Lorenzo Wind
608 County Road 125, Lorenzo, TX 79343Plant Summary Information
Lorenzo Wind is ranked #147 out of 218 wind farms in Texas in terms of total annual net electricity generation.
Lorenzo Wind generated 74.8 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Lorenzo Wind |
---|---|
Utility Name | Lorenzo Wind, LLC |
Location | Crosby County, TX |
Initial Operation Date | December 2018 |
Last Update | Oct 2024 |
Annual Generation | 356.3 GWh |
Annual Consumption | 1.3 M MMBtu |
Ranked #1,644 out of 11,866 Power Plants Nationwide | |
Ranked #479 out of 1,345 Wind Power Plants Nationwide | |
Ranked #315 out of 758 Texas Power Plants | |
Ranked #147 out of 218 Texas Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Tri Global Energy, LLC (2013 to 2016) Lorenzo Wind, LLC (2017 to 2023) |
Map of Lorenzo Wind
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lorenzo Wind.
Monthly Net Generation for Lorenzo Wind
Lorenzo Wind Details
Summary Information | |
---|---|
Plant Name | Lorenzo Wind (59244) |
Plant Address | 608 County Road 125, Lorenzo, TX 79343 |
Utility | Lorenzo Wind, LLC (61133) |
Latitude, Longitude | 33.69917, -101.52472 |
Generation Dates on File | Sep 2018 to Oct 2024 |
Initial Operation Date | December 2018 |
Annual Generation | 356.3 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 14-480-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southwestern Public Service Co (17718) TX |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator FIBE1 Details Operating December 2018
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 80 MW |
Summer Capacity | 80 MW |
Winter Capacity | 80 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 29 |
Turbine Details | |
Number Of Turbines | 29 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.3-116 |
Design Wind Speed | 19 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 200 |
Lorenzo Wind Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#469 | Rocky Ridge Wind Project | Hobart, OK | 364.4 GWh |
#470 | Bitter Ridge Wind Farm, LLC | Redkey, IN | 364.3 GWh |
#471 | Camp Grove Wind Farm | Wyoming, IL | 363.5 GWh |
#472 | Bluff Point Wind Facility | Portland, IN | 363.3 GWh |
#473 | Magic Valley Wind Farm I LLC | San Perlita, TX | 363.2 GWh |
#474 | Mesquite Creek Wind | Lamesa, TX | 361.4 GWh |
#475 | Alta Wind Energy Center I | Mojave, CA | 361.0 GWh |
#476 | Baldwin Wind LLC | Wilton, ND | 360.4 GWh |
#477 | Buckthorn Wind | Mingus, TX | 360.0 GWh |
#478 | Trimont Area Wind Farm | Trimont, MN | 356.4 GWh |
#480 | Lakefield Wind Project LLC | Lakefield, MN | 356.1 GWh |
#481 | Arbuckle Mountain Wind Farm LLC | Davis, OK | 354.6 GWh |
#482 | Seiling Wind II | Seiling, OK | 353.5 GWh |
#483 | Hackberry Wind Farm | Albany, TX | 352.4 GWh |
#484 | Morning Light Wind Farm | Adair, IA | 351.7 GWh |
#485 | Milford Wind Corridor I LLC | Milford, UT | 350.7 GWh |
#486 | High Lonesome Mesa LLC | Willard, NM | 350.1 GWh |
#487 | Barton Windpower LLC | Kensett, IA | 349.7 GWh |
#488 | Tuscola Bay Wind | Reese, MI | 348.8 GWh |
#489 | Pine River Wind Park | Shepherd, MI | 347.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lorenzo Wind.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Antelope Station | Abernathy, TX | 255.9 GWh | 21.6 mi |
BESSP1, LLC. | Shallowater, TX | 1.2 GWh | 25.6 mi |
Brandon Station | Lubbock, TX | 21.7 GWh | 22.2 mi |
Cotton Plains Wind Farm | Floydada, TX | 195.7 GWh | 31.6 mi |
Elk Station | Abernathy, TX | 934.4 GWh | 21.6 mi |
GE-Lubbock | Lubbock, TX | 24.3 GWh | 31.5 mi |
Hale Community Wind Farm | Plainview, TX | 2.1 TWh | 20.1 mi |
J Robert Massengale | Lubock, TX | 48.1 GWh | 19.3 mi |
Jones | Lubbock, TX | 2.4 TWh | 17.3 mi |
McAdoo Wind Energy LLC | McAdoo, TX | 395.1 GWh | 32.2 mi |
Old Settler Wind | Floydada, TX | 552.2 GWh | 31.6 mi |
Pleasant Hill Wind Energy Project | Lorenzo, TX | 32.0 GWh | 3.6 mi |
Ralls Wind Farm | Ralls, TX | 11.0 GWh | 8.2 mi |
Sage Draw Wind | Wilson, TX | 1.2 TWh | 28.4 mi |
South Plains II | Lockney, TX | 1.0 TWh | 35.4 mi |
South Plains Wind Phase I | Floydada, TX | 610.2 GWh | 28.8 mi |
Tahoka Wind | Tahoka, TX | 1.1 TWh | 38.9 mi |
Ty Cooke | Lubbock, TX | 3.7 GWh | 19.6 mi |
Wake Wind Energy Center | Floydada, TX | 954.0 GWh | 25.9 mi |
Whirlwind Energy Center | Floydada, TX | 83.9 GWh | 37.2 mi |