MA Blackstone
83 Federal Street, Blackstone, MA 1504Plant Summary Information
MA Blackstone is ranked #371 out of 463 solar farms in Massachusetts in terms of total annual net electricity generation.
MA Blackstone generated 1.1 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | MA Blackstone |
---|---|
Utility Name | Catalyze Blackstone 83 Federal Street Microgrid, LLC |
Location | Worcester County, MA |
Initial Operation Date | July 2022 |
Last Update | Dec 2022 |
Annual Generation | 2.0 GWh |
Annual Consumption | 6.9 k MMBtu |
Ranked #9,486 out of 11,249 Power Plants Nationwide | |
Ranked #4,270 out of 5,158 Solar Power Plants Nationwide | |
Ranked #465 out of 573 Massachusetts Power Plants | |
Ranked #371 out of 463 Massachusetts Solar Power Plants | |
Fuel Types | Solar |
Map of MA Blackstone
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for MA Blackstone.
Monthly Net Generation for MA Blackstone
MA Blackstone Details
Summary Information | |
---|---|
Plant Name | MA Blackstone (66474) |
Plant Address | 83 Federal Street Blackstone, MA 1504 |
Utility | Catalyze Blackstone 83 Federal Street Microgrid, LLC (65504) |
Latitude, Longitude | 42.0265, -71.5285 |
Generation Dates on File | Jul 2022 to Dec 2022 |
Initial Operation Date | July 2022 |
Annual Generation | 2.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Massachusetts Electric Co (11804) MA |
Grid Voltage | 13.80 kV |
Energy Storage | Yes |
Generator 18170 Details Operating July 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 4.2 MW |
Summer Capacity | 4.2 MW |
Winter Capacity | 4.2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 183 |
Tilt Angle | 20 |
DC Net Capacity | 6.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator B8170 Details Operating July 2022
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 3 MW |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 6.4 |
---|---|
Maximum Charge Rate | 2 MW |
Maximum Discharge Rate | 2 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 1 |
Storage Enclosure Type | CS |
Excess Wind And Solar Generation | Yes |
MA Blackstone Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4260 | Sheriff Road | Hyattsville, MD | 2.0 GWh |
#4261 | USS Norelius Solar CSG | North Branch, MN | 2.0 GWh |
#4262 | Marina South | San Pedro, CA | 2.0 GWh |
#4263 | RE-VFO LLC | Visalia, CA | 2.0 GWh |
#4264 | USS Sycamore Solar (CSG) | Sycamore, IL | 2.0 GWh |
#4265 | Capital Hill Solar LLC | Albany, NY | 2.0 GWh |
#4266 | USS Bluff Country Solar CSG | Altura, MN | 2.0 GWh |
#4267 | Stevens Community Solar LLC | Foley, MN | 2.0 GWh |
#4268 | Building F | Santa Fe Springs, CA | 2.0 GWh |
#4269 | Palmer Community Solar LLC CSG | North Branch, MN | 2.0 GWh |
#4271 | Old Cedar Solar Energy Storage | Asheboro, NC | 2.1 GWh |
#4272 | Marigold Community Solar Garden, LLC | Waterville, MN | 2.0 GWh |
#4273 | Dover Dairy | Hanford, CA | 2.0 GWh |
#4274 | Novel Benedix Solar CSG | Mantorville, MN | 2.0 GWh |
#4275 | Broadway 3 - Tucson Phase I | Tucson, AZ | 2.0 GWh |
#4276 | Aerolease | Van Nuys, CA | 2.0 GWh |
#4277 | Lavio Solar | Petaluma, CA | 2.0 GWh |
#4278 | Trexlertown Solar Array North and South | Allentown, PA | 2.0 GWh |
#4279 | USS Brockway Solar CSG | Sartell, MN | 2.0 GWh |
#4280 | Novel Debra Solar LLC CSG | Mantorville, MN | 2.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding MA Blackstone.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ANP Blackstone Energy Project | Blackstone, MA | 2.8 TWh | 2.4 mi |
BJ's Wholesale Club, Inc- Uxbridge | Uxbridge, MA | 996.2 MWh | 3.9 mi |
Blackstone/Tupperware | North Smithfield, RI | 4.1 GWh | 1.2 mi |
Brookside | North Smithfield, RI | 1.6 GWh | 3.9 mi |
BWC Muddy Brook, LLC Hybrid | Mendon, MA | 1.9 GWh | 5 mi |
BWC Wading River One, Two, Three CSG | Mendon, MA | 5.4 GWh | 4.1 mi |
GDIM 1, LLC | North Smithfield, RI | 12.5 GWh | 4.1 mi |
GDIM 2, LLC | North Smithfield, RI | 8.8 GWh | 4.1 mi |
GDIM 3, LLC | North Smithfield, RI | 10.1 GWh | 4.4 mi |
GDIM 4, LLC | North Smithfield, RI | 12.0 GWh | 4.4 mi |
Hurteau Solar Project Hybrid | Uxbridge, MA | 3.3 GWh | 3.3 mi |
Kearsarge Bellingham PV | Bellingham, MA | 5.3 GWh | 4.7 mi |
Kearsarge William Way | Bellingham, MA | 7.6 GWh | 4.3 mi |
Mendon | Mendon, MA | 4.0 GWh | 5.1 mi |
North Smithfield Solar Power 1 | North Smithfield, RI | 1.2 GWh | 4.6 mi |
Palombo B Solar, LLC CSG | Uxbridge, MA | 1.8 GWh | 3.5 mi |
Palombo Solar, LLC CSG | Uxbridge, MA | 3.7 GWh | 3.6 mi |
Thundermist Hydro | Providence, RI | 4.3 GWh | 2 mi |
Town of Uxbridge MA at Commerce Dr | Uxbridge, MA | 2.7 GWh | 4.7 mi |
TPE King Solar Holdings1, LLC (CSG) | North Smithfield, RI | 16.7 GWh | 4.2 mi |