Lowndes IDA
5698 Hunt Rd, Valdosta, GA 31606Plant Summary Information
Lowndes IDA is ranked #106 out of 139 solar farms in Georgia in terms of total annual net electricity generation.
Lowndes IDA generated 617.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Lowndes IDA |
---|---|
Utility Name | Safari Energy, LLC |
Location | Lowndes County, GA |
Initial Operation Date | April 2020 |
Last Update | Dec 2023 |
Annual Generation | 2.9 GWh |
Annual Consumption | 10.6 k MMBtu |
Ranked #9,062 out of 11,852 Power Plants Nationwide | |
Ranked #3,912 out of 5,655 Solar Power Plants Nationwide | |
Ranked #193 out of 239 Georgia Power Plants | |
Ranked #106 out of 139 Georgia Solar Power Plants | |
Fuel Types | Solar |
Map of Lowndes IDA
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lowndes IDA.
Monthly Net Generation for Lowndes IDA
Lowndes IDA Details
Summary Information | |
---|---|
Plant Name | Lowndes IDA (64278) |
Plant Address | 5698 Hunt Rd, Valdosta, GA 31606 |
Utility | Safari Energy, LLC (63640) |
Latitude, Longitude | 30.83545, -83.22752 |
Generation Dates on File | Apr 2020 to Dec 2023 |
Initial Operation Date | April 2020 |
Annual Generation | 2.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF20-493-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Georgia Power Co (7140) GA |
Grid Voltage | 0.60 kV |
Energy Storage | No |
Generator LIDA Details Operating April 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 55 |
DC Net Capacity | 2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Lowndes IDA Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Lowndes County GA S1, LLC | 1407 Broadway, 24th Floor, New York, NY 10018 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3902 | Mesa CSG 2 Massicotte | Palisade, CO | 3.0 GWh |
#3903 | Finger Lakes Solar I | Geneva, NY | 3.0 GWh |
#3904 | Mtn. Solar 3 CSG | Brush, CO | 3.0 GWh |
#3905 | Lockheed Martin Solar | Orlando, FL | 3.0 GWh |
#3906 | Hadley 2 Solar, LLC CSG | Hadley, MA | 3.0 GWh |
#3907 | Mattas Farms | Amsterdam, NY | 3.0 GWh |
#3908 | Manheim New Jersey | Bordentown, NJ | 2.9 GWh |
#3909 | Mendota | Mendota, IL | 2.9 GWh |
#3910 | Rockland Solar CSG | Rockland, MA | 2.9 GWh |
#3911 | Minke Solar | Molalla, OR | 2.9 GWh |
#3913 | Sandy River Solar (CSG) | Sandy, OR | 2.9 GWh |
#3914 | Muscogee Public Works | Columbus, GA | 2.9 GWh |
#3915 | CJ Solar I, LLC | Lisbon, NY | 2.9 GWh |
#3916 | Amsterdam North | Amsterdam, NY | 2.9 GWh |
#3917 | Dickinson Solar Array | Buffalo, MN | 2.9 GWh |
#3918 | Spruce - WCMD - Rubble I | Williamsport, MD | 2.9 GWh |
#3919 | Walden NY 1 | Walden, NY | 2.9 GWh |
#3920 | 9150 Hermosa Solar GM | Rancho Cucamonga, CA | 2.9 GWh |
#3921 | Troup RC50 II | Pine Mountain, GA | 2.9 GWh |
#3922 | Beverly | Beverly, MA | 2.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lowndes IDA.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Echo River Solar | Live Oak, FL | 152.5 GWh | 43.1 mi |
Hamilton Solar Power Plant | Jasper, FL | 148.6 GWh | 27.1 mi |
Lakeland Solar Energy LLC | Lakeland, GA | 3.5 GWh | 16.7 mi |
Lowndes Cowart | Valdosta, GA | 1.1 GWh | 2.5 mi |
Lowndes Tycor Farms | Lake Park, GA | 4.8 GWh | 10.8 mi |
Moody Air Force Base Solar | Valdosta, GA | 72.2 GWh | 8.4 mi |
PCA-Valdosta Mill | Valdosta, GA | 306.6 GWh | 10.7 mi |
Pecan Row Landfill To Electric Facility | Valdosta, GA | 30.3 GWh | 8.1 mi |
Quitman II Solar | Quitman, GA | 311.0 GWh | 25.2 mi |
Quitman Solar | Quitman, GA | 330.2 GWh | 24.7 mi |
SR Odom | Moultrie, GA | 47.4 GWh | 27.2 mi |
Suwannee River | Live Oak, FL | 42.3 GWh | 31.8 mi |
Suwannee Solar Facility | Live Oak, FL | 16.7 GWh | 31.9 mi |
Swift Creek Chemical Complex | White Springs, FL | 71.9 GWh | 34.2 mi |
Twin Rivers Solar Power Plant | Jasper, FL | 151.8 GWh | 29.8 mi |
Valdosta | Valdosta, GA | 1.5 GWh | 1.8 mi |
Valdosta Prison | Valdosta, GA | 1.8 GWh | 6.2 mi |
Valdosta Water Treatment Plant | Valdosta, GA | 42.0 MWh | 5.6 mi |
Vidalia Water Treatment Plant | Hahira, GA | 1.4 GWh | 17.8 mi |
Winquepin Renewable Energy Center | Lee, FL | 74.8 GWh | 38.4 mi |