Magic Valley Wind Farm I LLC
12550 Pennington Road, San Perlita, TX 78590Plant Summary Information
Magic Valley Wind Farm I LLC is ranked #136 out of 221 wind farms in Texas in terms of total annual net electricity generation.
Magic Valley Wind Farm I LLC generated 117.0 GWh during the 3-month period between November 2024 to February 2025.
Plant Name | Magic Valley Wind Farm I LLC |
---|---|
Utility Name | RWE Renewables Americas, LLC |
Location | Willacy County, TX |
Initial Operation Date | September 2012 |
Last Update | Feb 2025 |
Annual Generation | 394.8 GWh |
Annual Consumption | 1.4 M MMBtu |
Ranked #1,551 out of 11,993 Power Plants Nationwide | |
Ranked #450 out of 1,361 Wind Power Plants Nationwide | |
Ranked #299 out of 777 Texas Power Plants | |
Ranked #136 out of 221 Texas Wind Power Plants | |
Fuel Types | Wind |
Previous Operators |
E ON Climate Renewables N America LLC (2013 to 2018) RWE Renewables Americas LLC (2019 to 2021) RWE Renewables Americas, LLC (2022 to 2023) |
Map of Magic Valley Wind Farm I LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Magic Valley Wind Farm I LLC.
Monthly Net Generation for Magic Valley Wind Farm I LLC
Magic Valley Wind Farm I LLC Details
Summary Information | |
---|---|
Plant Name | Magic Valley Wind Farm I LLC (57802) |
Plant Address | 12550 Pennington Road, San Perlita, TX 78590 |
Utility | RWE Renewables Americas, LLC (56215) |
Latitude, Longitude | 26.47528, -97.69111 |
Generation Dates on File | May 2012 to Feb 2025 |
Initial Operation Date | September 2012 |
Annual Generation | 394.8 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 12-41 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator MV1 Details Operating September 2012
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | REDFISH_ALL |
RTO ISO Location Designation For Reporting Wholesale Sales Data | REDFISH_ALL |
Nameplate Capacity | 203 MW |
Summer Capacity | 203 MW |
Winter Capacity | 203 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2012 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 112 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 112 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V100-1.8 |
Design Wind Speed | 16.6 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 262.4 |
Magic Valley Wind Farm I LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#440 | Vienna Wind Farm | Marshalltown, IA | 403.3 GWh |
#441 | Timber Road IV | Payne, OH | 399.9 GWh |
#442 | Clearwater Wind II | Miles City, MT | 399.1 GWh |
#443 | Meadow Lake Wind Farm LLC | Lafayette, IN | 399.0 GWh |
#444 | Skookumchuck Wind Facility | Rainier, WA | 398.8 GWh |
#445 | Prairie Rose Wind Farm | Hardwick, MN | 397.5 GWh |
#446 | Pegasus Wind | Reese, MI | 397.1 GWh |
#447 | Willow Creek Wind Power LLC | Newell, SD | 397.0 GWh |
#448 | Rattlesnake Flat | Ritzville, WA | 395.2 GWh |
#449 | McAdoo Wind Energy LLC | McAdoo, TX | 395.1 GWh |
#451 | Callahan Divide Wind Energy Center | Tusocola, TX | 394.7 GWh |
#452 | White Oak Energy LLC | Carlock, IL | 394.3 GWh |
#453 | Voyager Wind I | Mojave, CA | 393.3 GWh |
#454 | Buffalo Ridge II LLC | Elkton, SD | 391.7 GWh |
#455 | Northern Wind | Lake Wilson, MN | 391.5 GWh |
#456 | Panther Creek Wind Farm II | Big Spring, TX | 391.1 GWh |
#457 | Elbow Creek Wind Project LLC | Forsan, TX | 390.7 GWh |
#458 | Chevelon Butte Phase 2 | Winslow, AZ | 390.1 GWh |
#459 | Hopkins Ridge Wind | Dayton, WA | 389.7 GWh |
#460 | Post Rock Wind Power Project, LLC | Ellsworth, KS | 386.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Magic Valley Wind Farm I LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bruennings Breeze Wind Farm | Raymondville, TX | 497.2 GWh | 3.2 mi |
Cameron Wind 1 LLC | Rio Hondo, TX | 346.0 GWh | 23.8 mi |
E. Porte Ct. | Harlingen, TX | 599.0 MWh | 19.6 mi |
El Sauz Ranch Wind, LLC | San Perlita, TX | 154.2 GWh | 6 mi |
Hidalgo Energy Center | Edinburg, TX | 2.1 TWh | 31.4 mi |
La Chalupa, LLC | Rio Hondo, TX | 448.6 GWh | 19.1 mi |
Las Majadas Wind Farm | Santa Monica, TX | 844.5 GWh | 11.8 mi |
Los Vientos Wind 1A | Sebastian, TX | 318.1 GWh | 11.9 mi |
Los Vientos Wind 1B | Sebastian, TX | 222.7 GWh | 8.9 mi |
Nebula Solar | La Feria, TX | 250.2 GWh | 27.4 mi |
Palmas Wind, LLC | Rio Hondo, TX | 322.4 GWh | 17.6 mi |
Raymond Wind Farm, LLC | Lyford, TX | 621.6 GWh | 9.5 mi |
Red Gate Power Plant | Edinburg, TX | 300.5 GWh | 30.1 mi |
Rio Grande Valley Sugar Growers | Santa Rosa, TX | 92.0 MWh | 17.9 mi |
San Roman Wind I, LLC | Los Fresnos, TX | 229.3 GWh | 31 mi |
Santa Rosa | Santa Rosa, TX | 706.0 MWh | 18.8 mi |
Vancourt Solar Interconnections | La Feria, TX | 87.2 GWh | 27.4 mi |
Vaquero | Harlingen, TX | 709.0 MWh | 21.3 mi |
Villa Cavasos | Brownsville, TX | 696.0 MWh | 31.9 mi |
West Raymond Wind Farm LLC | Lyford, TX | 703.0 GWh | 19.9 mi |