Longhorn Wind
120 CR 17, Silverton, TX 79201Plant Summary Information
Longhorn Wind is ranked #45 out of 218 wind farms in Texas in terms of total annual net electricity generation.
Longhorn Wind generated 165.0 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Longhorn Wind |
---|---|
Utility Name | Boralex US Operations LLC |
Location | Briscoe County, TX |
Initial Operation Date | May 2015 |
Last Update | Aug 2024 |
Annual Generation | 788.4 GWh |
Annual Consumption | 2.9 M MMBtu |
Ranked #891 out of 11,835 Power Plants Nationwide | |
Ranked #144 out of 1,343 Wind Power Plants Nationwide | |
Ranked #152 out of 749 Texas Power Plants | |
Ranked #45 out of 218 Texas Wind Power Plants | |
Fuel Types | Wind |
Previous Operators |
EDF Renewable Services Inc (2013 to 2013) EDF Renewable Asset Holdings, Inc. (2014 to 2022) Boralex US Operations LLC (2023 to 2023) |
Map of Longhorn Wind
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Longhorn Wind.
Monthly Net Generation for Longhorn Wind
Longhorn Wind Details
Summary Information | |
---|---|
Plant Name | Longhorn Wind (58772) |
Plant Address | 120 CR 17, Silverton, TX 79201 |
Utility | Boralex US Operations LLC (66100) |
Latitude, Longitude | 34.31111, -101.25111 |
Generation Dates on File | May 2015 to Aug 2024 |
Initial Operation Date | May 2015 |
Annual Generation | 788.4 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Sharyland Utilities LP (17008) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating May 2015
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 200 MW |
Summer Capacity | 200 MW |
Winter Capacity | 200 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 100 |
Turbine Details | |
Number Of Turbines | 100 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V100-2.0 |
Design Wind Speed | 19 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262.4 |
Longhorn Wind Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#134 | Cedar Bluff Wind, LLC | Brownwell, KS | 802.5 GWh |
#135 | Freeborn Wind Farm | Glenville, MN | 801.7 GWh |
#136 | Upstream Wind Energy LLC | Neligh, NE | 798.1 GWh |
#137 | Crowned Ridge Wind II Energy Center | Watertown, SD | 796.8 GWh |
#138 | Burke Wind, LLC | Bowbells, ND | 795.2 GWh |
#139 | Heartland Divide II | Audubon, IA | 794.5 GWh |
#140 | Amadeus Wind Farm | Rotan, TX | 790.7 GWh |
#141 | Ledyard Windpower, LLC | Lakota, IA | 790.1 GWh |
#142 | Karankawa Wind LLC | Mathis, TX | 789.9 GWh |
#143 | Crocker Wind Farm | Conde, SD | 788.7 GWh |
#145 | Whispering Willow North | Latimer, IA | 787.7 GWh |
#146 | Trinity Hills | Olney, TX | 786.1 GWh |
#147 | Great Pathfinder Wind | Stratford, IA | 785.6 GWh |
#148 | Bluestem | Beaver, OK | 781.3 GWh |
#149 | Lower Snake River Wind Energy Project | Pomeroy, WA | 780.8 GWh |
#150 | Plymouth Wind | Remsen, IA | 778.1 GWh |
#151 | Kingman Wind | Cunningham, KS | 777.3 GWh |
#152 | Diamond Spring, LLC | Sulphur, OK | 776.3 GWh |
#153 | Limon III Wind LLC | Limon, CO | 770.7 GWh |
#154 | King Plains Wind Project | Garber, OK | 769.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Longhorn Wind.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Antelope Station | Abernathy, TX | 255.9 GWh | 45.8 mi |
Astra Wind Farm | Happy, TX | 593.6 GWh | 55.5 mi |
BESSP1, LLC. | Shallowater, TX | 1.2 GWh | 59.2 mi |
Briscoe Wind Farm | Silverton, TX | 414.6 GWh | 8.4 mi |
Cotton Plains Wind Farm | Floydada, TX | 196.6 GWh | 17.7 mi |
Elk Station | Abernathy, TX | 934.4 GWh | 45.8 mi |
Goodnight | Claude, TX | 334.8 GWh | 54.3 mi |
Hale Community Wind Farm | Plainview, TX | 2.1 TWh | 38.6 mi |
Hecate Energy Frye Solar LLC | Kress, TX | 426.9 GWh | 20.8 mi |
J Robert Massengale | Lubock, TX | 48.1 GWh | 59.4 mi |
Lorenzo Wind | Lorenzo, TX | 355.8 GWh | 45.1 mi |
McAdoo Wind Energy LLC | McAdoo, TX | 395.1 GWh | 41.9 mi |
Old Settler Wind | Floydada, TX | 561.5 GWh | 17.7 mi |
Pleasant Hill Wind Energy Project | Lorenzo, TX | 32.0 GWh | 41.7 mi |
Ralls Wind Farm | Ralls, TX | 11.0 GWh | 45.6 mi |
South Plains II | Lockney, TX | 1.0 TWh | 10.8 mi |
South Plains Wind Phase I | Floydada, TX | 607.1 GWh | 16.5 mi |
UL Advanced Wind Turbine Test Facility | Canyon, TX | 7.9 GWh | 54.5 mi |
Wake Wind Energy Center | Floydada, TX | 954.0 GWh | 34.7 mi |
Whirlwind Energy Center | Floydada, TX | 83.9 GWh | 16.7 mi |