13600 Astoria St, Sylmar, CA 91342Plant Summary Information
Maclay Solar Project is ranked #759 out of 799 solar farms in California in terms of total annual net electricity generation.
Maclay Solar Project generated 284.0 MWh during the 3-month period between May 2023 to August 2023.
Plant Name | Maclay Solar Project |
---|---|
Utility Name | Los Angeles Department of Water & Power |
Location | Los Angeles County, CA |
Initial Operation Date | April 2017 |
Last Update | Aug 2023 |
Annual Generation | 901.5 MWh |
Annual Consumption | 3.1 k MMBtu |
Ranked #10,839 out of 11,852 Power Plants Nationwide | |
Ranked #5,424 out of 5,655 Solar Power Plants Nationwide | |
Ranked #1,505 out of 1,570 California Power Plants | |
Ranked #759 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Maclay Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Maclay Solar Project.
Monthly Net Generation for Maclay Solar Project
Maclay Solar Project Details
Summary Information | |
---|---|
Plant Name | Maclay Solar Project (57308) |
Plant Address | 13600 Astoria St, Sylmar, CA 91342 |
Utility | Los Angeles Department of Water & Power (11208) |
Latitude, Longitude | 34.31972, -118.43083 |
Generation Dates on File | Apr 2017 to Aug 2023 |
Initial Operation Date | April 2017 |
Annual Generation | 901.5 MWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Los Angeles Department of Water & Power (11208) CA |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator 1 Details Operating April 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2017 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 10 |
DC Net Capacity | 2.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Maclay Solar Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5414 | Cawelo Water District Solar | Famoso, CA | 927.0 MWh |
#5415 | Tift Bowen | Tifton, GA | 926.0 MWh |
#5416 | NY Ridgeway I CSG | Lyndonville, NY | 924.0 MWh |
#5417 | Stafford Hill Solar Hybrid | Rutland, VT | 923.0 MWh |
#5418 | North Smithfield Solar Power 1 | North Smithfield, RI | 919.0 MWh |
#5419 | Pivot Energy Minnesota Solar 1 | Clinton Falls, MN | 919.0 MWh |
#5420 | Castor Solar | Dustin Acres, CA | 917.0 MWh |
#5421 | Hartz Way | Secaucus, NJ | 917.0 MWh |
#5422 | IGS PCW1 | Rossford, OH | 906.0 MWh |
#5423 | IGS Solar I - EWR5 | Avenel, NJ | 903.0 MWh |
#5425 | Buidling L | Santa Fe Springs, CA | 899.0 MWh |
#5426 | Mariani Packing Vacaville Solar | Vacaville, CA | 891.0 MWh |
#5427 | NEDC Solar Site | Whitinsville, MA | 878.0 MWh |
#5428 | USS Water Fowl Solar LLC CSG | Silver Lake, MN | 875.0 MWh |
#5429 | Bartow Davidson | Cartersville, GA | 869.0 MWh |
#5430 | City of Boulder WWTP | Boulder, CO | 867.0 MWh |
#5431 | Edwards Air Force Base | Edwards, CA | 866.0 MWh |
#5432 | Industry MetroLink PV 1 | Industry, CA | 860.0 MWh |
#5433 | IKEA Memphis 508 | Cordova, TN | 856.0 MWh |
#5434 | Enfield Community Solar | Ithaca, NY | 848.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Maclay Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
20701 Plummer PV, LLC | Chatsworth, CA | 2.4 GWh | 10.3 mi |
8500 Balboa PV, LLC | Northridge, CA | 5.4 GWh | 7.7 mi |
Aerolease | Van Nuys, CA | 1.9 GWh | 9 mi |
ATT Van Nyus | Van Nuys, CA | 7.2 GWh | 8.6 mi |
ATT Ventura Blvd | Sherman Oaks, CA | 7.3 GWh | 11.7 mi |
Berry Placerita Cogen | Santa Clarita, CA | 30.9 GWh | 5.8 mi |
Castaic Lake Phase II | Santa Clara, CA | 7.8 GWh | 9.1 mi |
CFW Solar X LLC - Vaughn | San Fernando, CA | 1.0 GWh | 2.9 mi |
CSU Northridge Plant | Northridge, CA | 819.0 MWh | 7.8 mi |
East Portal Generator | Chatsworth, CA | 4.0 GWh | 11.7 mi |
Foothill | Sylmar, CA | 32.2 GWh | 3.6 mi |
MM Lopez Energy | Lake View Terrace, CA | 26.4 GWh | 3 mi |
Nordhoff Place | Chatsworth, CA | 1.3 GWh | 9.6 mi |
Olive View Medical Center | Sylmar, CA | 11.4 GWh | 0.9 mi |
Prairie | Chatsworth, CA | 2.9 GWh | 10.3 mi |
San Fernando | Sylmar, CA | 17.8 GWh | 3.6 mi |
Sunshine Gas Producers | Sylmar, CA | 116.8 GWh | 5.2 mi |
VA Sepulveda Ambulatory Care Center | North Hills, CA | 4.7 GWh | 5.7 mi |
Valley (CA) | Sun Valley, CA | 1.6 TWh | 5.6 mi |
Xebec 1 | Sun Valley, CA | 2.7 GWh | 7 mi |