Lundgren Wind Project
2122 250th St, Otho, IA 50569Plant Summary Information
Lundgren Wind Project is ranked #24 out of 272 power plants in Iowa in terms of total annual net electricity generation.
Lundgren Wind Project generated 240.0 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Lundgren Wind Project |
---|---|
Utility Name | MidAmerican Energy Co |
Location | Webster County, IA |
Initial Operation Date | August 2014 |
Last Update | Dec 2023 |
Annual Generation | 805.8 GWh |
Annual Consumption | 3.1 M MMBtu |
Ranked #873 out of 11,852 Power Plants Nationwide | |
Ranked #133 out of 1,345 Wind Power Plants Nationwide | |
Ranked #24 out of 272 Iowa Power Plants | |
Ranked #16 out of 124 Iowa Wind Power Plants | |
Fuel Types | Wind |
Map of Lundgren Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lundgren Wind Project.
Monthly Net Generation for Lundgren Wind Project
Lundgren Wind Project Details
Summary Information | |
---|---|
Plant Name | Lundgren Wind Project (58884) |
Plant Address | 2122 250th St, Otho, IA 50569 |
Utility | MidAmerican Energy Co (12341) |
Latitude, Longitude | 42.33472, -94.17083 |
Generation Dates on File | Aug 2014 to Dec 2023 |
Initial Operation Date | August 2014 |
Annual Generation | 805.8 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | MidAmerican Energy Co (12341) IA |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator LGWF Details Operating August 2014
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | MEC.LUNGREN |
RTO ISO Location Designation For Reporting Wholesale Sales Data | MEC.LUNGREN |
Nameplate Capacity | 251 MW |
Summer Capacity | 250 MW |
Winter Capacity | 250 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2014 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 107 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 107 |
---|---|
Predominant Turbine Manufacturer | Siemens |
Predominant Turbine Model Number | SWT-2.3-108 |
Design Wind Speed | 16.8 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 262.4 |
Lundgren Wind Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#123 | Horse Creek Wind Farm | Weinert, TX | 818.8 GWh |
#124 | Cimarron Bend Wind Project II, LLC | Minneola, KS | 817.7 GWh |
#125 | Burke Wind, LLC | Bowbells, ND | 813.0 GWh |
#126 | Upstream Wind Energy LLC | Neligh, NE | 812.6 GWh |
#127 | Haystack Wind Project, LLC | Carroll, NE | 811.7 GWh |
#128 | Crocker Wind Farm | Conde, SD | 811.3 GWh |
#129 | Golden West Power Partners LLC | Calhan, CO | 810.9 GWh |
#130 | Southern Hills Wind Farm | Creston, IA | 809.5 GWh |
#131 | Sunflower Energy Center, LLC | Peabody, KS | 808.8 GWh |
#132 | Ninnescah Wind Energy, LLC | Cunningham, KS | 806.6 GWh |
#134 | Crowned Ridge Wind II Energy Center | Watertown, SD | 804.3 GWh |
#135 | Cedar Bluff Wind, LLC | Brownwell, KS | 802.5 GWh |
#136 | Freeborn Wind Farm | Glenville, MN | 799.1 GWh |
#137 | Ledyard Windpower, LLC | Lakota, IA | 797.7 GWh |
#138 | Red Dirt Wind Project | Hennessy, OK | 797.0 GWh |
#139 | Heartland Divide II | Audubon, IA | 796.8 GWh |
#140 | Javelina Wind Energy, LLC | Mirando City, TX | 795.5 GWh |
#141 | Sweetland Wind Farm, LLC | St. Lawrence, SD | 793.8 GWh |
#142 | Karankawa Wind LLC | Mathis, TX | 793.2 GWh |
#143 | Bluestem | Beaver, OK | 793.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lundgren Wind Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Beaver Creek Wind | Ogden, IA | 1.4 TWh | 15.7 mi |
Century | Blairsburg, IA | 570.0 GWh | 31.5 mi |
Dayton (IA) | Dayton, IA | 15.0 MWh | 7.3 mi |
Gowrie | Gowrie, IA | 4.0 MWh | 7 mi |
Grand Junction | Grand Junction, IA | 1.0 MWh | 23.4 mi |
Great Pathfinder Wind | Stratford, IA | 790.8 GWh | 17.2 mi |
Hardin Hilltop Wind LLC | Jefferson, IA | 34.7 GWh | 20.1 mi |
Holliday Creek Solar | Fort Dodge, IA | 205.7 GWh | 16.5 mi |
Iowa State University | Ames, IA | 86.0 GWh | 34.5 mi |
Junction Hilltop Wind Farm | Dana, IA | 24.2 GWh | 17.1 mi |
Michelangelo Wind 4 LLC | Ames, IA | 9.3 GWh | 34.5 mi |
Ogden | Ogden, IA | 5.0 MWh | 21.5 mi |
Pocahontas Prairie Wind Farm | Pomeroy, IA | 370.6 GWh | 29.6 mi |
POET Biorefining - Gowrie | Gowrie, IA | 17.9 GWh | 6 mi |
POET Biorefining - Jewell | Jewell, IA | 21.3 GWh | 26 mi |
Pomeroy Wind Farm | Fonda, IA | 967.1 GWh | 34 mi |
Rippey Wind Farm | Grand Junction, IA | 151.1 GWh | 23 mi |
Story City | Story City, IA | 233.0 MWh | 30.9 mi |
Story City Wind Project | Story City, IA | 2.6 GWh | 30.5 mi |
Webster City | Webster City, IA | 2.0 GWh | 20.5 mi |