Park Solar Hybrid | Camilla, GA | 432.5 GWh | 20.7 mi |
Inst and Envir Dir Marine Logistics Base | Albany, GA | 3.9 GWh | 2.7 mi |
Lake Blackshear Project | Warwick, GA | 42.9 GWh | 21.7 mi |
McCleskey Cotton | Dawson, GA | 3.7 GWh | 25.1 mi |
MCLB Landfill Gas to Energy | Albany, GA | 3.9 GWh | 1.8 mi |
OE_GA3 | Camilla, GA | 116.0 GWh | 25.4 mi |
Sowega Power | Baconton, GA | 77.2 GWh | 12 mi |
SR DeSoto I, LLC | DeSoto, GA | 308.4 GWh | 22.9 mi |
SR DeSoto II | DeSoto, GA | 113.7 GWh | 21.7 mi |
SR DeSoto III | DeSoto, GA | 99.0 GWh | 21.8 mi |
SR Terrell | Dawson, GA | 172.4 GWh | 26.6 mi |
Terrell Riles Stovall | Dawson, GA | 3.4 GWh | 26 mi |