Loma Linda University Cogen
11100 Anderson Street, Loma Linda, CA 92350Plant Summary Information
Loma Linda University Cogen is ranked #93 out of 346 natural gas power plants in California in terms of total annual net electricity generation.
Loma Linda University Cogen is comprised of 4 generators and generated 16.7 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Loma Linda University Cogen |
---|---|
Utility Name | Loma Linda University |
Location | San Bernardino County, CA |
Initial Operation Date | February 1980 |
Last Update | Aug 2024 |
Annual Generation | 52.3 GWh |
Annual Consumption | 835.4 k MMBtu |
Ranked #3,807 out of 11,835 Power Plants Nationwide | |
Ranked #1,068 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #451 out of 1,569 California Power Plants | |
Ranked #93 out of 346 California Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Loma Linda University Cogen
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Loma Linda University Cogen.
Monthly Net Generation for Loma Linda University Cogen
Loma Linda University Cogen Details
Summary Information | |
---|---|
Plant Name | Loma Linda University Cogen (10206) |
Plant Address | 11100 Anderson Street, Loma Linda, CA 92350 |
Utility | Loma Linda University (11161) |
Latitude, Longitude | 34.05039, -117.24842 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | February 1980 |
Annual Generation | 52.3 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 88-466-000; 89-44-000 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Educational Services (611) |
Sector | Commercial CHP (5) |
Water Source | Wells |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 66.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | SOUTHERN CALIFORNIA GAS COMPANY |
Natural Gas Storage | No |
Generator GEN4 Details Standby June 1986
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.7 MW |
Winter Capacity | 1.7 MW |
Minimum Load | 0.9 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
---|---|
First Operation Date | June 1986 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator GEN1 Details Operating November 1989
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Unit Code | ST01 |
Ownership | Single Owner |
Nameplate Capacity | 5.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4.8 MW |
Winter Capacity | 4.8 MW |
Minimum Load | 2.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 1989 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 4.8 MW |
Net Winter Capacity With Natural Gas | 4.8 MW |
Net Summer Capacity With Oil | 4 MW |
Net Winter Capacity With Oil | 4 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GEN2 Details Operating November 1989
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Unit Code | ST01 |
Ownership | Single Owner |
Nameplate Capacity | 5.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4.8 MW |
Winter Capacity | 4.8 MW |
Minimum Load | 2.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 1989 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 4.8 MW |
Net Winter Capacity With Natural Gas | 4.8 MW |
Net Summer Capacity With Oil | 4 MW |
Net Winter Capacity With Oil | 4 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GEN5 Details Standby July 2018
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
---|---|
First Operation Date | July 2018 |
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Loma Linda University Cogen Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1058 | Crete Energy Venture LLC | Crete, IL | 54.1 GWh |
#1059 | Domino Sugar Baltimore | Baltimore, MD | 54.2 GWh |
#1060 | Alpaca | Canton Township, PA | 53.7 GWh |
#1061 | Owatonna Energy Station | Owatonna, MN | 53.5 GWh |
#1062 | Sappi Cloquet Mill | Cloquet, MN | 468.8 GWh |
#1063 | Riverside Energy Resource Center | Riverside, CA | 52.6 GWh |
#1064 | Georgia-Pacific Taylorsville Plywood | Taylorsville, MS | 52.6 GWh |
#1065 | Joseph J Seymour Power Project | Brooklyn, NY | 52.5 GWh |
#1066 | Buckeye Florida LP | Perry, FL | 270.5 GWh |
#1067 | S A Carlson | Jamestown, NY | 52.4 GWh |
#1069 | Warren F Sam Beasley Generation Station | Smyrna, DE | 52.9 GWh |
#1070 | Saint Marys Hospital Power Plant | Rochester, MN | 52.2 GWh |
#1071 | Kaukauna Paper Mill | Kaukauna, WI | 122.8 GWh |
#1072 | Inver Hills | Inver Grove Heights, MN | 78.2 GWh |
#1073 | Tesoro Kenai Cogeneration Plant | Kenai, AK | 50.9 GWh |
#1074 | A B Brown | Mount Vernon, IN | 290.3 GWh |
#1075 | St Francisville Mill | St. Francisville, LA | 116.0 GWh |
#1076 | TNSG North Plant | Deadhorse, AK | 50.5 GWh |
#1077 | Hunlock Unit 4 | Hunlock Green, PA | 50.3 GWh |
#1078 | Hoffmann LaRoche | Nutley, NJ | 50.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Loma Linda University Cogen.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Amazon San Bernardino | San Bernardino, CA | 6.0 GWh | 2.6 mi |
Century Generating Facility | Colton, CA | 651.0 MWh | 6 mi |
Colton Solar One, LLC | San Bernardino, CA | 2.3 GWh | 5 mi |
Drews Generating Facility | Colton, CA | 606.0 MWh | 6 mi |
Energy Center | Redlands, CA | 4.7 GWh | 4.9 mi |
IGS KSBD | Highland, CA | 9.0 GWh | 3.9 mi |
IGS SBD2 | San Bernardino, CA | 4.2 GWh | 2.5 mi |
Kohls San Bernardino Solar Facility | San Bernardino, CA | 1.0 GWh | 3.2 mi |
Mountainview Generating Station | Redlands, CA | 2.6 TWh | 2.2 mi |
Redlands Community Hospital | Redlands, CA | 9.1 GWh | 2.6 mi |
RPUWD Scheuer Well Solar Project | San Bernardino, CA | 4.8 GWh | 4.5 mi |
SB Water Reclamation Fuel Cell | San Bernardino, CA | 9.5 GWh | 2.8 mi |
Solar Photovoltaic Project #05 | Redlands, CA | 1.4 GWh | 2.7 mi |
Solar Photovoltaic Project #07 | Redlands, CA | 2.4 GWh | 2.7 mi |
Solar Photovoltaic Project #11 | Redlands, CA | 3.1 GWh | 1.8 mi |
Solar Photovoltaic Project #13 | Redlands, CA | 2.0 GWh | 2.4 mi |
Solar Photovoltaic Project #16 | Redlands, CA | 1.5 GWh | 2.6 mi |
Solar Photovoltaic Project #22 | Redlands, CA | 329.9 MWh | 2.9 mi |
Solar Photovoltaic Project #28 | San Bernardino, CA | 1.9 GWh | 3.4 mi |
Solar Photovoltaic Project #48 | Redlands, CA | 3.5 GWh | 2.4 mi |