Long Creek Waste Water Plant
3000 Old Spencer Mountain Rd., Dallas, NC 28034Plant Summary Information
Long Creek Waste Water Plant is ranked #23 out of 49 distillate fuel oil power plants in North Carolina in terms of total annual net electricity generation.
Long Creek Waste Water Plant is comprised of 3 generators and generated 222.0 MWh during the 3-month period between June 2024 to September 2024.
Plant Name | Long Creek Waste Water Plant |
---|---|
Utility Name | City of Gastonia |
Location | Gaston County, NC |
Initial Operation Date | January 1995 |
Last Update | Sep 2024 |
Annual Generation | 433.0 MWh |
Annual Consumption | 5.3 k MMBtu |
Ranked #11,077 out of 11,852 Power Plants Nationwide | |
Ranked #532 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #839 out of 863 North Carolina Power Plants | |
Ranked #23 out of 49 North Carolina Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Previous Operator |
Gastonia City of (2013 to 2022) City of Gastonia (2023 to 2023) |
Map of Long Creek Waste Water Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Long Creek Waste Water Plant.
Monthly Net Generation for Long Creek Waste Water Plant
Long Creek Waste Water Plant Details
Summary Information | |
---|---|
Plant Name | Long Creek Waste Water Plant (57630) |
Plant Address | 3000 Old Spencer Mountain Rd., Dallas, NC 28034 |
Utility | City of Gastonia (56960) |
Latitude, Longitude | 35.3119, -81.1414 |
Generation Dates on File | Jan 2011 to Sep 2024 |
Initial Operation Date | January 1995 |
Annual Generation | 433.0 MWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Carolinas (DUK) |
NAICS Code | Sewage Treatment Facilities (22132) |
Sector | Commercial Non-CHP (4) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | City of Gastonia - (NC) (7027) NC |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | Other - See pipeline notes. |
Pipeline Notes | Generator is not connected to natural gas |
Natural Gas Storage | No |
Generator ES1 Details Operating January 1995
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.7 MW |
Winter Capacity | 1.7 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1995 |
Combined Heat & Power | No |
---|---|
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ES2 Details Operating January 1995
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.7 MW |
Winter Capacity | 1.7 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1995 |
Combined Heat & Power | No |
---|---|
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ES3 Details Operating January 1995
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.7 MW |
Winter Capacity | 1.7 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1995 |
Combined Heat & Power | No |
---|---|
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Supercritical Technology | No |
Ultrasupercritical Technology | No |
Other Planned Modifications | No |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Long Creek Waste Water Plant Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#522 | Electric Avenue Facility | Culpeper, VA | 480.0 MWh |
#523 | Front Street | Chicopee, MA | 476.0 MWh |
#524 | Burlington GT | Burlington, VT | 472.0 MWh |
#525 | West Bend | West Bent, IA | 471.0 MWh |
#526 | Carthage | Carthage, MO | 1.7 GWh |
#527 | Gary Court 1 & 2 | Groton, CT | 466.0 MWh |
#528 | Coon Rapids II | Coon Rapids, IA | 451.0 MWh |
#529 | Vienna Operations | Vienna, MD | 2.9 GWh |
#530 | Tesoro Hawaii | Kapolei, HI | 162.7 GWh |
#531 | Meridian | Meridian, MS | 434.0 MWh |
#533 | GCWA | Texas City, TX | 433.0 MWh |
#534 | Indiana University of Pennsylvania | Indiana, PA | 14.5 GWh |
#535 | Godwin Drive Plant | Manassas, VA | 430.0 MWh |
#536 | Lost Nation | Groveton, NH | 428.0 MWh |
#537 | Ponton Diesel Generating Facility | Amelia, VA | 426.0 MWh |
#538 | Henrico | Glen Allen, VA | 7.3 GWh |
#539 | Iowa State University | Ames, IA | 86.0 GWh |
#540 | McWilliams | Gantt, AL | 3.0 TWh |
#541 | Niles RTO BTM | Niles, OH | 418.0 MWh |
#542 | Eielson AFB Central Heat & Power Plant | Eielson AFB, AK | 86.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Long Creek Waste Water Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Auten Road Farm, LLC | Gastonia, NC | 9.6 GWh | 0.5 mi |
Battleground | Kings Mountain, NC | 5.4 GWh | 12.4 mi |
Cowans Ford | Stanley, NC | 136.5 GWh | 13.3 mi |
DE Solar 10240 Old Dowd Rd | Charlotte, NC | 1.4 GWh | 9.4 mi |
DE Solar 1725 Drywall Dr | Mt. Holly, NC | 796.0 MWh | 8.2 mi |
Freemont Solar Center LLC | Stanley, NC | 6.2 GWh | 11.4 mi |
G G Allen | Belmont, NC | 190.0 GWh | 11.2 mi |
Gaston County Renewable Energy Center | Dallas, NC | 21.0 GWh | 5.4 mi |
Gaston Memorial Hospital | Gastonia, NC | 33.0 MWh | 2.6 mi |
Gaston Solar Power Plant | Cherryville Township, NC | 46.9 GWh | 0.8 mi |
Gastonia Solar Center | Gastonia, NC | 8.1 GWh | 6.3 mi |
Gastonia, Tulip Drive | Gastonia, NC | 26.0 MWh | 3.9 mi |
High Shoals Hydro (NC) | High Shoals, NC | 3.3 GWh | 6.6 mi |
High Shoals PV1 | High Shoals, NC | 31.2 GWh | 7.3 mi |
Lincoln Combustion | Stanley, NC | 3.7 GWh | 10.2 mi |
Lincolnton High School | Lincolnton, NC | 21.0 MWh | 13.3 mi |
Mariposa Solar Center LLC | Stanley, NC | 9.1 GWh | 5.3 mi |
Mountain Island | Mount Holly, NC | 99.6 GWh | 8.9 mi |
Reventure Park | Charlotte, NC | 22.4 GWh | 8.1 mi |
York Road Solar I, LLC | Kings Mountain, NC | 3.1 GWh | 12.5 mi |