Magnolia Power Plant
352 Highway 4 West, Ashland, MS 38605Plant Summary Information
Magnolia Power Plant is ranked #48 out of 2,255 natural gas power plants nationwide in terms of total annual net electricity generation.
Magnolia Power Plant is comprised of 6 generators and generated 1.8 TWh during the 3-month period between October 2024 to January 2025.
Plant Name | Magnolia Power Plant |
---|---|
Utility Name | Tennessee Valley Authority |
Location | Benton County, MS |
Initial Operation Date | August 2003 |
Last Update | Jan 2025 |
Annual Generation | 6.8 TWh |
Annual Consumption | 52.2 M MMBtu |
Ranked #131 out of 11,979 Power Plants Nationwide | |
Ranked #48 out of 2,255 Natural Gas Power Plants Nationwide | |
Ranked #2 out of 54 Mississippi Power Plants | |
Ranked #1 out of 31 Mississippi Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Magnolia Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Magnolia Power Plant.
Monthly Net Generation for Magnolia Power Plant
Magnolia Power Plant Details
Summary Information | |
---|---|
Plant Name | Magnolia Power Plant (55451) |
Plant Address | 352 Highway 4 West, Ashland, MS 38605 |
Utility | Tennessee Valley Authority (18642) |
Latitude, Longitude | 34.835, -89.2026 |
Generation Dates on File | Jul 2003 to Jan 2025 |
Initial Operation Date | August 2003 |
Annual Generation | 6.8 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 01-33-000 |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Tennessee Valley Authority (TVA) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Wells |
Ash Impoundment | |
Transmission / Distribution Owner | Tennessee Valley Authority (18642) MS |
Grid Voltage | 350.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | TENNESSEE GAS PIPELINE COMPANY |
Natural Gas Storage | No |
Generator CTG1 Details Operating August 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | MCC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 178.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 156 MW |
Winter Capacity | 183 MW |
Minimum Load | 82.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2003 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator CTG2 Details Operating August 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | MCC2 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 178.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 156 MW |
Winter Capacity | 183 MW |
Minimum Load | 82.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2003 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator CTG3 Details Operating August 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | MCC3 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 178.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 156 MW |
Winter Capacity | 183 MW |
Minimum Load | 82.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2003 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator STG1 Details Operating August 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | MCC1 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 156 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 150 MW |
Winter Capacity | 150 MW |
Minimum Load | 67.6 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2003 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator STG2 Details Operating August 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | MCC2 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 156 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 150 MW |
Winter Capacity | 150 MW |
Minimum Load | 67.6 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2003 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator STG3 Details Operating August 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | MCC3 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 156 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 150 MW |
Winter Capacity | 150 MW |
Minimum Load | 67.6 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2003 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Magnolia Power Plant Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#38 | Port Washington Generating Station | Port Washington, WI | 7.4 TWh |
#39 | Belews Creek | Belews Creek, NC | 9.6 TWh |
#40 | Jackson Generation, LLC | Elwood, IL | 7.2 TWh |
#41 | New Covert Generating Facility | Covert, MI | 7.2 TWh |
#42 | Riviera | Riviera Beach, FL | 7.2 TWh |
#43 | Big Bend | Apollo Beach, FL | 7.2 TWh |
#44 | Tenaska Westmoreland Generating Station | Smithton, PA | 7.1 TWh |
#45 | Colorado Bend II | Wharton, TX | 6.9 TWh |
#46 | Turkey Point | Homestead, FL | 21.3 TWh |
#47 | Jack County | Bridgeport, TX | 6.8 TWh |
#49 | Freestone Energy Center | Fairfield, TX | 6.8 TWh |
#50 | Chouteau | Pryor, OK | 6.7 TWh |
#51 | Dania Beach 7 | Ft. Lauderdale, FL | 6.7 TWh |
#52 | Waterford Power, LLC | Waterford, OH | 6.7 TWh |
#53 | Lee Combined Cycle Plant | Goldsboro, NC | 6.6 TWh |
#54 | Cape Canaveral | Cocoa, FL | 6.6 TWh |
#55 | Marcus Hook Energy LP | Marcus Hook, PA | 6.6 TWh |
#56 | CPV Three Rivers Energy Center | Morris, IL | 6.5 TWh |
#57 | Manatee | Parrish, FL | 6.5 TWh |
#58 | Midlothian Energy Facility | Midlothian, TX | 6.5 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Magnolia Power Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Batesville Generation Facility | Batesville, MS | 5.0 TWh | 53.8 mi |
Brownsville Peaking Power | Brownsville, TN | 39.4 GWh | 49 mi |
Haywood Solar | Brownsville, TN | 5.4 GWh | 51.5 mi |
IKEA Memphis 508 | Cordova, TN | 856.0 MWh | 41.7 mi |
Latitude Solar Center | Whiteville, TN | 24.9 GWh | 32.6 mi |
Millington Solar Farm | Millington, TN | 98.6 GWh | 51.3 mi |
Mulberry Farm LLC | Selmer, TN | 25.1 GWh | 40.5 mi |
Packaging Corp of America | Counce, TN | 412.5 GWh | 55 mi |
Providence Solar | Madison, TN | 29.3 GWh | 52.1 mi |
Selmer Farm LLC | Selmer, TN | 24.9 GWh | 42.6 mi |
Selmer I | Selmer, TN | 27.7 GWh | 42.5 mi |
Selmer II | Selmer, TN | 11.0 GWh | 38.9 mi |
Somerville Solar | Somerville, TN | 3.2 GWh | 28.2 mi |
SR Bolivar | Bolivar, TN | 6.5 GWh | 30.9 mi |
Sr Byhalia, LLC | Byhalia, MS | 670.0 MWh | 26.3 mi |
SR Innovation - NIKE PV | Memphis, TN | 3.5 GWh | 53.7 mi |
SR McKellar | Denmark, TN | 137.0 GWh | 53.4 mi |
TVA Southaven Combined Cycle | Southaven, MS | 4.6 TWh | 48.6 mi |
West Tennessee Solar Farm | Stanton, TN | 2.6 GWh | 41 mi |
Wildberry | Moscow, TN | 18.9 GWh | 18.1 mi |