Main Canal Headworks
Below east end Dry Falls Dam, Coulee City, WA 99115Plant Summary Information
Main Canal Headworks is ranked #36 out of 69 hydroelectric power plants in Washington in terms of total annual net electricity generation.
Main Canal Headworks is comprised of 1 generator and generated 26.5 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Main Canal Headworks |
---|---|
Utility Name | Columbia Basin Hydropower |
Location | Grant County, WA |
Initial Operation Date | January 1987 |
Last Update | Dec 2022 |
Annual Generation | 117.5 GWh |
Annual Consumption | 466.3 k MMBtu |
Ranked #2,943 out of 11,249 Power Plants Nationwide | |
Ranked #306 out of 1,354 Water Power Plants Nationwide | |
Ranked #76 out of 131 Washington Power Plants | |
Ranked #36 out of 69 Washington Water Power Plants | |
Fuel Types | Water |
Previous Operator |
Grand Coulee Project Hydroelectric Auth (2013 to 2014) Columbia Basin Hydropower (2015 to 2022) |
Map of Main Canal Headworks
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Main Canal Headworks.
Monthly Net Generation for Main Canal Headworks
Main Canal Headworks Details
Summary Information | |
---|---|
Plant Name | Main Canal Headworks (56698) |
Plant Address | Below east end Dry Falls Dam Coulee City, WA 99115 |
Utility | Columbia Basin Hydropower (55939) |
Latitude, Longitude | 47.6164, -119.2992 |
Generation Dates on File | Jan 2007 to Dec 2022 |
Initial Operation Date | January 1987 |
Annual Generation | 117.5 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Avista Corporation (AVA) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Irrigation Canal |
Ash Impoundment | No |
Transmission / Distribution Owner | Avista Corp (20169) WA |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator 1 Details Operating January 1987
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Jointly Owned |
Nameplate Capacity | 26.8 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 26.8 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1987 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 1H |
Main Canal Headworks Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Quincy-Columbia Basin Irr Dist | 1720 Central Ave S, P.O. Box 188 Quincy, WA 98848 | 33.33% |
East Columbia Basin Irr Dist | 55 N 8th Ave, Othello, WA 99344 | 33.34% |
South Columbia Basin Irr Dist | 1135 E Hillsboro St # A, Pasco, WA 99301 | 33.33% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#296 | Cushman 1 | Shelton, WA | 124.6 GWh |
#297 | Broken Bow Dam | Broken Bow, OK | 124.5 GWh |
#298 | Watauga | Elizabethton, TN | 123.7 GWh |
#299 | Pit 3 | Burney, CA | 123.1 GWh |
#300 | Cabin Creek | Georgetown, CO | 123.0 GWh |
#301 | Carpenter | Hot Springs, AR | 120.4 GWh |
#302 | Lemolo 2 | Toketee Falls, OR | 119.7 GWh |
#303 | Crystal | Montrose, CO | 119.6 GWh |
#304 | Fort Patrick Henry | Kingsport, TN | 119.0 GWh |
#305 | Castaic | Castaic, CA | 117.6 GWh |
#307 | Skelton | Dayton, ME | 117.2 GWh |
#308 | Pit 1 | Burney, CA | 116.5 GWh |
#309 | Tyee Lake Hydroelectric Facility | Wrangell, AK | 116.5 GWh |
#310 | Dearborn | Great Falls, SC | 116.0 GWh |
#311 | RC Thomas Hydroelectric Project | Livingston, TX | 114.8 GWh |
#312 | Shepaug | Southbury, CT | 114.4 GWh |
#313 | Blewett | Lilesville, NC | 114.4 GWh |
#314 | Big Quinnesec 92 | Iron Mountain, MI | 114.0 GWh |
#315 | Swan Falls | Kuna, ID | 113.4 GWh |
#316 | Lemolo 1 | Idleyld Park, OR | 113.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Main Canal Headworks.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Adams Nielson Solar | Lind, WA | 40.3 GWh | 55.6 mi |
Camas Solar Project | Ellensburg, WA | 1.3 GWh | 72.6 mi |
Chelan | Wenatchee, WA | 465.1 GWh | 36.5 mi |
Chief Joseph | Bridgeport, WA | 9.7 TWh | 30.6 mi |
Grand Coulee | Grand Coulee, WA | 16.3 TWh | 27.9 mi |
Little Falls (WA) | Ford, WA | 229.2 GWh | 65.8 mi |
Long Lake | Ford, WA | 548.0 GWh | 69.6 mi |
PEC Headworks | Moses Lake, WA | 18.4 GWh | 42.1 mi |
Penstemon Solar Project | Ellensburg, WA | 8.4 GWh | 72.6 mi |
Quincy Chute | Quincy, WA | 32.8 GWh | 43.8 mi |
Rattlesnake Flat | Ritzville, WA | 373.0 GWh | 57.9 mi |
Rock Island | Wenatchee, WA | 2.1 TWh | 41.5 mi |
Rocky Reach | Wenatchee, WA | 5.2 TWh | 46.8 mi |
Russell D Smith | Othello, WA | 13.0 GWh | 61.2 mi |
Sagebrush Power Partners | Ellensburg, WA | 280.3 GWh | 72.9 mi |
Summer Falls Power Plant | Coulee City, WA | 442.3 GWh | 7.9 mi |
Vantage Wind Energy LLC | Ellensburg, WA | 268.4 GWh | 61.7 mi |
Wanapum | Beverly, WA | 4.2 TWh | 60.2 mi |
Wells | Pateros, WA | 3.6 TWh | 34.8 mi |
Wild Horse | Ellensburg, WA | 564.1 GWh | 58.4 mi |