Lockhart
420 River Street, Lockhart, SC 29364Plant Summary Information
Lockhart is ranked #12 out of 29 hydroelectric power plants in South Carolina in terms of total annual net electricity generation.
Lockhart is comprised of 5 generators and generated 7.2 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Lockhart |
---|---|
Utility Name | Lockhart Power Co |
Location | Union County, SC |
Initial Operation Date | January 1921 |
Last Update | Dec 2023 |
Annual Generation | 61.7 GWh |
Annual Consumption | 233.3 k MMBtu |
Ranked #3,663 out of 11,852 Power Plants Nationwide | |
Ranked #457 out of 1,371 Water Power Plants Nationwide | |
Ranked #52 out of 190 South Carolina Power Plants | |
Ranked #12 out of 29 South Carolina Water Power Plants | |
Fuel Types | Water |
Map of Lockhart
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lockhart.
Monthly Net Generation for Lockhart
Lockhart Details
Summary Information | |
---|---|
Plant Name | Lockhart (3275) |
Plant Address | 420 River Street, Lockhart, SC 29364 |
Utility | Lockhart Power Co (11118) |
Latitude, Longitude | 34.7792, -81.4561 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | January 1921 |
Annual Generation | 61.7 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Carolinas (DUK) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Broad River |
Ash Impoundment | No |
Transmission / Distribution Owner | Lockhart Power Co (11118) SC |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator 2 Details Operating January 1921
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 4.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4.2 MW |
Winter Capacity | 4.2 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1921 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator HY1 Details Operating January 1921
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 4.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4.2 MW |
Winter Capacity | 4.2 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1921 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator HY3 Details Operating January 1921
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 4.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4.2 MW |
Winter Capacity | 4.2 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1921 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator HY4 Details Operating January 1921
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 4.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4.2 MW |
Winter Capacity | 4.2 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1921 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator HY5 Details Operating January 1921
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.2 MW |
Winter Capacity | 1.2 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1921 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Lockhart Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#447 | Crescent | Crescent, NY | 64.7 GWh |
#448 | Wise | Auburn, CA | 64.6 GWh |
#449 | Johnson 2 | Lexington, NE | 64.6 GWh |
#450 | Woodland Pulp, LLC | Baileyville, ME | 366.6 GWh |
#451 | Fontenelle | Le Barge, WY | 63.7 GWh |
#452 | Deerfield 5 | Florida, MA | 63.1 GWh |
#453 | Foster | Foster, OR | 62.4 GWh |
#454 | Mystic | Fishtail, MT | 62.3 GWh |
#455 | 99 Islands | Blacksburg, SC | 62.1 GWh |
#456 | Snoqualmie | Snoqualmie, WA | 61.9 GWh |
#458 | Flambeau Hydroelectric Station | Ladysmith, WI | 61.4 GWh |
#459 | Terminus Hydroelectric Project | Lemon Cove, CA | 61.3 GWh |
#460 | Blanchard | Royalton, MN | 60.7 GWh |
#461 | Packwood | Packwood, WA | 60.4 GWh |
#462 | Upper Falls | Spokane, WA | 59.9 GWh |
#463 | Browns Falls | Oswegatchie, NY | 59.5 GWh |
#464 | Minidoka | Rupert, ID | 59.4 GWh |
#465 | Little Quinnesec Falls Hydro Project | Niagara, WI | 58.9 GWh |
#466 | Chippewa Falls | Chippewa Falls, WI | 58.9 GWh |
#467 | Marmet | Marmet, WV | 58.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lockhart.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
99 Islands | Blacksburg, SC | 62.1 GWh | 17.6 mi |
Atood II | Cowpens, SC | 3.9 GWh | 26.5 mi |
Broad River Energy Center | Gaffney, SC | 495.8 GWh | 21.8 mi |
Cherokee County Cogen | Gaffney, SC | 276.3 GWh | 22.1 mi |
Cherokee Falls | Blacksburg, SC | 1.5 GWh | 20.3 mi |
City West Diesel Plant | Union, SC | 64.0 MWh | 11.5 mi |
Cleveland Cnty Generating Facility | Kings Mountain, NC | 640.9 GWh | 27.1 mi |
Clifton Dam 3 Power Station | Converse, SC | 3.6 GWh | 26.1 mi |
Gaston Shoals | Blacksburg, SC | 19.3 GWh | 26.1 mi |
Limelight Solar II LLC | Spartanburg, SC | 2.8 GWh | 28.1 mi |
Midway Green Solar | Union, SC | 21.1 GWh | 25 mi |
Mill Creek (SC) | Blacksburg, SC | 38.5 GWh | 26.3 mi |
Mohea Solar Energy Center, LLC | Gaffney, SC | 8.6 GWh | 23.4 mi |
Neal Shoals | Union, SC | 5.8 GWh | 8 mi |
Roper Farm, LLC | Grover, NC | 9.4 GWh | 28.2 mi |
Sediver | York, SC | 63.0 MWh | 19.9 mi |
Thermal Kem | Rock Hill, SC | 55.0 MWh | 23 mi |
Union Renewable Energy Facility | Enoree, SC | 21.1 GWh | 23.5 mi |
Upper Pacolet Hydro | Pacolet, SC | 3.7 GWh | 19.1 mi |
Webb Forging | Carlisle, SC | 83.0 MWh | 15.5 mi |