Lockhart Solar PV II
43880 Harper Lake Rd, Hinkley, CA 92347Plant Summary Information
Lockhart Solar PV II is ranked #86 out of 799 solar farms in California in terms of total annual net electricity generation.
Lockhart Solar PV II generated 62.6 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Lockhart Solar PV II |
---|---|
Utility Name | Terra-Gen Operating Co-Solar |
Location | San Bernardino County, CA |
Initial Operation Date | July 2023 |
Last Update | Sep 2024 |
Annual Generation | 187.2 GWh |
Annual Consumption | 696.5 k MMBtu |
Ranked #2,397 out of 11,852 Power Plants Nationwide | |
Ranked #292 out of 5,655 Solar Power Plants Nationwide | |
Ranked #272 out of 1,570 California Power Plants | |
Ranked #86 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Lockhart Solar PV II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lockhart Solar PV II.
Monthly Net Generation for Lockhart Solar PV II
Lockhart Solar PV II Details
Summary Information | |
---|---|
Plant Name | Lockhart Solar PV II (66699) |
Plant Address | 43880 Harper Lake Rd, Hinkley, CA 92347 |
Utility | Terra-Gen Operating Co-Solar (61950) |
Latitude, Longitude | 35.04351, -117.3489 |
Generation Dates on File | Jul 2023 to Sep 2024 |
Initial Operation Date | July 2023 |
Annual Generation | 187.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | NA |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 220.00 kV |
Energy Storage | No |
Generator LOC2 Details Operating July 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 84.4 MW |
Summer Capacity | 75 MW |
Winter Capacity | 75 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 95.2 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Lockhart Solar PV II Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#282 | Red Mesa Solar Project | Red Mesa, UT | 192.9 GWh |
#283 | Lamesa Solar | Lamesa, TX | 192.6 GWh |
#284 | Aulander Holloman Solar, LLC | Aulander, NC | 190.9 GWh |
#285 | Robins Air Force Base Solar | Macon, GA | 190.7 GWh |
#286 | Utah Red Hills Renewable Energy Park | Parowan, UT | 189.8 GWh |
#287 | Crooked Lake Solar, LLC | Blytheville, AR | 189.6 GWh |
#288 | Three Peaks Power | Cedar City, UT | 189.5 GWh |
#289 | North Star Solar Project | North Branch, MN | 189.2 GWh |
#290 | White Pine Solar, LLC | Butler, GA | 188.2 GWh |
#291 | Playa Solar 1, LLC | North Las Vegas, NV | 187.7 GWh |
#293 | Bell Ridge Solar | Trenton, FL | 186.2 GWh |
#294 | Lapetus | Andrews, TX | 186.1 GWh |
#295 | Delta's Edge Solar | Greenwood, MS | 185.5 GWh |
#296 | OETN1 | Obion, TN | 185.1 GWh |
#297 | South Cheyenne Solar | South Greeley, WY | 183.0 GWh |
#298 | Water Strider Solar | Nathalie, VA | 181.9 GWh |
#299 | Sweetwater Solar | Green River, WY | 180.5 GWh |
#300 | Chesapeake Solar Project | Chesapeake, VA | 180.5 GWh |
#301 | Hopkins Energy LLC | Dike, TX | 180.3 GWh |
#302 | OE_ESCL | Grants, NM | 180.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lockhart Solar PV II.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alamo Solar | Oro Grande, CA | 43.7 GWh | 25 mi |
Daggett 2 | Daggett, CA | 447.5 GWh | 30.7 mi |
Daggett 3 | Daggett, CA | 857.5 GWh | 30.7 mi |
Expressway Solar A | Victorville, CA | 3.8 GWh | 31.9 mi |
Expressway Solar B | Victorville, CA | 4.1 GWh | 31.8 mi |
Expressway Solar C2 | Victorville, CA | 3.5 GWh | 31.7 mi |
Foundation Cemex BMQ | Apple Valley, CA | 3.5 GWh | 32 mi |
High Desert Power Plant | Victorville, CA | 4.6 TWh | 31 mi |
Hudson - High Desert Hybrid | Victorville, CA | 286.2 GWh | 28.2 mi |
Lockhart ESS, LLC | Hinkley, CA | 3.5 GWh | 0.9 mi |
Lockhart Solar PV, LLC | Hinkley, CA | 224.3 GWh | 1 mi |
Madelyn Solar, LLC | Silver Lake, CA | 2.5 GWh | 19.1 mi |
Mitchell Solar, LLC | Silver Lake, CA | 2.6 GWh | 19.3 mi |
Mojave Solar Project | Hinkley, CA | 627.0 GWh | 1.9 mi |
Resurgence Solar | Boron, CA | 233.7 GWh | 11.4 mi |
Resurgence Solar II | Boron, CA | 125.0 GWh | 11.4 mi |
Rudy Solar, LLC | Silver Lake, CA | 2.6 GWh | 19.2 mi |
SEGS IX | Hinkley, CA | 112.0 GWh | 1 mi |
SunEdison Walmart Apple Valley DC | Apple Valley, CA | 969.0 MWh | 32 mi |
US Borax | Boron, CA | 278.5 GWh | 19.9 mi |