Los Vientos Windpower III
200 FM 490, Rio Grande City, TX 78582Plant Summary Information
Los Vientos Windpower III is ranked #113 out of 221 wind farms in Texas in terms of total annual net electricity generation.
Los Vientos Windpower III generated 100.7 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | Los Vientos Windpower III |
---|---|
Utility Name | Duke Energy Renewables Services |
Location | Starr County, TX |
Initial Operation Date | April 2015 |
Last Update | Jan 2025 |
Annual Generation | 475.5 GWh |
Annual Consumption | 1.8 M MMBtu |
Ranked #1,347 out of 11,979 Power Plants Nationwide | |
Ranked #372 out of 1,359 Wind Power Plants Nationwide | |
Ranked #255 out of 774 Texas Power Plants | |
Ranked #113 out of 221 Texas Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Los Vientos Windpower III, LLC (2013 to 2021) Duke Energy Renewables Services (2022 to 2023) |
Map of Los Vientos Windpower III
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Los Vientos Windpower III.
Monthly Net Generation for Los Vientos Windpower III
Los Vientos Windpower III Details
Summary Information | |
---|---|
Plant Name | Los Vientos Windpower III (59320) |
Plant Address | 200 FM 490, Rio Grande City, TX 78582 |
Utility | Duke Energy Renewables Services (65411) |
Latitude, Longitude | 26.38861, -98.80611 |
Generation Dates on File | Apr 2015 to Jan 2025 |
Initial Operation Date | April 2015 |
Annual Generation | 475.5 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating April 2015
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | ERCOT |
Nameplate Capacity | 200 MW |
Summer Capacity | 200 MW |
Winter Capacity | 200 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 100 |
Turbine Details | |
Number Of Turbines | 100 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V110-2.0 |
Design Wind Speed | 17.8 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 272 |
Los Vientos Windpower III Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Los Vientos Windpower III, LLC | 550 S. Caldwell Street, NAS09, Suite 925, Charlotte, NC 28202 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#362 | Ranchland Wind Project II | Cisco, TX | 496.1 GWh |
#363 | Blue Summit Wind LLC | Vernon, TX | 492.6 GWh |
#364 | Walleye Wind | Beaver Creek, MN | 491.6 GWh |
#365 | Goldthwaite Wind Energy Facility | Goldthwaite, TX | 490.1 GWh |
#366 | Roadrunner Wind Farm | Cisco, TX | 488.9 GWh |
#367 | Ford County Wind Farm LLC | Ford County, IL | 488.6 GWh |
#368 | Thunder Spirit Wind, LLC | Hettinger, ND | 487.7 GWh |
#369 | Big Horn Wind Project | Bickelton, WA | 483.8 GWh |
#370 | Ensign Wind LLC | Montezuma, KS | 483.0 GWh |
#371 | Bingham Wind | Bingham, ME | 475.6 GWh |
#373 | Cimarron Windpower II | Cimarron, KS | 475.5 GWh |
#374 | Otter Creek Wind Farm LLC | Ransom, IL | 474.6 GWh |
#375 | Shannon Wind | Windhorst, TX | 474.2 GWh |
#376 | Buffalo Ridge Wind | Lake Benton, MN | 470.1 GWh |
#377 | Mesteno | Rio Grande City, TX | 468.8 GWh |
#378 | Manzana Wind LLC | Rosamond, CA | 468.5 GWh |
#379 | White Rock East Wind Project | Anadarko, OK | 467.2 GWh |
#380 | Seven Mile Hill | Medicine Bow, WY | 463.2 GWh |
#381 | Senate Wind LLC | Bryson, TX | 463.1 GWh |
#382 | Cimarron Wind Energy LLC | Cimmaron, KS | 462.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Los Vientos Windpower III.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Citrus City | Mission, TX | 645.0 MWh | 28.5 mi |
Falcon Dam & Power | Falcon Heights, TX | 30.6 GWh | 25 mi |
Frontera Energy Center | Mission, TX | 2.4 TWh | 28.1 mi |
HEB00038 | San Juan, TX | 241.0 MWh | 41.8 mi |
Hidalgo Energy Center | Edinburg, TX | 2.1 TWh | 39.2 mi |
Hidalgo Wind Farm II | Edinburg, TX | 136.9 GWh | 23.3 mi |
Hidalgo Wind Farm LLC | McCook, TX | 715.8 GWh | 25 mi |
Las Lomas Wind Project | Falcon, TX | 522.6 GWh | 26.4 mi |
Los Vientos V Wind Power | Rio Grande City, TX | 334.6 GWh | 14.6 mi |
Los Vientos Windpower IV | Rio Grande City, TX | 453.9 GWh | 0.9 mi |
Magic Valley Generating Station | Edinburg, TX | 2.1 TWh | 38.3 mi |
Mesteno | Rio Grande City, TX | 468.8 GWh | 10.1 mi |
Red Gate Power Plant | Edinburg, TX | 285.8 GWh | 39.1 mi |
Ridge Rd | Alamo, TX | 684.0 MWh | 46.4 mi |
Rio Bravo Windpower, LLC | Roma, TX | 408.6 GWh | 23 mi |
Starr Solar Ranch | Roma, TX | 30.9 GWh | 16 mi |
WAL3320 | Palmhurst, TX | 368.0 MWh | 31.6 mi |
WAL3886 | Edinburg, TX | 372.0 MWh | 38.2 mi |
WAL452 | Mcallen, TX | 368.0 MWh | 36.2 mi |
WAL5165 | Alamo, TX | 391.0 MWh | 44.1 mi |