110 West 1st, Madison, NE 68748Plant Summary Information
Madison Utilities is ranked #28 out of 44 distillate fuel oil power plants in Nebraska in terms of total annual net electricity generation.
Madison Utilities is comprised of 4 generators and generated 6.5 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Madison Utilities |
---|---|
Utility Name | City of Madison - (NE) |
Location | Madison County, NE |
Initial Operation Date | April 1953 |
Last Update | Dec 2023 |
Annual Generation | 26.0 MWh |
Annual Consumption | 330 MMBtu |
Ranked #11,657 out of 11,835 Power Plants Nationwide | |
Ranked #1,020 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #104 out of 116 Nebraska Power Plants | |
Ranked #28 out of 44 Nebraska Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Map of Madison Utilities
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Madison Utilities.
Monthly Net Generation for Madison Utilities
Madison Utilities Details
Summary Information | |
---|---|
Plant Name | Madison Utilities (7469) |
Plant Address | 110 West 1st, Madison, NE 68748 |
Utility | City of Madison - (NE) (11481) |
Latitude, Longitude | 41.82975, -97.45628 |
Generation Dates on File | Jan 2003 to Dec 2023 |
Initial Operation Date | April 1953 |
Annual Generation | 26.0 MWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | City Water Well |
Ash Impoundment | No |
Transmission / Distribution Owner | City of Madison - (NE) (11481) NE |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | BLACK HILLS ENERGY |
Pipeline Name | Tallgrass Interstate Gas Transmission |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator FM3 Details Operating April 1953
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.9 MW |
Winter Capacity | 0.9 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 1953 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 0.9 MW |
Net Winter Capacity With Natural Gas | 0.9 MW |
Net Summer Capacity With Oil | 0.9 MW |
Net Winter Capacity With Oil | 0.9 MW |
Time To Switch From Gas To Oil | UNK |
Time To Switch From Oil To Gas | UNK |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator FM1 Details Operating December 1959
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 1.7 MW |
Winter Capacity | 1.7 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1959 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 1.7 MW |
Net Winter Capacity With Natural Gas | 1.7 MW |
Net Summer Capacity With Oil | 1.7 MW |
Net Winter Capacity With Oil | 1.7 MW |
Time To Switch From Gas To Oil | UNK |
Time To Switch From Oil To Gas | UNK |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator FM2 Details Operating September 1959
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1959 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 1 MW |
Net Winter Capacity With Natural Gas | 1 MW |
Net Summer Capacity With Oil | 1 MW |
Net Winter Capacity With Oil | 1 MW |
Time To Switch From Gas To Oil | UNK |
Time To Switch From Oil To Gas | UNK |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator FM5 Details Operating March 2006
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2006 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 1 MW |
Net Winter Capacity With Natural Gas | 1 MW |
Net Summer Capacity With Oil | 1 MW |
Net Winter Capacity With Oil | 1 MW |
Time To Switch From Gas To Oil | UNK |
Time To Switch From Oil To Gas | UNK |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Madison Utilities Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1010 | Blewett | Lilesville, NC | 116.1 GWh |
#1011 | Stryker | Stryker, OH | 27.0 MWh |
#1012 | State Farm | Bloomington, IL | 27.0 MWh |
#1013 | Flora Site B | Flora, IL | 27.0 MWh |
#1014 | Anderson Erickson | Des Moines, IA | 27.0 MWh |
#1015 | Brooklyn Hospital Center | Brooklyn, NY | 27.0 MWh |
#1016 | NYP-Hudson Valley Hospital Center | Cortlandt Manor, NY | 26.0 MWh |
#1017 | Trinidad (CO) | Trinidad, CO | 26.0 MWh |
#1018 | Plant Four | Marquette, MI | 26.0 MWh |
#1019 | Thorne Bay Plant | Craig, AK | 26.0 MWh |
#1021 | Hendricks Regional Health | Danville, IN | 26.0 MWh |
#1022 | Gastonia, Tulip Drive | Gastonia, NC | 26.0 MWh |
#1023 | Valley Queen Cheese | Milbank, SD | 26.0 MWh |
#1024 | Greenville Electric Generating Station | Greenville, OH | 68.5 GWh |
#1025 | Clay Center | Clay Center, KS | 193.0 MWh |
#1026 | Indeck Oswego Energy Center | Oswego, NY | 36.3 GWh |
#1027 | Mount Sinai South Nassau Hospital | Oceanside, NY | 24.5 MWh |
#1028 | Salem Electric Department | Salem, VA | 24.0 MWh |
#1029 | Ward WTP | High Point, NC | 24.0 MWh |
#1030 | La Crosse | La Crosse, KS | 24.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Madison Utilities.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Archer Daniels Midland Columbus | Columbus, NE | 316.1 GWh | 29.9 mi |
Columbus | Columbus, NE | 123.8 GWh | 26.1 mi |
Creston Ridge II, LLC | Creston, NE | 24.6 GWh | 11.1 mi |
Creston Ridge Wind Farm | Creston, NE | 26.1 GWh | 11.1 mi |
Cuming County Renewables, LLC | Wisner, NE | 10.0 GWh | 33.3 mi |
Dodge County Solar Hybrid | Scribner, NE | 1.5 GWh | 39.3 mi |
Haystack Wind Project, LLC | Carroll, NE | 827.8 GWh | 32.8 mi |
Laredo Ridge Wind LLC | Petersburg, NE | 240.3 GWh | 29.4 mi |
Monroe (NE) | Monroe, NE | 27.0 GWh | 24.9 mi |
Plum Creek Wind Project (NE) | Winside, NE | 810.2 GWh | 26.3 mi |
Prairie Breeze | Elgin, NE | 765.7 GWh | 33 mi |
Prairie Breeze II | Elgin, NE | 270.4 GWh | 40.3 mi |
Prairie Breeze III | Elgin, NE | 131.3 GWh | 40.3 mi |
Sholes Wind Energy Center | Randolph, NE | 710.9 GWh | 33.6 mi |
South 49th 013445 SCS Norfolk, LLC | Norfolk, NE | 18.2 GWh | 14 mi |
TPW Petersburg | Petersburg, NE | 151.1 GWh | 26.1 mi |
Upstream Wind Energy LLC | Neligh, NE | 798.1 GWh | 35.8 mi |
Wayne IC | Wayne, NE | 45.0 MWh | 35.5 mi |
West Point Municipal | West Point, NE | 139.0 MWh | 38.3 mi |
Wisner | Wisner, NE | 58.0 MWh | 29.9 mi |