Mahoning
3510 E Garfield Road, New Springfield, OH 44443Plant Summary Information
Mahoning is ranked #3 out of 7 landfill gas power plants in Ohio in terms of total annual net electricity generation.
Mahoning is comprised of 5 generators and generated 6.7 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Mahoning |
---|---|
Utility Name | WM Renewable Energy LLC |
Location | Mahoning County, OH |
Initial Operation Date | January 2013 |
Last Update | Dec 2023 |
Annual Generation | 28.9 GWh |
Annual Consumption | 362.4 k MMBtu |
Ranked #4,605 out of 11,852 Power Plants Nationwide | |
Ranked #94 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #66 out of 183 Ohio Power Plants | |
Ranked #3 out of 7 Ohio Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Map of Mahoning
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mahoning.
Monthly Net Generation for Mahoning
Mahoning Details
Summary Information | |
---|---|
Plant Name | Mahoning (57411) |
Plant Address | 3510 E Garfield Road, New Springfield, OH 44443 |
Utility | WM Renewable Energy LLC (54842) |
Latitude, Longitude | 40.91444, -80.58611 |
Generation Dates on File | Jan 2013 to Dec 2023 |
Initial Operation Date | January 2013 |
Annual Generation | 28.9 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Ohio Edison Co (13998) OH |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating January 2013
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | MAHONILF |
RTO ISO Location Designation For Reporting Wholesale Sales Data | MAHONILF |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN2 Details Operating January 2013
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | MAHONILF |
RTO ISO Location Designation For Reporting Wholesale Sales Data | MAHONILF |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN3 Details Operating January 2013
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | MAHONILF |
RTO ISO Location Designation For Reporting Wholesale Sales Data | MAHONILF |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN4 Details Operating January 2013
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | MAHONILF |
RTO ISO Location Designation For Reporting Wholesale Sales Data | MAHONILF |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN5 Details Operating January 2013
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | MAHONILF |
RTO ISO Location Designation For Reporting Wholesale Sales Data | MAHONILF |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Mahoning Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#84 | Amelia | Jetersville, VA | 32.6 GWh |
#85 | Fitchburg Gas Recovery | Westminster, MA | 30.7 GWh |
#86 | Sand Valley Power Station | Collinsville, AL | 30.6 GWh |
#87 | Prairie View I & II LFGTE | Wyatt, IN | 30.5 GWh |
#88 | Suburban Landfill Gas Recovery | Glenford, OH | 30.5 GWh |
#89 | Brevard | Cocoa, FL | 30.4 GWh |
#90 | Pecan Row Landfill To Electric Facility | Valdosta, GA | 30.3 GWh |
#91 | Stanton Energy Center | Orlando, FL | 4.0 TWh |
#92 | Republic Services Renewable Energy, LLC | Las Vegas, NV | 30.0 GWh |
#93 | Ameresco Delaware South | Georgetown, DE | 29.6 GWh |
#95 | Lincoln Landfill | Lincoln, CA | 28.8 GWh |
#96 | Ameresco Keller Canyon | Bay Point, CA | 28.7 GWh |
#97 | Model City Energy Facility | Youngstown, NY | 28.6 GWh |
#98 | Riverview Energy Systems | Riverview, MI | 28.3 GWh |
#99 | Bavarian LFGTE | Walton, KY | 27.9 GWh |
#100 | Sarasota County LFGTE Facility | Nokomis, FL | 27.8 GWh |
#101 | Ameresco Dallas LLC | Dallas, TX | 27.8 GWh |
#102 | Riverbend Landfill | McMinnville, OR | 27.7 GWh |
#103 | Richmond Energy | Henrico, VA | 27.3 GWh |
#104 | Lennon Generating | Lennon, MI | 27.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mahoning.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Beaver Solar LLC | Beaver, PA | 514.0 MWh | 20.6 mi |
Beaver Valley | Shippingport, PA | 15.2 TWh | 21.7 mi |
Beaver Valley Patterson Dam | Beaver Falls, PA | 4.8 GWh | 18.3 mi |
Carroll County Energy | Carrollton, OH | 5.3 TWh | 32.7 mi |
Clean Energy Future-Lordstown, LLC | Lordstown, OH | 6.5 TWh | 21.3 mi |
Clevelandcliffs Warren | Warren, OH | 53.3 GWh | 23.8 mi |
Foxconn Ohio | Warren, OH | 2.0 GWh | 22.4 mi |
Gaucho Solar | Clinton, PA | 16.2 GWh | 31.3 mi |
General Electric Diesel Engine Plant | Grove City, PA | 5.6 GWh | 30.6 mi |
Hickory Run Energy Station | New Castle, PA | 5.7 TWh | 9.8 mi |
KSU Trumbull | Warren, OH | 1.6 GWh | 28.4 mi |
New Castle Plant | West Pittsburg, PA | 898.1 GWh | 11.4 mi |
Niles RTO BTM | Niles, OH | 418.0 MWh | 19.6 mi |
Pine 1 Solar | Hookstown, PA | 623.0 MWh | 21.6 mi |
Pine 2 Solar | Hookstown, PA | 978.0 MWh | 21.5 mi |
Pittsburgh Airport Gas Plant | Coraopolis, PA | 118.4 GWh | 34.4 mi |
Shell Chemical Appalachia LLC | Monaca, PA | 1.5 TWh | 21.3 mi |
South Field Energy | Wellsville, OH | 8.6 TWh | 19.9 mi |
Townsend Hydro | New Brighton, PA | 17.6 GWh | 18.9 mi |
W H Sammis | Stratton, OH | 3.1 TWh | 26.6 mi |