Lower Snake River Wind Energy Project
39 Falling Springs Rd, Pomeroy, WA 99347Plant Summary Information
Lower Snake River Wind Energy Project is ranked #24 out of 135 power plants in Washington in terms of total annual net electricity generation.
Lower Snake River Wind Energy Project generated 126.7 GWh during the 3-month period between November 2024 to February 2025.
Plant Name | Lower Snake River Wind Energy Project |
---|---|
Utility Name | Puget Sound Energy Inc |
Location | Garfield County, WA |
Initial Operation Date | February 2012 |
Last Update | Feb 2025 |
Annual Generation | 825.2 GWh |
Annual Consumption | 3.0 M MMBtu |
Ranked #862 out of 11,993 Power Plants Nationwide | |
Ranked #133 out of 1,361 Wind Power Plants Nationwide | |
Ranked #24 out of 135 Washington Power Plants | |
Ranked #1 out of 23 Washington Wind Power Plants | |
Fuel Types | Wind |
Map of Lower Snake River Wind Energy Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lower Snake River Wind Energy Project.
Monthly Net Generation for Lower Snake River Wind Energy Project
Lower Snake River Wind Energy Project Details
Summary Information | |
---|---|
Plant Name | Lower Snake River Wind Energy Project (57195) |
Plant Address | 39 Falling Springs Rd, Pomeroy, WA 99347 |
Utility | Puget Sound Energy Inc (15500) |
Latitude, Longitude | 46.52417, -117.82167 |
Generation Dates on File | Feb 2012 to Feb 2025 |
Initial Operation Date | February 2012 |
Annual Generation | 825.2 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Bonneville Power Administration (BPAT) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Bonneville Power Administration (1738) WA |
Grid Voltage | 500.00 kV |
Energy Storage | No |
Generator LSR 1 Details Operating February 2012
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 342.7 MW |
Summer Capacity | 342.7 MW |
Winter Capacity | 342.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 2012 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 149 |
Turbine Details | |
Number Of Turbines | 149 |
---|---|
Predominant Turbine Manufacturer | Siemens |
Predominant Turbine Model Number | SWT-2.3-101 |
Design Wind Speed | 15.6 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262.4 |
Lower Snake River Wind Energy Project Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#123 | Shamrock Wind | TBD, TX | 852.7 GWh |
#124 | Cimarron Bend Wind Project I, LLC | Minneola, KS | 851.2 GWh |
#125 | Blazing Star Wind Farm 1 | Hendricks, MN | 850.4 GWh |
#126 | Colbeck's Corner, LLC | Groom, TX | 845.7 GWh |
#127 | Las Majadas Wind Farm | Santa Monica, TX | 844.5 GWh |
#128 | Heartland Divide II | Audubon, IA | 842.5 GWh |
#129 | O'Brien Wind | Primghar, IA | 834.6 GWh |
#130 | Crocker Wind Farm | Conde, SD | 831.5 GWh |
#131 | Burke Wind, LLC | Bowbells, ND | 828.6 GWh |
#132 | Javelina Wind Energy, LLC | Mirando City, TX | 827.8 GWh |
#134 | Miami Wind Energy Center | Miami, TX | 824.9 GWh |
#135 | Whispering Willow North | Latimer, IA | 823.3 GWh |
#136 | Niyol Wind, LLC | Fleming, CO | 822.5 GWh |
#137 | Great Pathfinder Wind | Stratford, IA | 821.9 GWh |
#138 | Horse Creek Wind Farm | Weinert, TX | 818.8 GWh |
#139 | Nobles Wind Project | Reading, MN | 818.5 GWh |
#140 | Kingman Wind | Cunningham, KS | 806.3 GWh |
#141 | Lundgren Wind Project | Otho, IA | 805.8 GWh |
#142 | Kingfisher Wind LLC | Kingfisher, OK | 804.1 GWh |
#143 | Plymouth Wind | Remsen, IA | 803.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lower Snake River Wind Energy Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Adams Nielson Solar | Lind, WA | 42.7 GWh | 48.2 mi |
Chopin Wind LLC | Milton-Freewater, OR | 25.6 GWh | 54.1 mi |
Clearwater Paper IPP Lewiston | Lewiston, ID | 387.4 GWh | 40.8 mi |
Combine Hills I | Milton-Freewater, OR | 73.3 GWh | 54.4 mi |
Eurus Combine Hills Turbine Ranch 2 | Milton Freewater, OR | 146.1 GWh | 54.4 mi |
FPL Energy Vansycle LLC (OR) | Touchet, OR | 230.3 GWh | 59.2 mi |
Grimes Way | Pullman, WA | 62.0 MWh | 34.8 mi |
Hopkins Ridge Wind | Dayton, WA | 389.7 GWh | 7.1 mi |
Ice Harbor | Burbank, WA | 1.4 TWh | 53.9 mi |
Little Goose | Dayton, WA | 1.4 TWh | 10.6 mi |
Lower Granite | Pomeroy, WA | 1.3 TWh | 20.8 mi |
Lower Monumental | Kahlotus, WA | 1.3 TWh | 34.2 mi |
Marengo Wind Plant | Dayton, WA | 560.6 GWh | 10.5 mi |
Palouse | Oakesdale, WA | 294.9 GWh | 48.7 mi |
Rattlesnake Flat | Ritzville, WA | 395.2 GWh | 45.6 mi |
Schumann Wind Farm | Milton-Freewater, OR | 22.2 GWh | 53.5 mi |
Tucannon River Wind Farm | Dayton, WA | 678.5 GWh | 12.1 mi |
Twin Reservoirs | Walla Walla, WA | 8.1 GWh | 36.5 mi |
Vansycle | Touchet, OR | 61.7 GWh | 57.1 mi |
Vansycle II Wind Energy Center | Athena, OR | 329.2 GWh | 56.7 mi |