Macksburg Wind Project
310 E N St, Macksburg, IA 50155Plant Summary Information
Macksburg Wind Project is ranked #54 out of 123 wind farms in Iowa in terms of total annual net electricity generation.
Macksburg Wind Project generated 98.9 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Macksburg Wind Project |
---|---|
Utility Name | MidAmerican Energy Co |
Location | Madison County, IA |
Initial Operation Date | December 2014 |
Last Update | Dec 2023 |
Annual Generation | 322.3 GWh |
Annual Consumption | 1.2 M MMBtu |
Ranked #1,750 out of 11,835 Power Plants Nationwide | |
Ranked #525 out of 1,343 Wind Power Plants Nationwide | |
Ranked #68 out of 271 Iowa Power Plants | |
Ranked #54 out of 123 Iowa Wind Power Plants | |
Fuel Types | Wind |
Map of Macksburg Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Macksburg Wind Project.
Monthly Net Generation for Macksburg Wind Project
Macksburg Wind Project Details
Summary Information | |
---|---|
Plant Name | Macksburg Wind Project (58885) |
Plant Address | 310 E N St, Macksburg, IA 50155 |
Utility | MidAmerican Energy Co (12341) |
Latitude, Longitude | 41.20917, -94.10361 |
Generation Dates on File | Dec 2014 to Dec 2023 |
Initial Operation Date | December 2014 |
Annual Generation | 322.3 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | MidAmerican Energy Co (12341) IA |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Generator MBWF Details Operating December 2014
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | MEC.MACKSBURG |
RTO ISO Location Designation For Reporting Wholesale Sales Data | MEC.MACKSBURG |
Nameplate Capacity | 119.6 MW |
Summer Capacity | 119.6 MW |
Winter Capacity | 119.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2014 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 51 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 51 |
---|---|
Predominant Turbine Manufacturer | Siemens |
Predominant Turbine Model Number | SWT-2.3-108 |
Design Wind Speed | 16.8 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 262.4 |
Macksburg Wind Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#515 | FPL Energy Vansycle LLC (WA) | Touchet, WA | 331.4 GWh |
#516 | Tuolumne Wind Project | Goldendale, WA | 329.8 GWh |
#517 | Loraine Windpark Project LLC | Loraine, TX | 329.5 GWh |
#518 | Vansycle II Wind Energy Center | Athena, OR | 329.2 GWh |
#519 | Duran Mesa LLC | Duran, NM | 328.5 GWh |
#520 | Prairie Winds ND1 | Minot, ND | 328.2 GWh |
#521 | Benton County Wind Farm | Earl Park, IN | 327.5 GWh |
#522 | Grand Meadow | Dexter, MN | 325.9 GWh |
#523 | Palmas Wind, LLC | Rio Hondo, TX | 324.6 GWh |
#524 | Baffin Wind | Sarita, TX | 323.5 GWh |
#526 | Settlers Trail Wind Farm LLC | Sheldon, IL | 321.4 GWh |
#527 | Penascal Wind Power LLC | Sarita, TX | 320.3 GWh |
#528 | Bennington Wind | Minonk, IL | 319.5 GWh |
#529 | Blue Sky Green Field Wind Project | Fond du Lac, WI | 319.3 GWh |
#530 | Campbell County Wind Farm | Pollock, SD | 318.8 GWh |
#531 | Shady Oaks Wind Farm | Compton, IL | 318.8 GWh |
#532 | Goshen Phase II | Idaho Falls, ID | 316.8 GWh |
#533 | Stoneray Power Partners, LLC | Woodstock, MN | 316.6 GWh |
#534 | Oakfield Wind Project | City of Oakfield, ME | 316.5 GWh |
#535 | Anacacho Wind Farm, LLC | Brackettville, TX | 316.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Macksburg Wind Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Adair Wind Farm | Adair, IA | 518.0 GWh | 32.7 mi |
Arbor Hill Solar | Greenfield, IA | 42.4 GWh | 19.6 mi |
Arbor Hill Wind Farm | Greenfield, IA | 1.1 TWh | 15.8 mi |
Bulldog | Orient, IA | 4.2 GWh | 17.6 mi |
Cumberland Rose | Orient, IA | 4.9 GWh | 17.3 mi |
Downtown Generation Plant | Greenfield, IA | 6.0 MWh | 19.7 mi |
Fontanelle | Fontanelle, IA | 5.2 GWh | 25.8 mi |
Gilliam South | Stuart, IA | 1.0 MWh | 23 mi |
Greenfield Wind | Greenfield, IA | 4.7 GWh | 20.6 mi |
Meadow Ridge | Greenfield, IA | 5.0 GWh | 21.7 mi |
Morning Light Wind Farm | Adair, IA | 351.7 GWh | 29.7 mi |
North Generation Plant | Greenfield, IA | 45.0 MWh | 19.7 mi |
Orient Wind Farm | Orient, IA | 1.8 TWh | 16.3 mi |
Sky Volt | Greenfield, IA | 4.0 GWh | 20.6 mi |
Southern Hills Wind Farm | Creston, IA | 802.8 GWh | 20.1 mi |
Stuart (IA) | Stuart, IA | 1.0 MWh | 23.2 mi |
Summit Lake | Creston, IA | 72.1 GWh | 14.3 mi |
Wind GEM | Stuart, IA | 4.8 GWh | 21.8 mi |
Winterset | Winterset, IA | 115.0 MWh | 10 mi |
Wolverine | Greenfield, IA | 4.0 GWh | 21.8 mi |