6250 1475 East St., Tiskilwa, IL 61368Plant Summary Information
Lone Tree Wind, LLC is ranked #39 out of 56 wind farms in Illinois in terms of total annual net electricity generation.
Lone Tree Wind, LLC generated 90.9 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | Lone Tree Wind, LLC |
---|---|
Utility Name | Leeward Asset Management, LLC |
Location | Bureau County, IL |
Initial Operation Date | December 2020 |
Last Update | Jan 2025 |
Annual Generation | 301.0 GWh |
Annual Consumption | 1.1 M MMBtu |
Ranked #1,873 out of 11,979 Power Plants Nationwide | |
Ranked #572 out of 1,359 Wind Power Plants Nationwide | |
Ranked #68 out of 329 Illinois Power Plants | |
Ranked #39 out of 56 Illinois Wind Power Plants | |
Fuel Types | Wind |
Map of Lone Tree Wind, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lone Tree Wind, LLC.
Monthly Net Generation for Lone Tree Wind, LLC
Lone Tree Wind, LLC Details
Summary Information | |
---|---|
Plant Name | Lone Tree Wind, LLC (63251) |
Plant Address | 6250 1475 East St., Tiskilwa, IL 61368 |
Utility | Leeward Asset Management, LLC (50123) |
Latitude, Longitude | 41.20321, -89.60187 |
Generation Dates on File | Dec 2020 to Jan 2025 |
Initial Operation Date | December 2020 |
Annual Generation | 301.0 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Commonwealth Edison Co (4110) IL |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator LTW Details Operating December 2020
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 79 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 79 MW |
Winter Capacity | 79 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 32 |
Turbine Details | |
Number Of Turbines | 32 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.5-127 |
Design Wind Speed | 17.4 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 292 |
Lone Tree Wind, LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#562 | Post Wind Farm LP | Fluvanna, TX | 311.7 GWh |
#563 | Paulding Wind Farm III | Payne, OH | 311.2 GWh |
#564 | Little Elk Wind Project LLC | Cordell, OK | 310.4 GWh |
#565 | Champion Wind Farm LLC | Roscoe, TX | 306.8 GWh |
#566 | Tuscola Wind II LLC | Reese, MI | 305.0 GWh |
#567 | Gray County Wind Energy | Montezuma, KS | 304.3 GWh |
#568 | Bluestone Wind, LLC | Sanford, NY | 303.9 GWh |
#569 | Michigan Wind 2 | Minden City, MI | 303.9 GWh |
#570 | Kossuth County Wind | Lu Verne, IA | 303.3 GWh |
#571 | Alta Wind Energy Center III | Mojave, CA | 302.6 GWh |
#573 | Alta Wind Energy Center II | Mojave, CA | 299.7 GWh |
#574 | Twin Buttes II Wind | Lamar, CO | 299.1 GWh |
#575 | Minco Wind II, LLC | Minco, OK | 296.5 GWh |
#576 | Palouse | Oakesdale, WA | 294.9 GWh |
#577 | Blue Canyon Windpower VI LLC | Carnegie, OK | 294.7 GWh |
#578 | Shiloh IV Wind Project LLC | Birds Landing, CA | 294.4 GWh |
#579 | Dakota Range Wind | SD | 294.3 GWh |
#580 | MinnDakota Wind LLC | Ivanhoe, MN | 294.1 GWh |
#581 | Saratoga Wind Farm | Lime Springs, IA | 292.5 GWh |
#582 | Buffalo Gap 3 Wind Farm | Nolan, TX | 292.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lone Tree Wind, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Agriwind | Tiskilwa, IL | 5.4 GWh | 6.9 mi |
Bennington Wind | Minonk, IL | 313.5 GWh | 31.7 mi |
Big Sky Wind LLC | Ohio, IL | 674.7 GWh | 28.4 mi |
Bishop Hill Energy LLC | Cambridge, IL | 564.1 GWh | 27 mi |
Bishop Hill II Wind Farm | Cambridge, IL | 229.0 GWh | 29.8 mi |
Briscoe 1A | Tonica, IL | 4.0 GWh | 29.6 mi |
Briscoe 2A | Lostant, IL | 3.8 GWh | 29.9 mi |
Camp Grove Wind Farm | Wyoming, IL | 363.5 GWh | 8 mi |
Crescent Ridge | Tiskilwa, IL | 203.8 GWh | 3.6 mi |
DePue Holdings, LLC | DePue, IL | 23.7 GWh | 18.2 mi |
Elba Solar LLC | Williamsfield, IL | 1.6 GWh | 30.8 mi |
Green River Wind Farm | Deer Grove, IL | 557.6 GWh | 28.9 mi |
IL West Hallock Project1 | Edelstein, IL | 4.5 GWh | 19.4 mi |
Midland Wind | Kewane, IL | 330.1 GWh | 24.9 mi |
Peru (IL) | City of Peru, IL | 16.1 GWh | 26.8 mi |
Princeton (IL) | Princeton, IL | 1.0 GWh | 13.9 mi |
Providence Heights Wind LLC | Tiskilwa, IL | 148.1 GWh | 2.9 mi |
Schulte 2 Community Solar | Lacon, IL | 3.7 GWh | 15.6 mi |
SCS Galena 012589 Peoria, LLC | Peoria, IL | 3.7 GWh | 30.3 mi |
Walnut Ridge Wind Farm | Sheffield, IL | 740.7 GWh | 20.3 mi |