Lund Hill Solar
538 Middle Rd, Bickleton, WA 99322Plant Summary Information
Lund Hill Solar is ranked #48 out of 134 power plants in Washington in terms of total annual net electricity generation.
Lund Hill Solar generated 126.6 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Lund Hill Solar |
---|---|
Utility Name | Avangrid Renewables LLC |
Location | Klickitat County, WA |
Initial Operation Date | October 2022 |
Last Update | Sep 2024 |
Annual Generation | 349.0 GWh |
Annual Consumption | 1.3 M MMBtu |
Ranked #1,658 out of 11,852 Power Plants Nationwide | |
Ranked #129 out of 5,655 Solar Power Plants Nationwide | |
Ranked #48 out of 134 Washington Power Plants | |
Ranked #1 out of 8 Washington Solar Power Plants | |
Fuel Types | Solar |
Map of Lund Hill Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lund Hill Solar.
Monthly Net Generation for Lund Hill Solar
Lund Hill Solar Details
Summary Information | |
---|---|
Plant Name | Lund Hill Solar (63509) |
Plant Address | 538 Middle Rd, Bickleton, WA 99322 |
Utility | Avangrid Renewables LLC (15399) |
Latitude, Longitude | 45.888, -120.355 |
Generation Dates on File | Oct 2022 to Sep 2024 |
Initial Operation Date | October 2022 |
Annual Generation | 349.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Avangrid Renewables LLC (AVRN) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Bonneville Power Administration (1738) WA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator LHS1 Details Operating October 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 150 MW |
Summer Capacity | 150 MW |
Winter Capacity | 150 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 194 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Lund Hill Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#119 | Wright Solar Park | Los Banos, CA | 354.7 GWh |
#120 | Impact Solar 1 | Deport, TX | 353.3 GWh |
#121 | Victory Pass | Desert Center, CA | 352.9 GWh |
#122 | Calhoun Solar | Battle Creek, MI | 352.3 GWh |
#123 | Oak Ridge Solar | Oak Ridge, LA | 352.2 GWh |
#124 | Aragorn Solar Project | Van Horn, TX | 350.4 GWh |
#125 | Edwards Sanborn E1B | Mojave, CA | 333.6 GWh |
#126 | Skipjack Solar Center | Wayside, VA | 349.3 GWh |
#127 | Camilla Solar Energy Project | Camilla, GA | 349.2 GWh |
#128 | Pike Solar Hybrid | Fountain, CO | 349.1 GWh |
#130 | Copper Mountain Solar 2 | Boulder City, NV | 348.7 GWh |
#131 | Arlington Valley Solar Energy II | Arlington, AZ | 348.5 GWh |
#132 | Bernard Creek Solar | Hungerford, TX | 347.8 GWh |
#133 | Imperial Valley Solar, LLC | Calexico, CA | 346.4 GWh |
#134 | Big Cypress Solar, LLC | Crawfordsville, AR | 342.9 GWh |
#135 | Edwards Sanborn E1A | Mojave, CA | 325.8 GWh |
#136 | Blythe Solar II, LLC | Blythe, CA | 331.9 GWh |
#137 | Big River Solar | Norris City, IL | 334.0 GWh |
#138 | Quitman Solar | Quitman, GA | 330.2 GWh |
#139 | Campo Verde Solar | El Centro, CA | 328.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lund Hill Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arlington Wind Power Project | Arlington, OR | 177.8 GWh | 14 mi |
Big Horn Wind II | Bickleton, WA | 108.9 GWh | 3.3 mi |
Big Horn Wind Project | Bickelton, WA | 475.9 GWh | 3.1 mi |
Biglow Canyon Wind Farm | Wasco, OR | 949.7 GWh | 20.1 mi |
Goodnoe Hills | Goldendale, WA | 223.9 GWh | 10.9 mi |
Harvest Wind Project | Roosevelt, WA | 216.8 GWh | 5.2 mi |
John Day | Rufus, OR | 6.9 TWh | 20.2 mi |
Juniper Canyon I Wind Project | Bickleton, WA | 255.0 GWh | 6.2 mi |
Klondike Windpower III | Wasco, OR | 692.4 GWh | 22.2 mi |
Leaning Juniper | Arlington, OR | 254.7 GWh | 17.7 mi |
Leaning Juniper Wind Power II | Arlington, OR | 378.1 GWh | 17 mi |
Linden Wind Energy Project | Goldendale, WA | 116.7 GWh | 22.9 mi |
North Hurlburt Wind LLC | Arlington, OR | 577.6 GWh | 17 mi |
PaTu Wind Farm LLC | Wasco, OR | 25.5 GWh | 22.8 mi |
Pebble Springs Wind LLC | Wasco, OR | 190.5 GWh | 16.5 mi |
South Hurlburt Wind LLC | Arlington, OR | 579.2 GWh | 18.3 mi |
Tuolumne Wind Project | Goldendale, WA | 329.8 GWh | 21.8 mi |
Waste Management Columbia Ridge LFGTE | Arlington, OR | 79.7 GWh | 21.9 mi |
Wheat Field Wind Power Project | Arlington, OR | 190.8 GWh | 14.8 mi |
White Creek Wind Farm | Roosevelt, WA | 446.8 GWh | 5.1 mi |