Limestone Wind Project
TBD, Coolidge, TX 76635Plant Summary Information
Limestone Wind Project is ranked #80 out of 218 wind farms in Texas in terms of total annual net electricity generation.
Limestone Wind Project generated 158.0 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Limestone Wind Project |
---|---|
Utility Name | Limestone Wind Project, LLC |
Location | Navarro County, TX |
Initial Operation Date | December 2022 |
Last Update | Aug 2024 |
Annual Generation | 596.8 GWh |
Annual Consumption | 2.3 M MMBtu |
Ranked #1,097 out of 11,835 Power Plants Nationwide | |
Ranked #250 out of 1,343 Wind Power Plants Nationwide | |
Ranked #200 out of 749 Texas Power Plants | |
Ranked #80 out of 218 Texas Wind Power Plants | |
Fuel Types | Wind |
Map of Limestone Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Limestone Wind Project.
Monthly Net Generation for Limestone Wind Project
Limestone Wind Project Details
Summary Information | |
---|---|
Plant Name | Limestone Wind Project (65306) |
Plant Address | TBD, Coolidge, TX 76635 |
Utility | Limestone Wind Project, LLC (64611) |
Latitude, Longitude | 31.85346, -96.62446 |
Generation Dates on File | Dec 2022 to Aug 2024 |
Initial Operation Date | December 2022 |
Annual Generation | 596.8 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator LIMEW Details Operating December 2022
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 299.2 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 299.2 MW |
Winter Capacity | 299.2 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 88 |
Turbine Details | |
Number Of Turbines | 88 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 3.8-137 |
Design Wind Speed | 16.8 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 384 |
Limestone Wind Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#240 | Route 66 Wind Plant | Panhandle, TX | 614.8 GWh |
#241 | El Algodon Alto Wind Farm, LLC | Mathis, TX | 610.5 GWh |
#242 | Sweetwater Wind 4 LLC | Roscoe, TX | 609.9 GWh |
#243 | Bison 4 Wind Energy Center | New Salem, ND | 608.4 GWh |
#244 | South Plains Wind Phase I | Floydada, TX | 607.1 GWh |
#245 | Heart of Texas Wind Project | Brady, TX | 606.0 GWh |
#246 | Shamrock Wind | TBD, TX | 603.2 GWh |
#247 | NaturEner Rim Rock Energy | Kevin, MT | 601.5 GWh |
#248 | North Bend Wind Project, LLC | Highmore, SD | 599.5 GWh |
#249 | Maple Ridge Wind Farm | Lowville, NY | 599.2 GWh |
#251 | Cedar Springs II | Douglas, WY | 596.2 GWh |
#252 | Chapman Ranch Wind I | Corpus Christi, TX | 595.2 GWh |
#253 | Pattern Panhandle Wind 2 LLC | Panhandle, TX | 595.1 GWh |
#254 | Astra Wind Farm | Happy, TX | 593.6 GWh |
#255 | Wild Horse | Ellensburg, WA | 592.7 GWh |
#256 | Castle Gap Wind | Goldthwaite, TX | 591.0 GWh |
#257 | Cedar Creek II | New Raymer, CO | 589.5 GWh |
#258 | Jumbo Hill Wind Project | Andrews, TX | 588.6 GWh |
#259 | Kings Point Wind Energy Center | Golden City, MO | 587.8 GWh |
#260 | Langford Wind Power | Christoval, TX | 587.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Limestone Wind Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bosque County Peaking | Laquna Park, TX | 4.3 TWh | 43.1 mi |
BPL Files Solar | Itasca, TX | 282.2 GWh | 34.7 mi |
Briar Creek Solar 1 | Corsicana, TX | 235.0 GWh | 15 mi |
Elm Branch Solar 1 | Bardwell, TX | 287.2 GWh | 26.6 mi |
Ennis Power Company LLC | Ennis, TX | 1.4 TWh | 32.4 mi |
Freestone Energy Center | Fairfield, TX | 7.2 TWh | 30.1 mi |
Griffin Solar | Robinson, TX | 11.3 GWh | 40.1 mi |
Hubbard Wind | Mt Calm, TX | 992.8 GWh | 13.1 mi |
Limestone | Jewett, TX | 5.1 TWh | 37 mi |
Marlin Solar | Marlin, TX | 10.3 GWh | 41.9 mi |
Pisgah Ridge Solar, LLC | Richland, TX | 474.9 GWh | 9.7 mi |
Pitts Dudik Solar | Hubbard, TX | 100.7 GWh | 15 mi |
Prairie Hill Wind Project | Mart, TX | 227.9 GWh | 26.6 mi |
Roseland Solar Project, LLC | Riesel, TX | 875.9 GWh | 29.6 mi |
Sandy Creek Energy Station | Riesel, TX | 2.9 TWh | 32.7 mi |
Sun Valley Solar Project | Abbott, TX | 534.9 GWh | 22.9 mi |
Trinidad (TX) | Trinidad, TX | 330.6 GWh | 35.9 mi |
Waco Solar | Mount Calm, TX | 495.4 GWh | 15.1 mi |
WAL565 | Corsicana, TX | 249.0 MWh | 21.4 mi |
Whitney | Clifton, TX | 2.5 GWh | 43.6 mi |