Los Vientos Wind 1B
4545 FM 507, Sebastian, TX 78594Plant Summary Information
Los Vientos Wind 1B is ranked #189 out of 218 wind farms in Texas in terms of total annual net electricity generation.
Los Vientos Wind 1B generated 43.1 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Los Vientos Wind 1B |
---|---|
Utility Name | Duke Energy Renewables Services |
Location | Cameron County, TX |
Initial Operation Date | December 2012 |
Last Update | Oct 2024 |
Annual Generation | 178.6 GWh |
Annual Consumption | 655.7 k MMBtu |
Ranked #2,457 out of 11,866 Power Plants Nationwide | |
Ranked #747 out of 1,345 Wind Power Plants Nationwide | |
Ranked #411 out of 758 Texas Power Plants | |
Ranked #189 out of 218 Texas Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Los Vientos Wind 1B, LLC (2013 to 2021) Duke Energy Renewables Services (2022 to 2023) |
Map of Los Vientos Wind 1B
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Los Vientos Wind 1B.
Monthly Net Generation for Los Vientos Wind 1B
Los Vientos Wind 1B Details
Summary Information | |
---|---|
Plant Name | Los Vientos Wind 1B (57752) |
Plant Address | 4545 FM 507, Sebastian, TX 78594 |
Utility | Duke Energy Renewables Services (65411) |
Latitude, Longitude | 26.34892, -97.6668 |
Generation Dates on File | Jan 2013 to Oct 2024 |
Initial Operation Date | December 2012 |
Annual Generation | 178.6 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator 1 Details Operating December 2012
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 201.6 MW |
Summer Capacity | 201.6 MW |
Winter Capacity | 201.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2012 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 84 |
Planned New Prime Mover | WT |
Planned Energy Source | WND |
Planned New Nameplate Capacity | 202 MW |
Planned Repower | December 2025 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 84 |
---|---|
Predominant Turbine Manufacturer | Mitsubishi |
Predominant Turbine Model Number | MWT-102/2.4 |
Design Wind Speed | 14.8 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 272 |
Los Vientos Wind 1B Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#737 | High Sheldon Wind Farm | Strykersville, NY | 184.0 GWh |
#738 | Peak View Wind Farm | Walsenburg, CO | 183.4 GWh |
#739 | Beebe 1A | Ithaca, MI | 182.9 GWh |
#740 | Bison I Wind Energy Center | New Salem, ND | 181.7 GWh |
#741 | Majestic II Wind | Panhandle, TX | 180.7 GWh |
#742 | Perrin Ranch Wind LLC | Williams, AZ | 180.6 GWh |
#743 | Harvest 2 | Elkton, MI | 180.2 GWh |
#744 | FPL Energy Oliver Wind II LLC | Center, ND | 179.9 GWh |
#745 | Cerro Gordo Wind Farm | Union, IA | 179.5 GWh |
#746 | Green Pastures Wind II | Seymour, TX | 178.7 GWh |
#748 | Busch Ranch II Wind Farm | Walsenburg, CO | 178.5 GWh |
#749 | Arlington Wind Power Project | Arlington, OR | 177.8 GWh |
#750 | San Juan Mesa Wind Project LLC | Elida, NM | 176.1 GWh |
#751 | Wethersfield | Gainsville, NY | 176.0 GWh |
#752 | Woodward Mountain I | Girvin, TX | 175.7 GWh |
#753 | Flat Ridge Wind Energy LLC | Isabel, KS | 175.5 GWh |
#754 | Hay Canyon Wind Power LLC | Wasco, OR | 175.4 GWh |
#755 | FPL Energy Burleigh County Wind | Wilton, ND | 175.4 GWh |
#756 | Mountain View IV | North Palm Springs, CA | 175.1 GWh |
#757 | Casa Mesa Wind Energy Center Hybrid | House, NM | 175.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Los Vientos Wind 1B.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bruennings Breeze Wind Farm | Raymondville, TX | 486.9 GWh | 12.1 mi |
Cameron Wind 1 LLC | Rio Hondo, TX | 346.0 GWh | 16.3 mi |
E. Porte Ct. | Harlingen, TX | 599.0 MWh | 10.8 mi |
La Chalupa, LLC | Rio Hondo, TX | 426.2 GWh | 11.8 mi |
Las Majadas Wind Farm | Santa Monica, TX | 825.5 GWh | 7.6 mi |
Los Vientos Wind 1A | Sebastian, TX | 332.4 GWh | 5.2 mi |
Magic Valley Wind Farm I LLC | San Perlita, TX | 363.2 GWh | 8.9 mi |
Nebula Solar | La Feria, TX | 251.6 GWh | 19.7 mi |
Palmas Wind, LLC | Rio Hondo, TX | 314.7 GWh | 11.3 mi |
Raymond Wind Farm, LLC | Lyford, TX | 591.9 GWh | 7.1 mi |
Ridge Rd | Alamo, TX | 684.0 MWh | 29.5 mi |
Rio Grande Valley Sugar Growers | Santa Rosa, TX | 92.0 MWh | 13.6 mi |
San Roman Wind I, LLC | Los Fresnos, TX | 220.1 GWh | 23.6 mi |
Santa Rosa | Santa Rosa, TX | 706.0 MWh | 12.7 mi |
Vancourt Solar Interconnections | La Feria, TX | 86.9 GWh | 19.7 mi |
Vaquero | Harlingen, TX | 709.0 MWh | 12.5 mi |
Villa Cavasos | Brownsville, TX | 696.0 MWh | 23.1 mi |
WAL456 | Brownsville, TX | 374.0 MWh | 27.3 mi |
WAL5165 | Alamo, TX | 391.0 MWh | 30.6 mi |
West Raymond Wind Farm LLC | Lyford, TX | 681.5 GWh | 20.3 mi |